cover
Contact Name
Putri Nur Dayana
Contact Email
putrinurd93@gmail.com
Phone
+62811327813
Journal Mail Official
jurnal.jifam@gmail.com
Editorial Address
Editor Journal of Infrastructure & Facility Asset Management Civil Engineering Dept., Building 2nd Floor, Room J-201 Sukalilo ITS Campus Surabaya 60111
Location
Kota surabaya,
Jawa timur
INDONESIA
Journal of Infrastructure and Facility Asset Management
ISSN : 2656890X     EISSN : 26568896     DOI : http://dx.doi.org/10.12962/jifam.v2i1.6965
Journal of Infrastructre & Facility Asset Management is aimed to develop Infrastructure & Facility Asset Management Sciences and Knowledge. This journal accepts paper contains the results of research or knowledge development in Infrastructure & Facility Asset Management from anywhere. This journal is published regularly 2 times a year, every March and September. If needed, this journal can also be published in June and December as Supplement Issue. Supplements are not of mandatory publishing. Supplements are only issued if deemed necessary.
Articles 7 Documents
Search results for , issue "Vol 7 (2025): Special Issue 3 : Journal of Infrastructure " : 7 Documents clear
Determination of Building Assets and Equipment Requirements Based on Sustainable Warehouse Cencepts for PT Kansai Prakarsa Coatings Purnama, Putri Dewi; Azizah, Halla Nur
Journal of Infrastructure & Facility Asset Management Vol 7 (2025): Special Issue 3 : Journal of Infrastructure & Facility Asset Management
Publisher : Lembaga Penelitian dan Pengabdian kepada Masyarakat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/jifam.v7i0.22486

Abstract

Warehouses play a crucial role in supporting the performance of companies in the logistics sector. PT Kansai Prakarsa Coatings (KPC) is a subsidiary of Kansai Paint Co., Ltd., a company in the paint industry sector. The distribution office and warehouse of the Bandung branch of PT Kansai Prakarsa Coatings (KPC) are located at Amir Machmud Street, Number 361, Cigugur Tengah Village, Cimahi Tengah, District, Cimahi City. The total area of the warehouse building is 408 m², with a total capacity of 80 tons. Several key issues have been identified, including poor ventilation and lighting in the closed warehouse, non-compliant loading conditions that do not meet applicable standards, and cases of overloading despite potential development. Since paint is a flammable product, it is necessary to have safe storage facilities. Additionally, paint has a strong odor and contains chemicals, making it essential to store it in a room with good ventilation and air circulation. Based on these main issues, it is important to conduct research to determine the need for building assets and warehouse equipment for PT Kansai Prakarsa Coatings, following the principles of a sustainable warehouse. The ; study is guided by SNI 7331:2007 and incorporates the concept of a sustainable warehouse. Descriptive methods with both qualitative and quantitative approaches were used in this study. Data collection techniques included interviews, observations, and documentation studies. The results of the study indicate that the total additional area required for the warehouse building is 372 m². This calculation is based on the estimated load of products stored both inside and outside the warehouse. Regarding warehouse equipment, based on the concept of a sustainable warehouse, PT Kansai's warehouse needs to procure ventilation systems, occupational health and safety equipment, lighting systems, as well as shelving and material handling equipment.
Analysis of Temporary Preloading for Bridge Approach Embankment to Eliminate Secondary Compression Case Study: Probolinggo – Banyuwangi Toll Road Construction Project Section 3 STA 40+550 Permadi, Muhammad Rizal; Mochtar, Indrasurya B.; Mochtar, Noor Endah; Kazhimi, Reza
Journal of Infrastructure & Facility Asset Management Vol 7 (2025): Special Issue 3 : Journal of Infrastructure & Facility Asset Management
Publisher : Lembaga Penelitian dan Pengabdian kepada Masyarakat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/jifam.v7i0.22482

Abstract

Probolinggo - Banyuwangi Toll Road is part of the National Strategic Project, has a length of 172 km which is divided into 7 sections. One of the challenges faced is soft soil, where information is obtained in section 3 precisely STA 40 + 550 there is soft soil, which has low bearing capacity and high compressibility. The depth of the soft soil itself reaches 10 meters, with the plan to build in the approach bridge area which has a 10 meter high embankment. Considering the high embankment, based on previous studies, it is estimated that the amount of primary and secondary compression generated is quite large. This study analyzes primary, and secondary compression in bridge approach embankments built on soft soil, focusing on eliminating secondary compression using the preloading method, while the primary compression time is accelerated using Prefabricated Vertical Drains (PVD). Primary consolidation results in a 1.35-meter settlement, and secondary settlements vary over 20 years. From the analysis, it is found that the annual rate of secondary settlements decreases after year 10, so it is considered that the year 10 settlements are eliminated. To eliminate these settlements at year 10 of the operational period, the required embankment height increases by up to 13.60 meters of granular backfill, preloading of 4.49 t/m2 is equivalent to 2.26 m, and the height of the embankment to be demolished is 1.85 m.
The Effect of Prefabricated Vertical Drain Length on Soft Soil Settlement (Case Study: The North Ring Road of Lamongan STA. 3+200) Okadha, Henniko; Wahyudi, Herman; Lastiasih, Yudhi; Udukha, Sifa’
Journal of Infrastructure & Facility Asset Management Vol 7 (2025): Special Issue 3 : Journal of Infrastructure & Facility Asset Management
Publisher : Lembaga Penelitian dan Pengabdian kepada Masyarakat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/jifam.v7i0.22483

Abstract

The North Ring Road of Lamongan Project Section I, which stretches from Sta. 0+000 to Sta. 3+265, is indicated to be built on soft silt soil. This paper discusses the effect of Prefabricated Vertical Drains (PVDs) length on the amount of settlement that occurs in soft soil. The method used was to compare the installation of PVDs at a quarter, half and three quarters of the thickness of the compressible soil layer. The varying lengths of PVDs were modeled on PLAXIS2D software. The results show that the longer PVDs are installed in the compressible soil, the greater settlement occurs.
Reviewer Management, Journal of Infrastructure & Facility Asset
Journal of Infrastructure & Facility Asset Management Vol 7 (2025): Special Issue 3 : Journal of Infrastructure & Facility Asset Management
Publisher : Lembaga Penelitian dan Pengabdian kepada Masyarakat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/jifam.v7i0.22488

Abstract

Paper Writting StipulationPapers on JIFAM - The Journal of Infrastructure & Facility Asset Management Journal is regulated by general stipulation as follows.-          Papers must be a real work of the author.-          Papers has never been published in other media.-          Papers must contain discussion about Infrastructure & Facility Asset Management.-          Papers must contains a new discussion, judging based on the discussion that has been published in previous JIFAM.-          The paper has to take references from Scientific Journal with minimum of 5 papers.-          Paper lengths are limited in 8-16 pages.-          Paper Template can be downloaded on the website http://https://iptek.its.ac.id/index.php/jifamScope of TopicJIFAM accepts papers on Infrastructure & Facility Asset Management. The scope of the topic includes, but not limited to,-          I & F Function-          I & F Demand - Supply-          I & F User Behavior-          I & F Policy-          I & F Planning-          I & F Administration Aspects-          I & F Operation System-          I & F Maintenance System-          I & F Evaluation Technique-          I & F Disposal-          I & F Economical Aspect-          I & F Financial Aspect-          I & F Management Organization-          I & F Spatial Aspects and Environmental AspectsReviewerDr. Ir. Hitapriya Suprayitno MEng., Departemen Teknik Sipil, Institut Teknologi Sepuluh Nopember, Surabaya, Indonesia.Prof. Dr. Ir. Ria Asih A. S. M.Eng, Institut Teknologi Sepuluh Nopember (ITS), SurabayaDr. Trihanyndio R. S. ST., MT., Institut Teknologi Sepuluh Nopember (ITS), Surabaya, IndonesiaDr. Mahendra A. M. ST., MT., Institut Teknologi Sepuluh Nopember (ITS), Surabaya, IndonesiaData Iranata ST., MT., Ph.D., Departemen Teknik Sipil, Institut Teknologi Sepuluh Nopember, Surabaya, Indonesia.Dr. Ir. Alex Abdi Chalix MM., MT., Kementerian Pekerjaan Umum dan Perumahan Rakyat (PUPR), JakartaProf. Dr.Tech.Ir. Danang Parikesit MSc., University Network For Indonesia Infrastructure Development, Indonesia.Prof.madya Dr. Maimunah Bt Sapri., Real Estate Department, Universiti Teknologi Malaysia, Johor Bahru, Malaysia.Wahyu Caesarendra, ST., M. Eng., Ph.D., Departement Integrated Technology, University Brunei Darussalam, Brunei Darussalam.Dr. Ir. Achmad Wicaksono MEng., Teknik Sipil, Universitas Brawijaya, Malang, Indonesia.
Analysis of Excavated Soil Utilization as Embankment Material and Foundation Layer on Singaraja – Mengwitani Road Section (BALI) Hadi, Dinul; Soemitro, Ria Asih Aryani; Satrya, Trihanyndio Rendy; Fachrie, Noor
Journal of Infrastructure & Facility Asset Management Vol 7 (2025): Special Issue 3 : Journal of Infrastructure & Facility Asset Management
Publisher : Lembaga Penelitian dan Pengabdian kepada Masyarakat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/jifam.v7i0.22484

Abstract

Road and bridge construction of the Bts. Singaraja City - Mengwitani is located in a tightly contoured hilly area, resulting in a very large volume of excavation and embankment work. Referring to the data from the field inspection of the construction work package, the soil layer in the excavation work has the potential to be used as fill material and foundation layer. This can be a solution to reduce the use of natural materials by utilizing waste materials.This research aims to analyze the utilization of excavated soil on the National Road Bts. Singaraja City - Mengwitani. The research was conducted by identifying the physical and mechanical parameters of the excavated soil at the location of the disposal area, then examining the requirements of the general specifications of bina marga for road and bridge construction in 2018 revision 2, if it does not meet the stabilization using lime to improve the soil parameters to achieve optimal conditions. If the test specimen meets the requirements as backfill soil, then modeling will continue using the Plaxis 2D auxiliary program to calculate the maximum height of safe backfill soil.Based on the results, the excavated soil was classified as silty sand (SM) with plasticity index varying from 5.84% to 12.63%, and CBR values varying from 6.60% to 10.12%. For the material requirements check, all excavated soils meet the requirements as ordinary backfill material, some rest area disposal sites meet the requirements as preferred backfill material, swamp backfill, and graded material backfill, and all excavated soils do not meet the requirements of foundation layer. From the modeling results of the excavated soil parameters obtained, the safe embankment height can reach 3-5 meters.
Closure Management, Journal of Infrastructure & Facility Asset
Journal of Infrastructure & Facility Asset Management Vol 7 (2025): Special Issue 3 : Journal of Infrastructure & Facility Asset Management
Publisher : Lembaga Penelitian dan Pengabdian kepada Masyarakat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/jifam.v7i0.22489

Abstract

Journal of Infrastructure & Facility Asset ManagementVolume 7, Special Issue 3, January 2025                                 (e) ISSN 2656-8896  (P) ISSN 2656-890X Volume 7, Special  Issue 2, January 2025Handling Selection of Compression And Stability Problems of Embankment Based on The Thickness of Soft Soil Layer Below (Case Study: Rengat – Pekanbaru Toll Road Project Sta. 176+775 – Sta. 176+975) Pandu Hermawan, Noor Endah Mochtar, Indrasurya B. Mochtar, & Mahar Muliawan Slope Stability Analysis Under Dry-Wetting Cycle Conditions (Case Study: Landslide Countermeasure of Batas Pidie/Aceh Besar - Batas Kota Sigli) Zulfadhli, Trihanyndio Rendy Satrya, Ria Asih Aryani Soemitro & Fikri Afzal Alternative Planning Slope Stabilization On Roadway Case Study : Landslide On Tabone-Polewali Road Section KM 168+790 to 168+820 Ismi Istiqamah, Mohamad Khoiri, Mahendra Andiek Maulana & Bambang S. RazakStudy of The Behavior of Abutment Piled Foundation due to Nearby Staged-Embankment (Case Study: Kali Kandang Bridge on The North Ring Road of Lamongan) Azkiya Nabila, Trihanyndyo Rendy Satrya, Ria Asih Aryani Soemitro, Sifa Udukha Behaviour Study of Abutment Pile Foundation on Lightweight Embankment Oprit Nila Wahyu Pertiwi, Ria Asih Aryani Soemitro, Trihanyndio Rendy Satrya, Sifa' UdukhaVolume 7, Special  Issue 1, January 2025Parametric Study of Embankment Stability And Geotextile Reinforcement On Soft Soil Mirza Syah Alam, Herman Wahyudi, Yudhi Lastiasih, Yusrizal Kurniawan Analysis Of Slope Stability Based On The Effect Of RainFall On The Lombok International Airport (Bil) – Mandalika Road STA 10+375 to STA 10+550 Made Sudiadnya, Mohamad Khoiri, Dwa Desa Warnana, Herlambang Zulfikar Analysis of The Effect of Seismic Load on The Design Safety Factor of Foam Mortar with Bored Pile Landslide Location of Batas Pidie/Aceh Besar – Bts. Kota Sigli STA 0+560 Ichvan Danny Kurniawan, Trihanyndio Rendy Satrya, Ria Asih Aryani Soemitro, Fikri Afzal A Study of Pile Displacement in Soft Soil: The Case of Semarang - Demak Toll Road Construction Package 1B Novera Sagita, Herman Wahyudi, Yudhi Lastiasih &Yusrizal Kurniawan Design Of Toll Road Embankment With Secondary Compression Mitigation After PVD Installation And Solutions For The Probolinggo – Banyuwangi Toll Road Construction Project PackKAGE 2 STA 16+300 – STA 16+700 Septya Kukuh Aryandi, Indrasurya B. Mochtar, Noor Endah, Abdjad Agung Artanto 
Analysis of PVD Installation Methods Due to Limited Vertical Clearance in the Lamongan North Ring Road Construction Project Section 1 STA 0+400 to STA 0+426 Barimbing, Fanny Rumintha Br; Lastiasih, Yudhi; Wahyudi, Herman; Udukha, Sifa`
Journal of Infrastructure & Facility Asset Management Vol 7 (2025): Special Issue 3 : Journal of Infrastructure & Facility Asset Management
Publisher : Lembaga Penelitian dan Pengabdian kepada Masyarakat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/jifam.v7i0.22485

Abstract

The construction of the Lamongan North Ring Road is planned to be built on soft soil. Based on the results of the soil investigation, it is known that the subgrade condition is classified as soft to very soft soil with a depth of 18 meters. One of the problems of this very soft soil is the settlement. Therefore, the National Road Implementation Agency of East Java - Bali Region conducted subgrade improvement using preloading combined with Prefabricated Vertical Drain (PVD). The configuration of the PVD installation is 18 meters deep with a triangular pattern and the distance between PVDs is 1 meter. To stake the PVDs 18 meters deep, a piling rig with a minimum height of 24 meters is required. In the STA 0+400 to STA 0+426 section there is a 150 kV Lamongan - Paciran High Voltage Air Line (SUTT) cable crossing the road with a conductor to platform distance of 18 meters. The existence of this cable is a challenge in the PVD driving as deep as 18 meters. Therefore, this journal will analyze the PVD piling implementation method that can be carried out in this segment. The method carried out in this study is to start with the collection of secondary data such as shop drawings as a reference for the implementation of work in accordance with the planned design. Based on the design plan, an implementation method that can be applied to limited vertical clearance conditions is obtained. Based on the results of the research, an 18-meter deep PVD installation method was obtained that can be applied to limited vertical clearance conditions in the Lamongan North Ring Road construction project Section 1 STA 0+400 to STA 0+426. In addition, it was also found that the time required was 34.75 minutes to stake 1 PVD point using the pulled hole PVD method.

Page 1 of 1 | Total Record : 7


Filter by Year

2025 2025


Filter By Issues
All Issue Vol 7 (2025): Special Issue 3 : Journal of Infrastructure & Facility Asset Management Vol 7 (2025): Special Issue 2 : Journal of Infrastructure & Facility Asset Management Vol 7 (2025): Special Issue 1 : Journal of Infrastructure & Facility Asset Management Vol 7, No 1 (2025): Journal of Infrastructure & Facility Asset Management Vol 6 (2024): Special Issue 3 : Journal of Infrastructure & Facility Asset Management Vol 6 (2024): Special Issue 2 : Journal of Infrastructure & Facility Asset Management Vol 6 (2024): Special Issue 1 : Journal of Infrastructure & Facility Asset Management Vol 6, No 1 (2024): Journal of Infrastructure & Facility Asset Management Vol 5 (2023): Special Issue 1 : Journal of Infrastructure & Facility Asset Management Vol 5, No 1 (2023): Journal of Infrastructure & Facility Asset Management Vol 4, No 2 (2022): Journal of Infrastructure & Facility Asset Management Vol 4, No 1 (2022): Journal of Infrastructure & Facility Asset Management Vol 3, No 3 (2021): Journal of Infrastructure & Facility Asset Management Vol 3, No 2 (2021): Journal of Infrastructure & Facility Asset Management Vol 3, No 1 (2021): Journal of Infrastructure & Facility Asset Management Vol 2, No 2 (2020): Journal of Infrastructure & Facility Asset Management Vol 2 (2020): Supplement 1 : Journal of Infrastructure & Facility Asset Management Vol 2, No 1 (2020): Journal of Infrastructure & Facility Asset Management Vol 1, No 2 (2019): Journal of Infrastructure & Facility Asset Management Vol 1, No 1 (2019): Journal of Infrastructure & Facility Asset Management More Issue