PELS (Procedia of Engineering and Life Science)
Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026

Industrial Layout of Children’s Modular Piano Chair: Layout Industri Kursi Modular Piano Anak

Silfi Liqoillah (Program Studi Teknik Industri1, Fakultas Sains dan Teknologi, Universitas Muhammadiyah Sidoarjo)
M. Rifqi Magfironi (Program Studi Teknik Industri1, Fakultas Sains dan Teknologi, Universitas Muhammadiyah Sidoarjo)
Diska Widyo Pratama (Program Studi Teknik Industri1, Fakultas Sains dan Teknologi, Universitas Muhammadiyah Sidoarjo)
Renanda Prasetyo Putra (Program Studi Teknik Industri1, Fakultas Sains dan Teknologi, Universitas Muhammadiyah Sidoarjo)
Salsabilla Amina Laurentza (Program Studi Teknik Industri1, Fakultas Sains dan Teknologi, Universitas Muhammadiyah Sidoarjo)
Atikha Sidhi Cahyana (Program Studi Teknik Industri1, Fakultas Sains dan Teknologi, Universitas Muhammadiyah Sidoarjo)



Article Info

Publish Date
22 Nov 2026

Abstract

General Background Facility layout planning arranges work areas, machinery, and material handling workflows to support smooth production and operational sustainability. Specific Background For children's modular piano chairs combining multifunctionality with motor-skill support, structured department arrangement and material transport control are essential across manufacturing stages. Knowledge Gap Existing facility layout studies often examine general manufacturing or standard layouts rather than integrating activity relationships, material flow volumes and handling costs, and layout scoring specifically for modular children's piano chair production. Aims This study determines an efficient facility layout for a children's modular piano chair manufacturing industry using an Activity Relationship Chart (ARC), From To Chart (FTC), and the Blocplan algorithm. Results Sequential flows from raw material storage to finished goods storage receive an A closeness rating while A0/A to E0 pairings receive an X rating; total handling volume reaches 2,304 units with a total handling cost of Rp 4,891,728 dominated by downstream stages, and Blocplan layout alternative 5 achieves an Adjusted Score of 0.95 and a Relationship-Distance Score of 0.87. Novelty This study applies ARC, FTC, and Blocplan layout evaluation to a children's modular piano chair production line while quantifying material handling volumes and costs across departments. Implications Selecting layout alternative 5 and targeting downstream handling flows provide practical department arrangement guidance for modular furniture production. Key Findings Highlights Sequential production flows from raw material storage to finished goods carry absolute closeness priority while early departments and finished goods remain separated to avoid odor and crowding. Material movement totals 2,304 units and costs Rp 4,891,728 overall, with downstream transfers contributing the highest handling expenses. Layout alternative 5 records the highest Adjusted Score of 0.95 alongside a 0.87 Relationship-Distance Score among ten evaluated options. Keywords Facility Layout Planning, Activity Relationship Chart, From To Chart, Blocplan Algorithm, Material Handling  

Copyrights © 2026






Journal Info

Abbrev

PELS

Publisher

Subject

Computer Science & IT Control & Systems Engineering Electrical & Electronics Engineering Engineering

Description

PELS (Procedia of Engineering and Life Science) is an international journal published by Faculty of Science and Technology Universitas Muhammadiyah Sidoarjo. The research article submitted to this online journal will be double blind peer-reviewed (Both reviewer and author remain anonymous to each ...