cover
Contact Name
Sugeng Santoso
Contact Email
sugeng.santoso@mercubuana.ac.id
Phone
+6282132044774
Journal Mail Official
ti.jurnal@umm.ac.id
Editorial Address
Departement Industrial Engineering University of Muhammadiyah Malang Jl. Tlogomas No 246 Malang
Location
Kota malang,
Jawa timur
INDONESIA
Jurnal Teknik Industri
ISSN : 19781431     EISSN : 25274112     DOI : -
Dr. Saiful Anwar Malang is a state hospital has done it is job and function, but in 3rd class of pavilion room, the number of patient decrease dramatically. It is concerned with quality of this hospital. To answer this problem, research was done using Quality Function Deployment (QFD). Quality Function Deployment is a tool which design some needs include customers represented as a voice of customer and including some competitions and also groups some activities that usually called affinity graphic ang getting a benchmarking for it is competition. From the result analysis can be showed that main attribute for patience is a accuracy. And from House Of Quality can be found that getting a periodic meeting to evaluate this hospital and also increase a service can be made 20 concept
Articles 9 Documents
Search results for , issue "Vol. 2 No. 1 (2001)" : 9 Documents clear
Uji Pemanfaatan Teknologi Elektroplating Pada Produk Pandai Besi Sebagai Upaya Peningkatan Kualitas dan Daya Saing Ahmad Mubin
Jurnal Teknik Industri Vol. 2 No. 1 (2001)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol2.No1.1-9

Abstract

The research of application of electroplating technology testing at pandai Besi product as means to increase of quality and competitiveness had done, this research aimed to make reparation of production process and to applied electroplating technology in finishing process, until can adding to decorative properties and resistence of corrosion at product and to determine cost addition because that treatment.
Penerapan Distribution Requirement Planning (DRP) pada Central Warehouse PT. Coca Cola Amatil Bottle Pandaan Annisa Kesy Garside
Jurnal Teknik Industri Vol. 2 No. 1 (2001)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol2.No1.47-58

Abstract

This research has a good to plan the product delivery schedule from central ware house to each ware house and from ware house to PT. Coca Cola outlet to minimize the holding number of product. To plan this schedule we implement DRP (Distribution Requirement Planning) method. With using the product demand data, lead time of delivery, holding cost and release cost, also BOD (Bill of Distribution). Then analysis them using DRP software to find the shipping schedule. After implementing DRP method PT. Coca Cola can decrease about RP 7.205.761.500,00 for 8 week.
Perencanaan Kebutuhan Bahan Baku Keramik BHL244S dan HM-2 dengan Metode Material Requirement Planning Ayudina Puji Estrimaz; Rudy Hendrawanto
Jurnal Teknik Industri Vol. 2 No. 1 (2001)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol2.No1.27-35

Abstract

PT. Kuda Laut Mass is a private company which produce floor tile. The problem that usually happen in this company is how to make planning in material requirement especially count the quantity of material and component and also release that will ber educe the production cost.
Penjadwalan Produksi dengan Metode Johnson dan Heuristic untuk Meminimasi Makespan, Total Flow Time, serta Idle Time Dyah Retno Purwatiningsih; Hima Khusnita
Jurnal Teknik Industri Vol. 2 No. 1 (2001)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol2.No1.19-26

Abstract

Product scheduling system that used by PT Berjaya Sekawanindo for this time, only concidering one purpose criteria for product scheduling is how to finishing all of demand fastest. With only concidering one urpose criteria, cause there are another criterias which neglectfully.
Penentuan Interval Perawatan Mesin Produksi Untuk Meningkatkan Availability Melalui Analisis Keandalan Eti Kristinawati
Jurnal Teknik Industri Vol. 2 No. 1 (2001)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol2.No1.36-46

Abstract

Productivity in a production system is ar important problem and having many factors influence it such as machine condition. With getting machine order, the realibility value is also going to decrease so that machine component will get trouble that will decrease the machine productivity indirectly.
Aplikasi Metode Value Engineering dalam Penentuan Alternatif Fasilitas Rumah di Perumahan Ilyas Mas'udin
Jurnal Teknik Industri Vol. 2 No. 1 (2001)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol2.No1.65-74

Abstract

Every Real Estate Developer want the houser built wanted by customers. There is a dicrease in sale of houses that be saled by Tegalgondo Asri developer caused customer's unsatisfaction in fasilities or import of sevise value given by developer to customers who lived there. One of alternative to rise design value vasilities is making a new fasility design better than the old one.
Penjadualan Produksi n job m mesin Untuk Sistem Produksi Job Shop di Perusahaan dan Industri Mesin Aneka Mesin Malang Moh. Hartono
Jurnal Teknik Industri Vol. 2 No. 1 (2001)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol2.No1.10-18

Abstract

This reseach has to find a production schedule with making a job schedule that have to be done on its machine to minimated makespan and total tardines. In this reseach used branch and brand method because of the reseach location involve the job shop scedulling the use data to find the scedulling is the job proses routing on each machine and its proses time. Than using Computer to acaunt proses casier in its interation/ makespan and total for devises.
Model Logit (Logistic Regression) Sebagai Model Probabilitas Linier Alternatif, Dalam Contoh Aplikasi Teknik Industri Sugeng Santoso
Jurnal Teknik Industri Vol. 2 No. 1 (2001)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol2.No1.59-64

Abstract

Regression model in which the regressand evokes a yes or no or present or absent response are known as dichotomous, or dummy, dependent variable regression models. They are applicable in a wide variety of fields and are used extensively in survey or census-type data. Among the methods that are used to estimated such models, this paper considered three-LPM, logit and probit.
Penjadwalan Produksi Campur Merata Untuk Memenuhi Permintaan Konsumen Melalui Sistem Produksi Just In Time Wahyu Enie Maryati
Jurnal Teknik Industri Vol. 2 No. 1 (2001)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol2.No1.75-85

Abstract

Thep rogres of challanging and there are more kind of customers need, make a company can't sell single fixed product in function, model, and measurement. The reacted ability to respon market is the most important thing of PT. Wavin Duta Jaya as one of company which produce PVC pipe that have many kinds and size to reach maximum profit.

Page 1 of 1 | Total Record : 9


Filter by Year

2001 2001


Filter By Issues
All Issue Vol. 25 No. 2 (2024): August Vol. 25 No. 1 (2024): February Vol. 24 No. 2 (2023): August Vol. 24 No. 1 (2023): February Vol. 23 No. 2 (2022): August Vol. 23 No. 1 (2022): February Vol. 22 No. 2 (2021): August Vol. 22 No. 1 (2021): February Vol. 21 No. 2 (2020): August Vol. 21 No. 1 (2020): February Vol 21, No 1 (2020): February Vol 20, No 2 (2019): August Vol. 20 No. 2 (2019): August Vol. 20 No. 1 (2019): February Vol 20, No 1 (2019): February Vol. 19 No. 2 (2018): Agustus Vol 19, No 2 (2018): Agustus Vol. 19 No. 1 (2018): Februari Vol 19, No 1 (2018): Februari Vol 18, No 2 (2017): Agustus Vol. 18 No. 2 (2017): Agustus Vol. 18 No. 1 (2017): Februari Vol 18, No 1 (2017): Februari Vol. 17 No. 2 (2016): Agustus Vol 17, No 2 (2016): Agustus Vol. 17 No. 1 (2016): Februari Vol 17, No 1 (2016): Februari Vol 16, No 2 (2015): Agustus Vol. 16 No. 2 (2015): Agustus Vol. 16 No. 1 (2015): Februari Vol 16, No 1 (2015): Februari Vol 15, No 2 (2014): Agustus Vol. 15 No. 2 (2014): Agustus Vol 15, No 1 (2014): Februari Vol. 15 No. 1 (2014): Februari Vol. 14 No. 2 (2013): Agustus Vol 14, No 2 (2013): Agustus Vol. 13 No. 2 (2012): Agustus Vol 13, No 2 (2012): Agustus Vol 13, No 1 (2012): Februari Vol. 13 No. 1 (2012): Februari Vol 12, No 2 (2011): Agustus Vol. 12 No. 2 (2011): Agustus Vol. 12 No. 1 (2011): Februari Vol 12, No 1 (2011): Februari Vol 11, No 2 (2010): Agustus Vol. 11 No. 2 (2010): Agustus Vol 11, No 1 (2010): Februari Vol. 11 No. 1 (2010): Februari Vol 10, No 2 (2009): Agustus Vol. 10 No. 2 (2009): Agustus Vol 10, No 1 (2009): Februari Vol. 10 No. 1 (2009): Februari Vol. 9 No. 2 (2008): Agustus Vol 9, No 2 (2008): Agustus Vol 9, No 1 (2008): Februari Vol. 9 No. 1 (2008): Februari Vol. 8 No. 2 (2007): Agustus Vol 8, No 2 (2007): Agustus Vol. 8 No. 1 (2007): Februari Vol 8, No 1 (2007): Februari Vol 4, No 2 (2003) Vol. 4 No. 2 (2003) Vol 3, No 2 (2002) Vol. 3 No. 2 (2002) Vol 3, No 1 (2002) Vol. 3 No. 1 (2002) Vol 2, No 2 (2001) Vol. 2 No. 2 (2001) Vol 2, No 1 (2001) Vol. 2 No. 1 (2001) Vol 1, No 2 (2000) Vol. 1 No. 2 (2000) Vol 1, No 1 (2000) Vol. 1 No. 1 (2000) More Issue