Industrial Layout of Children’s Modular Piano Chair: Layout Industri Kursi Modular Piano Anak Silfi Liqoillah; M. Rifqi Magfironi; Diska Widyo Pratama; Renanda Prasetyo Putra; Salsabilla Amina Laurentza; Atikha Sidhi Cahyana
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/e9mq0866

Abstract

General Background Facility layout planning arranges work areas, machinery, and material handling workflows to support smooth production and operational sustainability. Specific Background For children's modular piano chairs combining multifunctionality with motor-skill support, structured department arrangement and material transport control are essential across manufacturing stages. Knowledge Gap Existing facility layout studies often examine general manufacturing or standard layouts rather than integrating activity relationships, material flow volumes and handling costs, and layout scoring specifically for modular children's piano chair production. Aims This study determines an efficient facility layout for a children's modular piano chair manufacturing industry using an Activity Relationship Chart (ARC), From To Chart (FTC), and the Blocplan algorithm. Results Sequential flows from raw material storage to finished goods storage receive an A closeness rating while A0/A to E0 pairings receive an X rating; total handling volume reaches 2,304 units with a total handling cost of Rp 4,891,728 dominated by downstream stages, and Blocplan layout alternative 5 achieves an Adjusted Score of 0.95 and a Relationship-Distance Score of 0.87. Novelty This study applies ARC, FTC, and Blocplan layout evaluation to a children's modular piano chair production line while quantifying material handling volumes and costs across departments. Implications Selecting layout alternative 5 and targeting downstream handling flows provide practical department arrangement guidance for modular furniture production. Key Findings Highlights Sequential production flows from raw material storage to finished goods carry absolute closeness priority while early departments and finished goods remain separated to avoid odor and crowding. Material movement totals 2,304 units and costs Rp 4,891,728 overall, with downstream transfers contributing the highest handling expenses. Layout alternative 5 records the highest Adjusted Score of 0.95 alongside a 0.87 Relationship-Distance Score among ten evaluated options. Keywords Facility Layout Planning, Activity Relationship Chart, From To Chart, Blocplan Algorithm, Material Handling