cover
Contact Name
Uswatun hasanah
Contact Email
Yayasanbanusamsudin@gmail.com
Phone
085960430213
Journal Mail Official
Yayasanbanusamsudin@gmail.com
Editorial Address
Jalan Candi Pawon No.7 Cakranegara, Mataram, Provinsi Nusa Tenggara Barat, 83118
Location
Kota mataram,
Nusa tenggara barat
INDONESIA
Journal of Technology and Engineering
ISSN : -     EISSN : 30254094     DOI : 10.59613
Jurnal ini merupakan sarana publikasi ilmiah untuk menyebarluaskan informasi berupa ilmu pengetahuan dan terlebih khususnya hasil penelitian hasil penelitian, jurnal ini juga menerima manuskrip hasil kajian pustaka dan laporan lainnya untuk dipublikasikan.
Articles 54 Documents
Perencanaan PLTS 3 MW Kombinasi BESS dengan Skema Load Shifting untuk Sistem Isolated Pulau Bawean Nur Setyo Adi Widodo; Muhamad Habibi; Ricky Cahya Andrian
Journal of Technology and Engineering Vol 4 No 1 (2026): Journal of Technology and Engineering
Publisher : Yayasan Banu Haji Samsudin

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59613/journaloftechnologyandengineering.v4i1.506

Abstract

This engineering practice report presents the planning of a 3 MW Ground-Mounted Solar Power Plant (PV) integrated with a Battery Energy Storage System (BESS) for the isolated electricity system of Bawean Island, East Java, Indonesia. The study focuses on the energy yield assessment using PVSyst simulation to estimate long-term electricity generation and evaluate the technical feasibility of the proposed system. Solar irradiation data, photovoltaic system configuration, system losses, and Probability of Exceedance (P50, P75, and P90) analyzes were employed to assess energy performance. The simulation indicates an average annual energy production of 5,800.88 MWh, 5,680.34 MWh, and 5,571.61 MWh for P50, P75, and P90 scenarios, respectively, with a performance ratio exceeding 75%. To support the load-shifting strategy, a usable BESS capacity of 7,200 kWh is required, including battery augmentation during operation to compensate for capacity degradation. The proposed PV-BESS configuration demonstrates strong technical potential to improve renewable energy utilization and reduce diesel fuel dependency in Bawean's isolated power system.
Application of Professional Ethics Principles and Prevention through Design (PtD) in Power Plant Layout Based on Site Investigation Vidya Ismayanti; Muhamad Habibi; Ricky Cahya Andrian
Journal of Technology and Engineering Vol 4 No 1 (2026): Journal of Technology and Engineering
Publisher : Yayasan Banu Haji Samsudin

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59613/journaloftechnologyandengineering.v4i1.539

Abstract

The feasibility study (FS) is an early phase that largely determines the success of a power plant development project, in which the plant layout is one of the key decisions affecting technical, safety, cost, construction, and operational aspects. This study analyzes the application of Prevention through Design (PtD) in developing the layout of the Java Bali 2 Combined Cycle Power Plant (PLTGU) by using Site Investigation (SI) results. A descriptive-analytical method was used, comparing the preliminary layout prepared before the SI with the final layout prepared after the SI results, covering topographic survey, geotechnical investigation (Standard Penetration Test), hydro-oceanography, climatology, drainage analysis, soil bearing capacity, and air dispersion prediction. The SI identified several key hazards: low land elevation with flood and tidal-flood risk, soft surface soil prone to settlement, water characteristics affecting intake and outfall design, and climatological conditions affecting drainage and structures. Based on these findings, the layout was refined by relocating the Power Block to an area with better soil conditions, arranging the Utility Area according to topography and drainage, and positioning the Fuel Storage Area at a safe distance from the main buildings. The results show that applying PtD at the FS stage reduces the need for ground improvement and cut-and-fill volume, lowers the potential for cost overrun, and produces a layout that is safer, more constructible, efficient, and reliable. This study recommends the systematic application of PtD in the development of power plant layouts and other infrastructure projects. Beyond its technical merits, the integration of Site Investigation into design decisions also reflects the engineer's professional and ethical obligation to prioritize public safety, honesty in reporting field conditions, and accountability for design outcomes — principles embodied in the Indonesian Engineer's Code of Ethics (Catur Karsa and Sapta Dharma).
Standardization of Primary Data for Management Consulting Services for Procurement of UIP MPA Building Construction in the Perspective of Engineering Professional Ethics Erdian Dotty; Muhamad Habibi
Journal of Technology and Engineering Vol 4 No 1 (2026): Journal of Technology and Engineering
Publisher : Yayasan Banu Haji Samsudin

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59613/journaloftechnologyandengineering.v4i1.540

Abstract

The availability of complete and standardized primary data is a crucial factor in supporting the success of the design review and construction supervision process in building construction projects. This study aims to analyze the importance of primary data standardization in improving planning quality, implementation efficiency, and quality control in the construction of the UIP MPA Building. The research method uses a descriptive approach through the stages of preparation, data collection, design review, construction supervision, and evaluation and reporting. The analysis focuses on the completeness of soil investigation data, rainfall, site engineering, earthquake zones, building requirements, technical regulations, and occupational safety and health (K3) aspects. The results of the study indicate that incomplete primary data has the potential to cause design changes, work delays, and increase project costs. The implementation of primary data collection standards from the initial stage has been proven to improve planning accuracy, support regulatory compliance, and strengthen the effectiveness of design review and construction supervision implementation so that project quality, time, and cost targets can be optimally achieved.
Talaud Steam Power Plant Jetty Structure Design Using Soldier Pile Reinforcement to Increase Ship Berthing Capacity from 5,000 Dwt to 10,000 Dwt Suteni Suteni; Christiono Christiono; Victor Assani Desiawan; Maulana Putra
Journal of Technology and Engineering Vol 4 No 2 (2026): Journal of Technology and Engineering
Publisher : Yayasan Banu Haji Samsudin

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59613/journaloftechnologyandengineering.v4i2.553

Abstract

The Talaud PLTU jetty is an important infrastructure that functions as a berthing facility for coal transport ships to ensure the continuity of the power plant's fuel supply. The increase in operational needs requires the ship's berthing capacity to be increased from 5,000 Dead Weight Tonnage (DWT) to 10,000 DWT based on a request from PLN due to the unavailability of 5,000 DWT ships at the local location, which was then assessed with document no. assessment/01/A4. This causes an increase in berthing forces, mooring forces, and lateral loads acting on the jetty structure. This condition requires an evaluation of the capacity of the existing structure and the determination of effective reinforcement methods without disrupting the operation of the power plant. This engineering practice aims to evaluate the performance of the existing jetty structure and design reinforcement alternatives that can increase the capacity of the structure according to operational needs. The methods used include document studies, problem identification, technical data collection, evaluation of the existing structure, load analysis using structural analysis software, and a study of several alternative reinforcement methods based on technical aspects, constructability, cost efficiency, and ease of maintenance. The evaluation results show that the use of soldier piles is the most suitable alternative for increasing the berthing capacity of ships up to 10,000 DWT. This system is able to increase the structure's capacity against horizontal loads, distribute forces more evenly, and minimize the demolition of existing structures. In addition to providing cost and implementation time efficiencies, this method is also able to maintain the continuity of the PLTU operation during the construction process. The application of the soldier pile method shows that the modification of the jetty structure can be carried out safely, reliably, economically, and sustainably in accordance with the principles of professional engineering practices.