cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota serang,
Banten
INDONESIA
Jurnal Sistem dan Manajemen Industri
ISSN : 25802887     EISSN : 25802895     DOI : -
Core Subject : Engineering,
This journal aims to publish the results of research in the field of Industrial Engineering is published twice a year, managed by the University of Serang Raya. The scope of Sciences covers Operations Research, Manufacturing System, Industrial Management, Ergonomics and Work System, Logistics and Supply Chain Management, and other scientific studies in accordance with scope field of Industrial Engineering research.
Arjuna Subject : -
Articles 16 Documents
Search results for , issue "Vol. 1 No. 1 (2017)" : 16 Documents clear
Sistem Penentuan Supplier Kawat Las Dengan Metode Analitycal Hierarchy Process (AHP) dan Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) Ramayanti, Gina; Ulum, Hidayatul
Jurnal Sistem dan Manajemen Industri Vol. 1 No. 1 (2017)
Publisher : Universitas Serang Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (428.858 KB) | DOI: 10.30656/jsmi.v1i1.166

Abstract

Supplier selection is being a strategic activity, especially when the supplier is supplying materials that will be used in the long term. In the world of construction, one part of the supply chain which has a significant contribution to the improvement of the company's effectiveness is the efficiency in the procurement of materials (raw materials) from suppliers. In the research found the problem of 50 TON of welded wire failed. This study aims to determine the criteria based on the company needs in determining the supplier of welding wire and provide the ranking of suppliers as a material consideration in determining the supplier. The study used the Analytical Hierarchy Process (AHP) method for the selection of criteria and the Technique For Order Performance By Similiar To Ideal Solution for rating or evaluating alternative suppliers. Based on the results of AHP calculation we get the weight of each criteria as follows, for the quality of 0.0644, the price 0.056, the delivery time of 0.158, the quantity 0.053, the response to the claim of 0.093, and from the criteria are made reference to the calculation of vendor selection using TOPSIS. Results obtained supplier S2, i.e., PT.Esabindo Pratama ranked first as a priority supplier with a preference value of 0.322. Excellence which is owned by supplier S2 (PT.Esabindo Pratama) are the criteria of quality, price, quantity
Implementasi Six Sigma untuk Perbaikan Produk Nickel Pig Iron Jihan Shofa, Mohamad; Gunawan, Hadi
Jurnal Sistem dan Manajemen Industri Vol. 1 No. 1 (2017)
Publisher : Universitas Serang Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (389.318 KB) | DOI: 10.30656/jsmi.v1i1.171

Abstract

PT. INF is a steel mining company. It produce such as nickel pig iron. Nickel pig iron used raw materials stainless steel factory, nickel and steel mill rolls. The number of defective products for nickel pig iron in a few months getting on upward trend. This research will analyze the cause of the increasing defect product by using Six Sigma methode. Furthermore, the proposed improvement is done by using the failure mode and effect analysis (FMEA) approach. The results shows the main problems are the higher value of Silica (Si) and phospor (P), the sigma level is obtained from the annual pig iron making process in 1.6 sigma, process improvement need to be done are monitoring and scheduling of burnlime powder orders, checking new materials by testing the formula against new materials, and making a repair schedule as well as focusing on changes in pressure on the monitor screen
Analisa Pengaruh Pengaturan Kerja Operator Terhadap Pencapaian Keluaran Produksi Nurlaila, Qomarotun
Jurnal Sistem dan Manajemen Industri Vol. 1 No. 1 (2017)
Publisher : Universitas Serang Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (357.696 KB) | DOI: 10.30656/jsmi.v1i1.172

Abstract

PT. XYZ is a manufacturing company that produces the constituent components of HDD (Hard Disk Drive) products. One of the products produced by PT. XYZ made from rubber. The product has a strict specification, both for the accuracy of size and for display. One of the problems faced by PT. XYZ is the output of a 100% unstable check section even though the amount of human resources used is the same every day. There is a variation of the output / clock / operator from 650 to 714.4 pieces. This study aims to analyze the cause of the variation of output / hour / operator and to find solutions to minimize the output variation. The result of this research can be concluded that the cause of variation of output / hour / operator is the number of product type checked by operator not always the same every day. Where more and more types of products are checked then the smaller the output on that day. To get maximum results then the operator only do one type of product every day. If not possible then cultivated to a minimum operator change the type of product checked. It requires expertise from the supervisor to manage the work of the operator in an effort to get the maximum output.
Pengendalian Kualitas Proses Pengemasan Gula Dengan Pendekatan Six Sigma Kusumawati, Aulia; Fitriyeni, Lailatul
Jurnal Sistem dan Manajemen Industri Vol. 1 No. 1 (2017)
Publisher : Universitas Serang Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (91.753 KB) | DOI: 10.30656/jsmi.v1i1.173

Abstract

The main factor to achieve business success in the era of globalization is quality. Quality control is key in maintaining customer loyalty. In the company's production process is still found the resulting product does not comply with the specified specifications. This study aims to determine the value of sigma and factors causing damage to the production process of bagging section For companies with quality control is expected to achieve corporate goals. In this study, the methods used is Six Sigma with define, measure, analyze, improve. Six Sigma result is measurement of company performance baseline at measurement stage that is company at condition 5,1 sigma with DPMO equal to 162,4532. The factors causing the disability of sugar packing are lack of research and skill of the operator, instability of conveyor speeds and jet engine position, machine hygiene condition, lack of weighing machine, and ineffective treatment, and control method.
Analisa Infrastruktur Desa Sukaci-Baros Dengan Metode Critical Path Method (CPM) Nalhadi, Ahmad; Suntana, Nana
Jurnal Sistem dan Manajemen Industri Vol. 1 No. 1 (2017)
Publisher : Universitas Serang Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (425.822 KB) | DOI: 10.30656/jsmi.v1i1.167

Abstract

CV. ABP a construction company worked in infrastructure building development for private and goverment. Now CV. ABP is handling infrastructure development project of the acropolitan area (Right Payment) Sukaci - Baros Village. This project has been late for 19 days from the dead line 126 days. Therefore the cost is getting higher. It happened because bad management is the problem source. Restoring the project time need to be focused on the cost and the due date based on the schedule. Scheduling evaluation using Critical Path Method (CPM) and Crashing to find optimal results using Critical Path Method (CPM) can be found the critical paths activity, there are ground digging , bopflang installation, stone installation, agregrate B agrgregation , aggregate A flatting, rigit bavement work, and refining, when the time suppression obtained optimal time results from 126 days to 92 days. It taken an alternative to the addition of working hours with duration 92 day after the crashing. Using two alternatives, additional working hours and the addition of workforce, obtaining the difference of extra hours of work cost Rp 80.128.125 and labourcost increase Rp 55.260 from the regular cost.
Halaman Depan Vol. 1 No. 1, Juli 2017 admin, admin
Jurnal Sistem dan Manajemen Industri Vol. 1 No. 1 (2017)
Publisher : Universitas Serang Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (95.61 KB) | DOI: 10.30656/jsmi.v1i1.703

Abstract

Page 2 of 2 | Total Record : 16