cover
Contact Name
Syukri
Contact Email
syukri@unida-aceh.ac.id
Phone
-
Journal Mail Official
ajeetech@unida-aceh.ac.id
Editorial Address
Jl. Kampus Unida No.15, Surien, Kec. Meuraxa, Kota Banda Aceh 23234
Location
Kota banda aceh,
Aceh
INDONESIA
Aceh Journal of Electrical Engineering and Technology
ISSN : -     EISSN : 28279700     DOI : -
Core Subject : Engineering,
AJEETECH: Aceh Journal of Electrical Engineering and Technology menerima artikel ilmiah dalam lingkup penelitian; Electrical Engineering; Power; Electronics; Instrumentation and Control; Telecommunication and Multimedia; Computer and Informatics Engineering; Signal/Image Processing; Electrical Engineering Vocational Education; etc.
Articles 5 Documents
Search results for , issue "Vol. 3 No. 1 (2023): Juni" : 5 Documents clear
Analisis Pengaruh Radiasi Matahari Dan Temperatur Terhadap Daya Keluaran Fotovoltaik Menggunakan SPSS Bayu Rangga Julian; Muliadi; Syukri
Aceh Journal of Electrical Engineering and Technology Vol. 3 No. 1 (2023): Juni
Publisher : Jurusan Teknik Elektro Fakultas Teknik Universitas Iskandarmuda Jl. Kampus Unida No.15, Surien, Kec. Meuraxa, Kota Banda Aceh, Aceh 23234 Propinsi Aceh, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55616/ajeetech.v3i1.531

Abstract

Komponen utama Pembangkit Listrik Tenaga Surya (PLTS) adalah panel fotovoltaik (PV), teknologi yang mengubah energi dari sinar matahari menjadi listrik. Energi yang dihasilkan oleh Panel fotovoltaik dipengaruhi oleh berbagai faktor, diantaranya adalah jumlah radiasi matahari dan temperatur. Tujuan dari penelitian ini adalah mengetahui pengaruh radiasi matahari dan temperatur terhadap daya yang dihasilkan oleh panel fotovoltaik Penelitian ini dilakukan pengukuran radiasi cahaya matahari, temperatur area, temperatur panel photovoltaic, tegangan dan arus. untuk mengetahui hubungan sebab akibat dari besarnya radiasi matahari dan temperatur terhadap daya yang dihasilkan oleh panel fotovoltaik menggunakan metode regresi linear dengan bantuan software SPSS. Hasilnya didapatkan nilai radiasi berkorelasi positif terhadap daya output panel fotovoltaik  setiap kenaikan 1 (satu) nilai radiasi akan meningkatkan daya output sebesar 0,310 Watt, nilai temperatur panel fotovoltaik berkorelasi positif terhadap daya output panel fotovoltaik setiap kenaikan 1 (satu) nilai temperatur panel fotovoltaik akan meningkatkan daya output sebesar 0,974 Watt, dan nilai temperatur area berkorelasi negatif terhadap daya output panel fotovoltaik setiap kenaikan 1 (satu) nilai temperatur area daya output akan berkurang sebesar -4,762 Watt
Analisis Pemasangan Arrester Pada Gardu Distribusi Penyulang Johan Pahlawan ULP Meulaboh Kota Teuku Mahmuda Rahmat Rezki; Muliadi; Syukri
Aceh Journal of Electrical Engineering and Technology Vol. 3 No. 1 (2023): Juni
Publisher : Jurusan Teknik Elektro Fakultas Teknik Universitas Iskandarmuda Jl. Kampus Unida No.15, Surien, Kec. Meuraxa, Kota Banda Aceh, Aceh 23234 Propinsi Aceh, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55616/ajeetech.v3i1.532

Abstract

Pada sistem pembangkit tenaga listrik PT. PLN (Persero) Area Meulaboh memiliki elemen penting dalam menyuplai tenaga listrik, yaitu sistem jaringan distribusi. Komponen yang paling rentan terkena gangguan petir pada jaringan distribusi adalah trafo, maka diperlukan penangkal petir, yaitu arrester. Arrester pada trafo distribusi PT. PLN (Persero) ULP Meulaboh Kota berfungsi untuk menangkap dan mengamankan trafo dari gangguan surja petir dan memberikan proteksi pada trafo dari tegangan lebih. Permasalahan yang diangkat pada penelitian ini adalah berapa jarak pemasangan arrester dengan peralatan yang terdapat pada gardu distribusi penyulang Johan Pahlawan ULP Meulaboh, dan bagamaina karakteristik kerja arrester dalam memproteksi trafo pada gardu distribusi penyulang Johan Pahlawan ULP Meulaboh Kota. Yang menjadi tujuan utama dari penelitian ini adalah, untuk mendapatkan jarak pemasangan arrester dengan peralatan yang terdapat pada gardu distribusi penyulang Johan Pahlawan ULP Meulaboh Kota, dan untuk mengetahui karakteristik kerja arrester dalam memproteksi trafo pada gardu distribusi penyulang Johan Pahlawan ULP Meulaboh. Metode yang digunakan yaitu dengan melakukan observasi lansung kelapangan dan pengumpulan data, serta melakukan perhitungan dengan formula sistematis. Hasilnya jarak maksimum arrester terhadap transformator sesuai dengan karakteristik kerja arrester 0,66 meter dengan jarak perlindungan dari peralatan yang dilindungi adalah 4,86 meter, 12,36 meter, 21,36 meter, 27,36 meter, 34,86 meter. Jarak penempatan arrester terhadap trafo 0,99 meter. Dengan jarak perlindungan dari peralatan yang dilindungi adalah 3,54 meter, 11,04 meter, 20,04 meter, 2,595 meter, 33,54 meter, sehingga penempatan dan penyambungan arrester masih dalam kondisi yang baik. Faktor perlindungan arrester sampai dipengaruhi oleh besar kesilnya tegangan kerja trafo dimana faktor perlndungan arrester terhadap trafo yang baik minimal 20% dari TID.
Perencanaan Pembangkit Listrik Tenaga Surya Di Pedesaan Kabupaten Simeulue Aditya Chandra; Martunis
Aceh Journal of Electrical Engineering and Technology Vol. 3 No. 1 (2023): Juni
Publisher : Jurusan Teknik Elektro Fakultas Teknik Universitas Iskandarmuda Jl. Kampus Unida No.15, Surien, Kec. Meuraxa, Kota Banda Aceh, Aceh 23234 Propinsi Aceh, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55616/ajeetech.v3i1.534

Abstract

Indonesia's current electrification ratio is 87%, this shows that 8.5 million Indonesians or the equivalent of 2500 villages do not have electricity. Indonesia's geographical location is one reason why there are still many areas that have not been reached by the State Electricity Company (PLN), such as Siumat Island. Siumat Island is an area located on Simeulue Island, Simeulue Regency, East Simeulue District, is one of the areas where people have never experienced the use of electrical energy like other areas in big cities on the island of Sumatra. The electricity network in this area has not yet been entered because the reach of the PLN network to enter remote areas such as Pulau Siumat Village is complicated. After all, getting to Siumat Island from Simeulue Island takes approximately 3 hours by sea. The purpose of this study is to analyze from an economic perspective the construction of a solar power plant for the area. From the results of the discussion using the Calculation method, the Planning, Design and Needs Analysis approach, it was found that planning a solar power plant in Pulau Siumat Village was necessary. As a result, with a total of 62 housing units, 3 public facilities and public lighting, the total power required is 38.675 kW. To meet this need, 320 units of solar panels are needed, 372 units of batteries with a capacity of 12 V 250 Ah, 16 units of charge controllers with a total of 300 Ampere and 3 units of inverters with a capacity of 15 kW with the power to be generated is 40kW or 50 kVA. For the needs mentioned above, a budget of IDR 3,946,184,500 is needed.
Studi Aliran Daya Pada Penyulang GH-06 PT. PLN (Persero) Rayon Lancang Garam Lhokseumawe
Aceh Journal of Electrical Engineering and Technology Vol. 3 No. 1 (2023): Juni
Publisher : Jurusan Teknik Elektro Fakultas Teknik Universitas Iskandarmuda Jl. Kampus Unida No.15, Surien, Kec. Meuraxa, Kota Banda Aceh, Aceh 23234 Propinsi Aceh, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55616/ajeetech.v3i1.536

Abstract

Dalam mensimulasikan Aliran Daya dengan menggunakan Elecrical Transient Analyzer Program (ETAP) adalah suatu perangkat lunak analiysis comprehensive untuk mendesain dan memanipulasi suatu sistem rangkaian tenaga. ETAP mengintegrasikan data-data rangkaian tenaga seperti kapasitas pembangkit, panjang jaringan per km, kapasitas busbar, rating trafo, impendansi urutan nol, positif dan negatif suatu perlatan listrik seperti trafo, generator dan penghantar. Hasil simulasi dari sofware Etap 12.6.0 tersebut digunakan untuk menganalisis aliran daya pada jaringan distribusi 20 kV pada PT. PLN (Persero) Rayon Lancang Garam Lhokseumawe serta besaran drop tegangan dan losses. Proses simulasi ini menggunakan metode aliran daya Fast-Decoupled, proses perhitungan tersebut menggunakan nilai maksimum iterasi dengan 99. Untuk jaringan 20 kV pada PT. PLN (Persero) Rayon Lancang garam diperoleh daya aktif (P) sebesar 484,80 kW, daya reaktif (Q) sebesar 363,88 kVAR, dan daya semu (S) sebesar 606,10 kVA. Total nilai drop tegangan keseluruhan sebesar 0,12 %, diperoleh juga nilai Losses dengan keseluruhan yaitu sebesar 0,3 kW untuk daya aktif (P) dan 1.0 kvar untuk daya reaktif (Q). Dalam simulasi ini terdapat total sebanyak 25 Bus yang digunakan, Daya yang didapatkan dari hasil simulasi menggunakan software ETAP yang masuk ke dalam jaringan sistem distribusi Pada Penyulang PT. PLN Rayon Lancang Garam Lhokseumawe yaitu daya kirim 484,80kW, 363,88 kVAR dan 606,10 kVA. Total beban permintaan di sistem hasil simulasi ETAP yaitu 484,80 kW 363,88 kVAR dan 606,10 kVA. Total rugi-rugi daya beban pada sistem hasil simulasi 0,03 kW dan 0,04 kVAR.
Analisis Efisiensi Transformator Daya di PT. PLN (Persero) Gardu Induk Ulee Kareng
Aceh Journal of Electrical Engineering and Technology Vol. 3 No. 1 (2023): Juni
Publisher : Jurusan Teknik Elektro Fakultas Teknik Universitas Iskandarmuda Jl. Kampus Unida No.15, Surien, Kec. Meuraxa, Kota Banda Aceh, Aceh 23234 Propinsi Aceh, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55616/ajeetech.v3i1.538

Abstract

Untuk mengkonversikan energi listrik diperlukan peralatan listrik pendukung, diantara nya adalah transformator. Transformator adalah komponen yang sangat penting dalam sistem ketenagalistrikan. Keberadaan transformator merupakan penemuan besar yang sangat penting dalam kemajuan ketenagalistrikan.Efisiensi transformator merupakan perbandingan daya keluaran dan daya masukan, dimana besar kecilnya efisiensi yang dihasilkan transformator dipengaruhi besar kecilnya pembebanan. Efisiensi juga dipengaruhi oleh rugi-rugi yang terdapat pada transformator. Rugi-rugi yang terdapat pada transformator adalah rugi-rugi inti dan rugi-rugi tembaga, rugi-rugi pada transformator ini menyebabkan perbedaan daya masukan dan daya keluaran, semakin besar rugi-rugi yang dihasilkan pada transformator maka semakin besar daya yang hilang pada transformator tersebut. Tujuan dari penelitian ini yaitu untuk mengetahui besarnya rugi-rugi dan besarnnya nilai efisiensi transformator daya di PT PLN (Persero) Gardu Induk Ulee Kareng. Adapun metode yang digunakan dalam penelitian adalah dengan melakukan studi literatur, pengumpulan data, dan pengolahan data. Pengolahan data dilakukan dengan menggunakan metode matematis untuk mendapatkan arus nominal pada sisi primer dan sekunder trafo, daya input dan output trafo, total rugi-rugi trafo, dan besar efisiensi trafo.Hasilnya didapatkan bahwa rugi-rugi transformator pada beban puncak pagi terbesar adalah 26,14 kW yang terjadi pada tanggal 1 pukul 10:00 WIB dan rugi-rugi terendah adalah 17,23 kW yang terjadi pada tanggal 2 pukul 10:00 WIB. Pada beban puncak malam rugi-rugi transformator terbesar adalah 24,97 kW yang terjadi pada tanggal 1 pukul 19:00 WIB sedangkan rugi-rugi terendah adalah 22,55 kW yang terjadi pada tanggal 5 pukul 19:00 WIB. Efisiensi  transformator terbesar pada beban puncak pagi adalah 99,91% yang terjadi pada tanggal 2 pukul 10:00 WIB, efisiensi transformator terendah adalah 99,85% yang terjadi pada tanggal 4 pukul 10:00 WIB. Pada beban puncak malam efisiensi transformator terbesar adalah 99,87% yang terjadi pada tanggal 2, 3, dan 5 pukul 19:00 WIB dan efisiensi terendah adalah 99,86% yang terjadi pada tanggal 1 dan 4 pukul 19:00 WIB.

Page 1 of 1 | Total Record : 5