Optimalisasi Biaya Dalam Perencanaan Gedung Kantor Menggunakan Software Building Information Modeling (BIM)

Bambang Hariyanto (Universitas Banten Jaya)
Dikri Robi (Universitas Banten Jaya)
Nila Prasetyo Artiwi (Universitas Banten Jaya)



Article Info

Publish Date
28 Oct 2026

Abstract

Conventional building planning based on two-dimensional drawings may create challenges in coordinating building elements, calculating material quantities, and preparing reliable cost estimates. This study examines the application of Building Information Modeling (BIM) to integrate design coordination, quantity take-off, construction scheduling, and cost estimation in the planning of a three-story Contractor Office Building in Serang City, Indonesia, with a total floor area of 450 m². A comparative approach was employed by developing a Level of Development (LOD) 300 model using Autodesk Revit 2023 and comparing its quantity and cost outputs with conventional planning documents. The analysis also involved clash detection and construction scheduling using Microsoft Project. The initial interference check identified 31 clashes between structural columns and tie beams. Following geometric adjustments and resolution procedures, the recheck detected no remaining interference within the tested elements and checking rules. The quantity take-off comparison showed deviations of 1.73% for reinforcement, 6.96% for formwork, and 12.58% for concrete, with conventional calculations producing higher quantities in all three categories. The resulting construction schedule indicated a planned duration of 83 working days. Furthermore, the BIM-based cost estimate amounted to IDR 1,382,971,143, compared with IDR 1,419,871,282 using conventional calculations, representing a difference of IDR 36,900,139 or 2.60%. These findings demonstrate the potential of BIM to connect geometric modeling, design coordination, quantity extraction, scheduling, and cost estimation within an integrated planning process. Nevertheless, the cost difference represents a comparison of planning estimates rather than verified savings during actual construction.

Copyrights © 2026






Journal Info

Abbrev

josce

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Engineering Materials Science & Nanotechnology Transportation

Description

JOSE bertujuan untuk: 1. Mempublikasikan informasi, pengetahuan dan hasil penelitian terkait dunia teknik sipil 2. Mempromosikan pendekatan komprehensif terhadap teknik sipil yang menggabungkan sudut pandang berbagai disiplin ilmu. 3. Memperkuat pertukaran akademik dengan institusi lain. 4. ...