cover
Contact Name
Husnah
Contact Email
husnah@univrab.ac.id
Phone
-
Journal Mail Official
jurnal.ts@univrab.ac.id
Editorial Address
Redaktur Jurnal RACIC Universitas Abdurrab: Gedung Universitas Abdurrab Pekanbaru Jl. Riau Ujung No. 73 Pekanbaru Riau - Indonesia
Location
Kota pekanbaru,
Riau
INDONESIA
RACIC : Rab Construction Research
Published by Universitas Abdurrab
ISSN : 25277073     EISSN : 26203170     DOI : https://doi.org/10.36341/racic
Core Subject : Engineering,
RACIC "Rab Construction Research" (ISSN 2527-7073) adalah Jurnal yang dikelola oleh Program Studi Teknik Sipil, Fakultas Teknik Universitas Abdurrab, yang terbit secara berkala dalam dua edisi per tahun.
Arjuna Subject : -
Articles 5 Documents
Search results for , issue "Vol 4 No 2 (2019): Desember" : 5 Documents clear
PENGARUH LIMBAH PLASTIK BOTOL (LELEH) SEBAGAI MATERIAL TAMBAH TERHADAP KUAT LENTUR BETON DONI RINALDI BASRI
Racic : Rab Construction Research Vol 4 No 2 (2019): Desember
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (914.062 KB)

Abstract

In construction concrete is the most widely used building material in the world, both in construction. Concrete is a composite building material made from a combination of aggregate and cement binder. The most common form of concrete is portland cement concrete, which consists of mineral aggregates (gravel, and sand), cement and water. Indonesia is the country with the 2nd largest plastic waste producer in the world on June 7, 2017, with data on the amount of plastic in the high seas of Indonesia reaching 0.48-1.29 million tons annually. Therefore, one way to cope with plastic waste, on this occasion the author tries to conduct an experiment about the Effect of Utilization of Bottled Plastic Waste as an Additional Material on Concrete Flexural Strength. This research was carried out by making concrete with the addition of alternative polymeric materials, namely plastic bottle waste (PET). The variation of the percentage of the addition of plastic bottle waste in this study is 0%, 2%, 3%, 5% of the mass of cement and concrete material used materials originating from Kampar Regency and Padang cement with the type of PCC (Portland Composite Cement). The results of the flexural strength test, obtained the quality of concrete has decreased, which in the mix of 3% decreased concrete quality is quite low from the mixture (0%, 2%, 3% & 5%), from 53.93 kg / cm2 in the mixture of 0% to 45.09 kg / cm2 in a mixture of 3%.
A Decision Making PEMILIHAN LOKASI PENANGANAN PANTAI PROVINSI RIAU BERDASARKAN ANALYTICAL HIERARCHY PROCESS (AHP) Rizki Ramadhan Husaini
Racic : Rab Construction Research Vol 4 No 2 (2019): Desember
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (746.864 KB)

Abstract

ABSTRACT Riau Province is one of the provinces that has several coastal areas, both in the mainland and the islands. The handling of many coastal locations in Riau Province is a problem for relevant agencies in making decisions about which coastal locations will be prioritized for handling. This study analyzes the level of coastal vulnerability and decision-making systems in terms of determining the priority of coastal areas to be handled using the Analytical Hierarchy Process (AHP) method. The results showed that Tanjung Motong beach, Kepulauan Meranti Regency and Coastal Pambang Beach in Bengkalis Regency were the highest vulnerability beaches with a value of 244.95. The criteria for strategic issues with sub-criteria for national strategic areas have the highest level of influence for determining the priority of coastal handling areas, which is 73%. Coastal Pambang Beach in Bengkalis Regency is a coastal area that is located in a national strategic area that gets priority handling. Keywords: Beach, Vulnerability, Priority, Criteria, Analytical Hierarchy Process (AHP)
PERILAKU STRES JALUR UJI TRIAKSIAL PADA TANAH LEMPUNG KARAWANG puspa ningrum
Racic : Rab Construction Research Vol 4 No 2 (2019): Desember
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1609.377 KB)

Abstract

Generally, laboratory testing to determine the value of soil shear strength and stress path is triaxial test, especially for clay soil. In this research, the clay used for digital triaxial testing on axial compression (AC) stress path is Karawang clay soil, West Java, which have high plasticity (CH) in USCS classification. On pre-saturation process, a combination of vaccum and back pressure is used to speed up the saturation of the sample and to provide a high degree of saturation. Furthermore, the obtained soil parameters are used as inputs on finite element modeling which Mohr Coloumb and Hardening Soil model were used as the soil constitutive models. The results show that parameter optimization using hardening soil modeling has a behavior that is closer to the shape of the stress strain curve from laboratory tests.
PERILAKU STRUKTUR LANTAI PSSDB (PROFILED STEEL SHEET DRY BOARD) DENGAN LUBANG BULAT DITENGAH Muhammad Yazid
Racic : Rab Construction Research Vol 4 No 2 (2019): Desember
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (769.828 KB)

Abstract

The knowledge on the behaviour of a building structure is very important in order to predict the behaviour of the structure before it is constructed. This is to ensure that the structure is safe to be used. New current modern technology is now able to predict the behaviour of a structure through computer simulation as a replacement to laboratory tests. However, laboratory tests will also have to be performed in order to validate the proposed computer models. This thesis illustrates the prediction of the structural behaviour of Profiled Steel Sheet Dry Board (PSSDB) which is a structural composite floor system constructed of Bondek II (profiled steel sheeting), Cemboard (dry board) connected via Power Drive DX14 (self drilling, self tapping screws). The floor structure is loaded with a uniformly distributed loading and its behaviour due to the openings at the center of the panel analysed using a finite element perangkat lunak package, LUSAS-FE. The one-way spanning plate have been analysed in this research. The increase in deflection in the longitudinal direction is found to be more influenced by the presence of the opening than the deflection in the transverse direction. The average percentage of the increase in deflection of the one-way spanning plate due to the presence of 20%, 40%, and 60% opening of its overall width are 36%, 108%, and 184% respectively in comparison to the deflection of plate without opening. It has been found that as the size of opening increases, the deflection also increased.
IDENTIFIKASI FAKTOR YANG BERPENGARUH TERHADAP KINERJA WAKTU PELAKSANAAN PROYEK PENGADAAN TRANSMISI 500KV SUMATERA Burhanuddin Robbani
Racic : Rab Construction Research Vol 4 No 2 (2019): Desember
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (681.083 KB)

Abstract

The construction of the 500 kV Sumatra transmission network is the main project supporting the transmission line below and first on the island of Sumatra. With the Engineering, Procurement, and Construction (EPC) project scheme in its implementation the main contractor experienced several technical and non-technical constraints that affected the time performance of the project itself. This study aims to identify the factors that influence the performance of the project implementation time from the pre-construction stage (licensing, land clearing, and design planning) to the construction of the construction. The research method used is a survey method of the Project Implementation Unit with analysis using the Relative Importance Index (RII) method. The results showed that factors related to licensing problems from the government, inaccurate survey data (Pre-Design), and scarcity of raw materials are the three main problems that affect the performance time of the Sumatra 500 kV transmission development project

Page 1 of 1 | Total Record : 5