cover
Contact Name
Zulkifli
Contact Email
ftiuap@gmail.com
Phone
-
Journal Mail Official
zulkifli@aisyahuniversity.ac.id
Editorial Address
Jl. A. Yani, No 1A, Tambahrejo, Kec. Gadingrejo, Kab. Pringsewu, Lampung, Indonesia
Location
Kab. pringsewu,
Lampung
INDONESIA
Aisyah Journal of Informatics and Electrical Engineering
ISSN : 26860139     EISSN : 26859556     DOI : -
Aisyah Journal Of Informatics and Electrical Engineering (A.J.I.E.E) is intended as a medium for scientific studies of research results, thoughts, and critical-analytic studies regarding research in the field of computer science, technology and Electrical Engineering, including Systems Engineering, Informatics Engineering/Information Technology, Informatics Management, Information Systems and Electrical. It is part of the spirit of disseminating knowledge resulting from research and thoughts for the service of the wider community. Aisyah Journal Of Informatics and Electrical Engineering (A.J.I.E.E) publishes papers regularly two times a year, namely in February and August. All publications in AJIEE journals are open, allowing articles to be freely available online without a subscription. Aisyah Journal Of Informatics and Electrical Engineering (A.J.I.E.E) accepts scientific articles with research scopes on: Information System and Multimedia Internet of Things (IoT) Software Engineering Database System Information Engineering Artificial Intelligence Signal Processing and Analysis Computing and Processing Cloud Computing, IT Forensic Robotic and Control Mobile Computing and Programing Communication Networking Security and Broadcasting Power, Energy and Industry
Articles 132 Documents
INFRARED SENSOR OBSTACLE AVOIDANCE SEBAGAI SAKLAR KONTROL PADA HAND SANITIZER OTOMATIS Zulfi, Muhammad; Hidayat, Rahmat
Aisyah Journal Of Informatics and Electrical Engineering (A.J.I.E.E) Vol. 4 No. 2 (2022): Aisyah Journal Of Informatics and Electrical Engineering
Publisher : Aisyah Journal Of Informatics and Electrical Engineering (A.J.I.E.E)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30604/jti.v4i2.118

Abstract

Penggunaan sensor infrared dalam pembuatan hand sanitizer otomatis merupakan salah satu pembaruan yang cukup dibutuhkan pada masa pandemi ini. Sensor infrared sebagai saklar otomatis yang akan berfungsi untuk mengatur keluaran hand sanitizer yang ditempatkan pada suatu botol dengan cara mendeteksi pergerakan objek yang didekatkan pada sensor. Cara kerja alat ini terbilang cukup sederhana namun dapat membantu untuk meminimalisir dari sentuhan pada penggunaan hand sanitizer bersama. Komponen yang digunakan pada pembuatan antara lain Arduino Uno R3 sebagai pengontrol, IR Obstacle Avoidance sebagai pendeteksi objek, Micro Servo SG90 sebagai penggerak tuas.
ANALISIS SISTEM PROTEKSI MEKANIK RELE BUCHOLZ PADA TRANSFORMATOR 150KV/20KV DI PT PLN (PERSERO) UPT BEKASI Ardiansyah, Muhamad; Hidayat, Rahmat
Aisyah Journal Of Informatics and Electrical Engineering (A.J.I.E.E) Vol. 4 No. 2 (2022): Aisyah Journal Of Informatics and Electrical Engineering
Publisher : Aisyah Journal Of Informatics and Electrical Engineering (A.J.I.E.E)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30604/jti.v4i2.119

Abstract

Energi listrik merupakan sebuah kebutuhan yang wajib terpenuhi. Karena banyak aktivitas manusia yang harus digerakan menggunakan energi listrik. Energi listrik banyak didapatkan melalui pembangkit, mulai dari pembangkit listrik tenaga air, pembangkit listrik tenaga gas, pembangkit listrik tenaga surya. Transformator merupakan sebuah komponen penting yang berfungsi sebagai penyalur energi listrik dari pembangkit menuju transmisi. Dalam melakukan kinerja nya transformator mempunyai banyak gangguan yaitu ada yang gangguan dari internal dan gangguan eksternal. Agar dapat meminimalisir dan juga mencegah terjadinya gangguan pada transformator maka tedapat sebuah sistem proteksi pada transformator yang berfungsi untuk melindungi komponen penting pada transformator dan juga untuk meminimalisir, mencegah gangguan pada transformator. Tujuan penelitian yang dilakukan adalah untuk mengetahui sistem proteksi pada transformator dengan menggunakan relay bucholz di Gardu Induk 150 KV/20 KV Poncol Baru PT PLN (Persero) Unit Pelaksana Transmisi Bekasi. Metode penelitian yang dilakukan adalah dengan studi literatur dari beberapa referensi yang diberikan oleh pihak PLN terkait dengan sistem proteksi, studi lapangan dengan cara mengamati proses sistem proteksi di Switchyard, lalu menganalisa dan mengambil kesimpulan.
ANALISA PENERAPAN SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) DI GARDU INDUK 150 KV PONCOL BARU PT PLN (PERSERO) UNIT PELAKSANA TRANSMISI BEKASI Fakih, Rheza Aryo; Hidayat, Rahmat
Aisyah Journal Of Informatics and Electrical Engineering (A.J.I.E.E) Vol. 4 No. 2 (2022): Aisyah Journal Of Informatics and Electrical Engineering
Publisher : Aisyah Journal Of Informatics and Electrical Engineering (A.J.I.E.E)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30604/jti.v4i2.120

Abstract

PT PLN (Persero) sebagai perusahaan yang asset sensitive dimana pengelolaan aset memberikan kontribusi yang besar dalam keberhasilan usahanya. Semakin meningkatnya kebutuhan pasokan tenaga listrik dari pelanggan atau konsumen kalangan industri dan konsumen umum maka berdampak pada pertambahan jumlah instalasi tenaga listrik di Gardu Induk PT PLN (Persero) sehingga akan berdampak pula pada kebutuhan sumber daya manusia yang ahli di bidang tenaga listrik. Namun pada kenyataannya saat ini di PT PLN (Persero) UPT Bekasi mengalami kekurangan sumber daya manusia yang ahli untuk menangani pengawasan, pelaksanaan, perbaikan dan pemeliharaan instalasi Gardu Induk di wilayah kerja UPT Bekasi. Dengan demikian sistem Supervisory Control And Data Acquisition (SCADA) sangat diperlukan dan akan sangat membantu kinerja serta pengurangan cost yang berlebihan di Gardu Induk 150 KV Poncol Baru PT PLN (Persero) Unit Pelaksana Transmisi Bekasi. Pembahasan yang akan dijabarkan yaitu tentang analisa perubahan yang dihasilkan ketika sebelum dan setelah menggunakan sistem SCADA di Gardu Induk 150 KV Poncol Baru PT PLN (Persero) Unit Pelaksana Transmisi Bekasi.
PENGARUH MATERIAL INTI BESI TERHADAP NILAI BACK-EMF DAN KE PADA PERMANENT MAGNET SYNCHRONOUS GENERATOR 12S8P MENGGUNAKAN SOFTWARE BERBASIS FINITE ELEMENT METHOD Iqbal Fadillah, Muhammad; Abdi Bangsa, Insani
Aisyah Journal Of Informatics and Electrical Engineering (A.J.I.E.E) Vol. 4 No. 2 (2022): Aisyah Journal Of Informatics and Electrical Engineering
Publisher : Aisyah Journal Of Informatics and Electrical Engineering (A.J.I.E.E)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30604/jti.v4i2.121

Abstract

The iron core is a major component in the generator, of course also in the Permanent Magnet Synchronous Generator (PMSG). In this journal we will vary the iron core, there are two iron cores, namely the rotor and the stator. Varying this iron core by replacing the material on the stator and rotor with a rotor, stator and rotor-stator scheme. By varying the material in the iron core, we will analyze, then conclude the Back-EMF value and KE value. The essence of this journal is to vary the iron core material on the Permanent Magnet Synchronous Generator (PMSG) 12S8P so as to obtain BACK-MF and KE values. Keywords: Generator, PMSG, Iron Core
INSTALASI PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) PHOTOVOLTAIC ROOFTOP PADA GEDUNG GARDU INDUK KANTOR PUSAT PT PEMBANGKIT JAWA BALI Tri Cahyo Wicakono, Mario; Abdi Bangsa, Insani
Aisyah Journal Of Informatics and Electrical Engineering (A.J.I.E.E) Vol. 4 No. 2 (2022): Aisyah Journal Of Informatics and Electrical Engineering
Publisher : Aisyah Journal Of Informatics and Electrical Engineering (A.J.I.E.E)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30604/jti.v4i2.122

Abstract

Indonesia is one country that gets high light intensity and is crossed by the equator. Indonesia has a lot of potential natural resources, one of which is the sun that can be used properly. With high light intensity, Indonesia has the potential to install Solar Power Plants, in Indonesia itself since 2014 the installation of 53.585 MW power plants. In PLTS there are 2 types, namely On-Grid and Off-grid. On-grid method is a direct method without a battery. The Off-grid method is a method of using batteries as a storage for solar energy that has been converted into electricity. For installation at the Substation Headquarters of PT Pembangkit Jawa Bali using the On-grid method and also installation on the rooftop as many as 51 units. The PLTS installation generates 113,425 kWh/day. The following is the maximum capacity generated from the installation for one day, depending on the state of the intensity of the sun emitted by the PLTS.. Indonesia termasuk kedalam satu negara yang mendapatkan intensitas cahaya yang tinggi dan dilintasi garis khatulistiwa. Indonesia mempunya potensi sumberdaya alam yang sangat banyak salah satunya yaitu matahari dapat dimanfaatkan dengan baik. Dengan intensitas cahaya yang tinggi Indonesia berpotensi memasang Pembangkit Listrik Tenaga Surya, di Indonesia sendiri terhitung sejak 2014 pemasangan pembangkit 53,585 MW. Dalam PLTS ada 2 jenis yaitu On-Grid dan Off-grid. Metode On-grid merupakan metode langsung tanpa aki. Metode Off-grid merupakan metode menggunakan aki sebagai penyimpanan energi matahari yang sudah di konversi menjadi listrik. Untuk pemasangan di Gardu Induk Kantor Pusat PT Pembangkit Jawa Bali menggunakan metode On-grid dan juga pemasangan di rooftop sebanyak 51 unit. Instalasi PLTS tersebut manghasilkan 113,425 kWh / hari. Berikut itu merupakan kapasitas maksimal yang dihasilkan dari instalasi tersebut selama satu hari, tergantung dengan keadaan intensitas matahari yang di pancarkan pada PLTS tersebut.
ANALISA SISTEM KELISTRIKAN PADA RUANG OPERASI DI TZU CHI HOSPITAL MENURUT STANDAR PERATURAN MENTERI KESEHATAN Choerudin, Muhammad; Abdi Bangsa, Insani
Aisyah Journal Of Informatics and Electrical Engineering (A.J.I.E.E) Vol. 4 No. 2 (2022): Aisyah Journal Of Informatics and Electrical Engineering
Publisher : Aisyah Journal Of Informatics and Electrical Engineering (A.J.I.E.E)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30604/jti.v4i2.123

Abstract

ABSTRACT The purpose of this study was to determine whether or not the electrical system applied to the operating room at the TZU CHI HOSPITAL hospital was in accordance with the applicable health ministerial regulations. with the qualitative method, data collection is done by means of observation, documentation, and field measurements where the results of the data will be analyzed whether or not it is in accordance with the regulations of the minister of health. The operating room is a vital unit in the hospital, therefore its construction must be in accordance with the design that has been stipulated in the regulation of the minister of health. As in the operating room electrical system, many of the equipment used in the operating room requires electricity and most of the equipment is in direct contact with patients and people around the electrical equipment. So the regulation of the minister of health has stipulated an electrical system that must be applied to every operating room. The results of the research on the electrical system installed in the operating room at TZU CHI HOSPITAL are in accordance with the regulations of the minister of health, where the electrical system already uses an isolator transformer which functions as a safety, so that people in the operating room are not electrocuted when there is a surge. and the main electrical system already uses UPS which functions as backup electricity so that when a power blackout, the electricity in the operating room will remain on. Keywords: UPS; Operating Theater; Electricity System; Minister of Health Regulation ABSTRAK Tujuan penelitian ini yaitu untuk mengetahui sesuai atau tidaknya sistem kelistrikan yang diterapkan pada ruang operasi di rumah sakit TZU CHI HOSPITAL dengan peraturan menteri kesehatan yang berlaku. dengan metode kualitatif, pengambilan data dilakukan dengan cara observasi, dokumentasi, dan pengukuran dilapangan yang mana hasil data akan di analisa sesuai atau tidaknya dengan peraturan menteri kesehatan. Ruang operasi merupakan unit vital yanga ada pada rumah sakit, oleh karena itu pembangunannya harus sesuai dengan desain yang sudah ditetapkan pada peraturan menteri kesehatan. Seperti pada sistem kelistrikan ruang operasi, banyak peralatan yang digunakan pada ruang operasi sebagian besar membutuhkan listrik dan sebagian besar peralatan tersebut berhubungan langsung dengan pasien dan orang disekitar peralatan listrik. Sehingga peraturan menteri kesehatan sudah menetapkan sistem kelistrikan yang harus diterapkan pada setiap ruang operasi. Hasil penelitian sistem kelistrikan yang terpasang pada ruang operasi di TZU CHI HOSPITAL sudah sesuai dengan peraturan menteri kesehatan, dimana pada sistem kelistrikan sudah menggunakan trafo isolator yang berfungsi sebagai pengaman, agar orang yang berada diruang operasi tidak tersengat listrik ketika terjadi lonjakan arus. dan pada sistem kelistrikan utama sudah menggunakan ups yang berfungsi sebagai listrik cadangan sehingga ketika terjadi pemadaman listrik, maka listrik pada ruang operasi akan tetap menyala. Kata Kunci: UPS; Ruang Operasi; Sistem Kelistrikan; dan Permenkes
STUDI ANALISA PERHITUNGAN NILAI HARMONIK TEGANGAN DAN ARUS PADA BUDDHA TZU CHI HOSPITAL Laurensius Richard Mulyadi Richard; Insani Abdi Bangsa
Aisyah Journal Of Informatics and Electrical Engineering (A.J.I.E.E) Vol. 5 No. 1 (2023): Aisyah Journal Of Informatics and Electrical Engineering
Publisher : Aisyah Journal Of Informatics and Electrical Engineering (A.J.I.E.E)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30604/jti.v5i1.124

Abstract

ABSTRACT The occurrence of harmonics is caused by the non-linear operation of the electrical load. The level of harmonic distortion or what is called Total Harmonic Distortion (THD) in a transformer can cause losses that affect the efficiency of the transformer. In this study, THD measurements were carried out on four transformers at Tzu Chi Hospital. This research was conducted using observation, documentation, and direct measurements in the field to analyze within the limits of the IEEE 519-2014 standard. The purpose of this study was to analyze the main electrical system at Tzu Chi Hospital, analyze the value of Total Harmonic Distortion (THD) for voltage analysis. and currents at Tzu Chi Hospital. THDv based on the measurement results are transformer 1 4.8%, transformer 2 2.48%, transformer 3 1.51%, transformer 5 5%. While the THDi results obtained after measurement are transformer 1 20.2%, transformer 2 29 ,4%, transformer 3 14.78%, transformer 5 37.8%. Even after measurement, THDv was found to conform to the IEEE 519-2014 standard, and THD was found to be non-compliant with the IEEE 519-2014 standard. ABSTRAK Timbulnya harmonik disebabkan oleh operasi beban listrik non-linier. Tingkat distorsi harmonik atau yang disebut dengan Total Harmonic Distortion (THD) pada suatu trafo dapat menimbulkan rugi-rugi yang mempengaruhi efisiensi trafo. Pada penelitian ini dilakukan pengukuran THD pada empat trafo di Rumah Sakit Tzu Chi. Penelitian ini dilakukan dengan metode observasi, dokumentasi, dan pengukuran langsung di lapangan untuk menganalisis kesesuaian dengan batasan standar IEEE 519 2014. Tujuan dari penelitian ini adalah untuk menganalisis sistem kelistrikan utama di Rumah Sakit Tzu Chi, menganalisa perhitungan nilai Total Harmonic Distortion (THD) untuk tegangan dan arus di Rumah Sakit Tzu Chi. THDv berdasarkan hasil pengukuran yaitu transformator 1 4,8%, transformator 2 2,48%, transformator 3 1,51%, transformator 5 5%.sedangkan THDi hasil yang didapat setelah dilakukan pengukuran adalah transformator 1 20,2%, transformator 2 29,4%, transformator 3 14,78%, transformator 5 37,8%. Bahkan setelah pengukuran, THDv diketahui sesuai dengan standar IEEE 519 2014, dan THDi diketahui tidak sesuai dengan standar IEEE 519 2014.
ANALISIS INSTALASI FIRE ALARM PADA BASEMENT APARTEMENT SEBAGAI SISTEM PROTEKSI KEBAKARAN muhammad taufiq taufiq; Insani Abdi Bangsa
Aisyah Journal Of Informatics and Electrical Engineering (A.J.I.E.E) Vol. 5 No. 1 (2023): Aisyah Journal Of Informatics and Electrical Engineering
Publisher : Aisyah Journal Of Informatics and Electrical Engineering (A.J.I.E.E)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30604/jti.v5i1.125

Abstract

ABSTRACT As we know fire is a very harmful thing, especially for humans. There are many causes and effects of fires, ranging from loss of property to loss of life. During this time, the fire department would usually be called when a building caught fire. However, the firefighters are often late in arriving at the location when the fire occurs. There are several factors that are indeed a problem for firefighters such as the long distance to the location and so on. Therefore, we need a system that can minimize the spread of fire. Fire alarm system is an integrated system designed and built to detect fires, issue warnings or notifications, and run fire control systems automatically or manually. The main part that is the controller or controller of this system is the Main Control Fire Alarm (MCFA) or the Fire Alarm Control Panel (FACP) which functions as an input signal for all detectors or sensors, then provides an output signal through the output component. Keywords: Fire, Fire Alarm, MCFA, Protection ABSTRAK Seperti kita ketahui kebakaran merupakan hal yang sangat merugikan, khususnya bagi manusia. Ada banyak penyebab dan akibat dari kebakaran, mulai dari hilang harta benda hingga merenggut korban nyawa. Selama ini, pemadam kebakaran biasanya akan dipanggil ketika sebuah bangunan terjadi terbakar. Namun sering terjadinya keterlambatan para pemadam tersebut sampai dilokasi ketika kebakaran. Ada beberapa faktor yang memang menjadi masalah pemadam seperti jarak yang jauh ke lokasi dan lain halnya. Oleh karena itu, diperlukan suatu sistem yang dapat meminimalkan penyebaran api. Fire alarm system adalah sistem terintegrasi yang dirancang dan dibangun untuk mendeteksi kebakaran, mengeluarkan peringatan atau pemberitahuan, dan menjalankan sistem pengendalian kebakaran secara otomatis atau manual. Bagian utama yang menjadi pengendali atau pengkontrol sistem ini anatara lain Main Control Fire Alarm (MCFA) atau Fire Alarm Control Panel (FACP) yang berfungsi sebagai menerima sinyal masukan (input signal) semua detektor atau sensor, kemudian memberikan sinyal keluaran (output signal) melewati komponen keluaran. Kata Kunci: Kebaran, Fire Alarm, MCFA, Proteksi
ANALISIS KINERJA DAN SISTEM PEMELIHARAAN GENERATOR SET (GENSET) PADA APARTEMENT GREEN CENTRAL CITY Sumanto; Insani Abdi Bangsa
Aisyah Journal Of Informatics and Electrical Engineering (A.J.I.E.E) Vol. 5 No. 1 (2023): Aisyah Journal Of Informatics and Electrical Engineering
Publisher : Aisyah Journal Of Informatics and Electrical Engineering (A.J.I.E.E)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30604/jti.v5i1.127

Abstract

ABSTRACT The existence of a generator in the apartment is very very important. If the main electricity supply from PLN is off or under repair, the generator will work as a power supply for backup electricity. The size of the generator has an important role in generating electricity. The generator component consists of a power generator with a series of propulsion engines that work together to produce a certain amount of electricity using fuel. The place where this research was carried out was at the Green Central City Apartment. The generator used by the Green Central City Apartment is a generator with the MAN brand with type D2842 – LE213 as many as 3 units. The capacity of the generator used at Green Central City Apartments is 800 kVA and 700 kVA. The generator maintenance process at the Green Central City Apartment is carried out regularly. The process of checking the generator is carried out by checking several important components such as the condition of the battery, fuel supply, radiator water, and engine oil. In addition, the generator engine will be turned on as a step to heat the engine and also record data on the generator which can be seen on the control panel. Further maintenance is carried out based on the operating hours of the generator. For the treatment process, follow the procedure. Keywords: Generator; Apartement; Maintenance ABSTRAK Keberadaan Genset di Apartement sangat amat penting. Jika pasokan listrik utama dari PLN sedang mati atau dalam perbaikan makan Genset akan bekerja sebagai Power Supply untuk cadangan listrik. Ukuran genset memiliki peran penting dalam menghasilkan besaran listrik. Komponen Genset terdiri atas pembangkit tenaga dengan rangkaian mesin penggerak yang bekerja sama untuk menghasilkan listrik daya tertentu menggunakan bahan bakar. Tempat pelaksaan dari penelitian ini dilakukan pada Apartemen Green Central City.Genset yang digunakan oleh Apartemen Green Central City yaitu Genset Dengan Merek MAN dengan tipe D2842 – LE213 sebanyak 3 unit. Kapasitas genset yang digunakan pada Apartemen Green Central City adalah 800 kVA dan 700 kVA. Untuk proses pemeliharaan genset di Apartemen Green Central City ini dilakukan secara berkala. Proses pengecekan genset dilakukan dengan pengecekan beberapa komponen penting seperti kondisi baterai, persediaan bahan bakar, air radiator, serta oli mesin. Selain itu juga mesin genset akan dinyalakan sebagai langkah untuk memanaskan mesin dan juga mencatat data – data pada genset yang dapat dilihat pada panel kontol. Untuk perawatan selanjutnya dilakukan berdasarkan jam operasional dari genset. Untuk proses perawatannya mengikuti prosedur. Kata Kunci: Genset; Apartemen; Pemeliharaan
PEMANFAATAN PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) PADA GEDUNG UPHB PT PEMBANGKIT JAWA BALI UNIT MUARA KARANG Rizki Maulana Rizki; Insani Abdi Bangsa
Aisyah Journal Of Informatics and Electrical Engineering (A.J.I.E.E) Vol. 5 No. 1 (2023): Aisyah Journal Of Informatics and Electrical Engineering
Publisher : Aisyah Journal Of Informatics and Electrical Engineering (A.J.I.E.E)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30604/jti.v5i1.128

Abstract

Page 8 of 14 | Total Record : 132