A pile cap is a substructure element that ties a group of foundation piles together and transfers column loads to the piles, so errors in its construction may affect structural stability. This study describes the stages, materials, equipment, and quality control of the PC-10A pile cap work at the Collins Market Place shophouse project of PT Triniti Menara Serpong, Tangerang, and identifies field problems and their solutions. A case study approach was used, combining literature review, field observation, interviews, and documentation during an internship from 6 May to 6 August 2026. The PC-10A pile cap measures 5,000 × 1,834 × 1,000 mm and ties 10 driven piles. The work proceeded from marking, excavation, pile head chipping, and chemical anchors to anti-termite spraying, reinforcement, masonry-block formwork, casting of fc’30 MPa concrete, curing, and backfilling. Pull-out tests on five anchors at an 80 kN load showed good condition, and the 28-day compressive strength reached 29 MPa (97% of the design strength). The main problems were excavation conditions, anchor quality, thelimited strength of masonry-block formwork, casting time control, and the lack of structured occupational safety and health (OSH) practices. Stricter quality control and a more structured OSH implementation are recommended.
Copyrights © 2026