BIM-Integrated EVM and CPM for Foundation Design Change in a Design-Build Tower Project

Arry Prabowo, Wahyu (Unknown)
Sugandi, R. Machmud (Unknown)
Hajji, Apif M. (Unknown)



Article Info

Publish Date
14 Oct 2026

Abstract

Background: Foundation design changes triggered by differing site conditions can alter quantities, activity logic, durations, and costs in design-build projects. Objective: This study evaluates how integrating Building Information Modeling (BIM), the Critical Path Method (CPM), and Earned Value Management (EVM) supports time- and cost-based assessment of a foundation design change in the Pelindo Office Tower project. Methods: A descriptive case-study design was applied using contract records, working drawings, schedule and cost data, and project documentation. Autodesk Revit 2024 was used to generate three-dimensional models and perform Quantity Take-Offs (QTOs); Microsoft Project 2019 was used to identify zero-float activities and calculate performance indicators; and Autodesk Navisworks Manage 2024 was used to visualize four-dimensional and five-dimensional sequences. Contract conditions were compared with the research model. Results: The design change increased the number of pile locations from 738 to 746 and the total pile length by 1.08%; however, the modeled duration decreased from 87 to 67.31 days, representing a 19.69-day (22.63%) reduction in duration. The research-model budget was IDR 16,919,996,110, which was IDR 570,693,850 (3.26%) below the initial contract value. This budget difference was associated with resequenced activities, optimized use of the Hydraulic Static Pile Driver, reduced waiting time, and lower time-related indirect costs. This difference should be distinguished from the EVM cost variance reported within the research model and should not be attributed to software integration alone. Conclusion: The framework improves traceability from design quantities to critical-path logic and earned-value indicators, supporting more informed decision-making under design uncertainty.

Copyrights © 2026






Journal Info

Abbrev

jbt

Publisher

Subject

Economics, Econometrics & Finance Industrial & Manufacturing Engineering Social Sciences

Description

This journal publishes research articles covering all aspects of information technology, information systems, agricultural technology, computer social and political sciences, and economics that belong to the business, social, and technological ...