General Background Facility layout planning arranges work areas, machinery, and material transfer workflows to support smooth production and cost control. Specific Background For modular cat chairs designed for reassembly and multifunctionality, structured department arrangement and material movement planning are essential across manufacturing stages. Knowledge Gap Existing facility layout studies often address general manufacturing or conventional layout tools separately rather than combining activity closeness analysis, material handling volume and cost evaluation, and BLOCPLAN layout scoring for modular cat chair production. Aims This study analyzes facility layout planning for modular cat chair production using an Activity Relationship Chart (ARC), Activity Relationship Diagram (ARD), From-To Chart (FTC), and BLOCPLAN software to organize department relationships, evaluate material handling volume and cost, and select an efficient layout alternative. Results Existing department ordering is inefficient, and among ten BLOCPLAN layout alternatives, layout 6 achieves an Adjusted Score of 0.92 and a Relationship–Distance Score of 0.82, while the layout evaluation reports a total material displacement distance of 76.89 meters and a total material handling cost of Rp 5,066,066. Novelty This study applies ARC, ARD, FTC, and BLOCPLAN evaluation to modular cat chair manufacturing while documenting material movement volumes, handling costs, and displacement distance for the selected layout. Implications Adopting layout 6 and aligning department sequence with workflow relationships provide practical guidance for organizing modular furniture production and controlling handling expenses. Key Findings Highlights Non-sequential department ordering reduces current layout efficiency, whereas BLOCPLAN layout 6 attains the highest Adjusted Score of 0.92 and a Relationship–Distance Score of 0.82 among ten alternatives. Material flow analysis via From-To Chart and layout evaluation records a total handling cost of Rp 5,066,066 and a total material displacement distance of 76.89 meters. Closeness ratings and reason codes in ARC and ARD clarify sequential workflow priority and spatial separation needs across production and storage areas. Keywords Facility Layout Planning, Activity Relationship Chart, From-To Chart, BLOCPLAN Algorithm, Material Handling