Pengaruh Kondisi Lapangan terhadap Perancangan Menara Komunikasi Tipe Standar SST E-60 Sumargo Syamsul Basri; Irwan I
Forum Teknik Vol 30, No 3 (2006)
Publisher : Faculty of Engineering, Universitas Gadjah Mada

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

In the recent years, the communication sector has made a progressive development. The development is not only in the cornmunication technology, but also its supporting equipment. Communication tower is among the supporting equipments as a transmitter which is designed using steel material.At the design stage, companies that design communication tower, have one or few models that hqs been used. Among the communication towers that have been used is communication tower of SST(Self Supporting Tower) E-60 type with 60 m height. The preliminary model is designed with certain field conditions, and came into a question, what will occur if communication tower be built in different field conditions?In this Steady, analysis is conducted to SST E-60, if it can be built in all earthquake zone inIndonesia, can be put in oblique land or with different elevation, how big differential settlement is allowed to happen cmd how many extra antennas can be put on the tower structure. The result shows that commtmication tower of SST E-60 type can be used in all earthquake zone inIndonesia, can be built vith dffirent elevation, has a dffirential ,seltlement ntaxintwn of 2.5 cm, and can he put extra antenna as much as 26 antennas. Keywords: Communicalion tower, SST E-60, self  supporting tower, wilayah gempa (earth zone), tanah miring (oblique land), differential settlement, antena. 
Pengaruh Potongan Harga pada Sistem Inventori (Q,R) yang Mempertimbangkan Ketergantungan antara Lot Size dan Lead Time Nur Indrianti; Setya Prajoko; Trismi Ristyowati
Forum Teknik Vol 30, No 3 (2006)
Publisher : Faculty of Engineering, Universitas Gadjah Mada

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This paper is concerned with lot size dependent lead times in a (Q,R) inventory system considering-quantity discounts offered by suppliers. With regards to the existing model that considers the impact of lot size on lead time and safety stock equirements, we present an efficient iterative algorithm to decide lot size that minimizes total inventory cost. The algorithm simultaneously determines lot size and safety stock based on the tradeoff between inventory holding cost and shortage cost. A nurnerical example is provided to clarify the iteration procedure. In addition, we identify the effict of shop floor queing factor on lot size decision.The result of the study shows that purchasing larger lot size does not always result in minimum total inventory cost. Larger lot size reduces per unit ordering cost and shortage cost, but increases the holding cost due to more inventories. Moreover, we conclude that increased shop floor queuing factor leads to increased production lead time, resulting in larger lot size.Keywords: (Q,R) inventory system, lot size dependent lead times, quantity discount.