cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota bandung,
Jawa barat
INDONESIA
REKA RACANA
ISSN : -     EISSN : 24772569     DOI : -
Core Subject : Education,
Arjuna Subject : -
Articles 24 Documents
Search results for , issue "Vol 4, No 3: September 2018" : 24 Documents clear
Transformasi Gelombang Swell dan Gelombang Angin di Perairan Selatan Bali Fitri Suciaty
RekaRacana: Jurnal Teknil Sipil Vol 4, No 3: September 2018
Publisher : Institut Teknologi Nasional, Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26760/rekaracana.v4i3.28

Abstract

ABSTRAKGelombang swell dengan energi yang besar dan dapat menjalar hingga ratusan kilometer dari daerah pembangkitannya diketahui berpotensi merusak struktur pantai dan juga dapat mengganggu segala aktivitas yang dilakukan di pantai. Gelombang swell juga dinyatakan memberikan pengaruh yang besar pada inundasi yang terjadi di sepanjang pantai selatan Jawa dan Bali pada tanggal 4-9 Juni 2006 (Nugraheni, dkk., 2017). Studi transformasi gelombang swell dan gelombang angin di perairan selatan Bali dilakukan dengan pemodelan numerik  gelombang menggunakan model gelombang generasi ketiga SWAN model. Simulasi dilakukan dengan tiga nested grid dengan resolusi grid #1, #2 dan #3; masing-masing sebesar 0.05o, 0.005o, dan 0.001o. Simulasi dilakukan untuk dua buah skema pemodelan, yaitu model gelombang swell dan model gelombang angin. Hasil model menunjukan kesesuaian dengan data pengamatan. Hasil simulasi memperlihatkan gelombang swell yang berasal dari Samudera Hindia mendominasi kondisi gelombang di perairan selatan Bali selama periode simulasi (18 Desember 2011-6 Februari 2012). Dibandingkan dengan gelombang angin, gelombang swell menghasilkan tinggi gelombang yang lebih besar baik di lepas pantai maupun di area dekat pantai. Gelombang swell mengalami refraksi yang kuat di sekitar Bukit Peninsula.Kata kunci: gelombang Swell, gelombang angin, pemodelan transformasi gelombang. ABSTRACTSwells with its large energy can propagate up to hundreds of kilometers from the generation location. Therefore, swells have the potential to damage the structure of the coast and also can disrupt all activities carried out on the coast. Swells were also stated to have a major influence on the inundation that occurred along the southern coast of Java and Bali on June 4 to 9, 2006 (Nugraheni, et al., 2017). The study of swells and wind waves transformations in the waters of southern Bali is carried out by numerical wave modeling using a third generationwave model SWAN model. Nested grids are used with spatial resolution of grid #1, #2 and #3; is 0.05o, 0.005o, and 0.001o, respectively. Simulations are carried out for two modeling schemes that areswell models and wind wave models. The simulation shows compliance with observation data. The result shows swells originating from the Indian Ocean mostly dominated wave conditions in the waters of southern Bali during simulation period (18 Desember 2011-6 Februari 2012).  Compared to wind waves, swells produce higher wave both in offshore and coastal area. Swells experienced a strong refraction around the Bukit Peninsula.Keywords: swell, wind wave, wave transformation model.
Pemodelan Transportasi pada Jalan Trans Bangka Menggunakan Aplikasi PTV Visum Ghina Ariqoh Ufairoh Yunus; Herman Herman; Andrean Maulana
RekaRacana: Jurnal Teknil Sipil Vol 4, No 3: September 2018
Publisher : Institut Teknologi Nasional, Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26760/rekaracana.v4i3.83

Abstract

ABSTRAKDalam kehidupan sehari-hari manusia tidak bisa lepas dengan namanya transportasi, namun transportasi saat ini kurang diimbangi dengan fasilitas yang ada. Pada penelitian ini lokasi yang ditinjau adalah Jalan Trans Bangka dengan zona kabupaten di Pulau Bangka. Pemodelan dilakukan dalam empat tahap pemodelan transportasi dan pembebanan dilakukan dengan metode pembebanan Keseimbangan Wardrop menggunakan aplikasi PTV Visum. Berdasarkan hasil validasi arus lapangan dengan arus model dapat dikatakan valid karena yang didapat dari grafik memiliki nilai mendekati 1 yaitu 0,86. Pergerakan yang terjadi setelah dibangunnya jalan Trans Bangka pada tahun 2020 menunjukkan hasil arus rata-rata untuk kendaraan penumpang sebesar 170 smp/jam dengan kecepatan 52 km/jam dan kendaraan barang sebesar 165 smp/jam dengan kecepatan 51 km/jam. Hal ini dapat diartikan kendaraan penumpang yang melewati jalan Trans Bangka lebih besar dibandingkan dengan kendaraan barang. Derajat kejenuhan yang didapat pada jalan Trans Bangka tahun 2020 menunjukkan nilai yang relatif kecil atau <0,85.Kata kunci: jaringan jalan, PTV Visum, keseimbangan wardrop ABSTRACTEveryday life people can’t escape with the name of transportation, but the current transportation is less balanced with existing facilities. In this study the location reviewed is Trans Bangka Road with the district zone in Bangka Island. Modeling is done in four stages of transport modeling and loading is done by loading method of Wardrop Balance using PTV Visum application. Based on the results of validation results that the flow field with the flow of the model can be said to be valid because  obtained from the graph has a value close to 1 that is 0.86. The movement occurring after the construction of Trans Bangka road in 2020 shows the average current flow for passenger vehicles of 170 smp/hour with speed 52km/hour and for goods vehicles of 165 smp/hour with speed 51km/hour. It can be interpreted that passenger vehicle passing through Trans Bangka road is bigger compared to goods vehicle. The degree of saturation obtained on the Trans Bangka road in 2020 shows a relatively small value of <0.85.Keywords: road network, PTV Visum, wardrop equilibrium
Kajian Perbandingan Kuat Tumpu Baut Sejajar Serat Hasil Uji Eksperimental dan SNI 7973:2013 Nessa Valiantine Diredja
RekaRacana: Jurnal Teknil Sipil Vol 4, No 3: September 2018
Publisher : Institut Teknologi Nasional, Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26760/rekaracana.v4i3.40

Abstract

ABSTRAKSambungan merupakan salah satu metode yang dapat digunakan untuk mendapatkan dimensi kayu sesuai kebutuhan karena terbatasnya ukuran kayu. Kuat tumpu pasak pada kayu diperlukan pada perhitungan sambungan kayu. Melalui persamaan SNI 7973:2013 kuat tumpu pasak pada kayu dapat ditentukan berdasarkan berat jenis kayu, arah serat dan diameter pasak. Pada penelitian ini dilakukan pengujian eksperimental kuat tumpu baut sejajar serat pada 3 jenis kayu yang dibandingkan dengan analisis teoritis berdasarkan SNI 7973:2013. Pengujian dilakukan berdasarkan ASTM D5764-97a dengan menggunakan baut berdiameter 10 mm. Hasil penelitian menunjukan bahwa kuat tumpu baut hasil pengujian eksperimental nilainya lebih kecil apabila dibandingkan dengan persamaan berdasarkan SNI 7973:2013. Persen beda yang didapatkan adalah sebesar 52,57% untuk kayu Sengon; 18,01% untuk kayu Akasia dan 4,80% untuk kayu Meranti.Kata kunci: kuat tumpu pasak, sejajar serat, SNI 7973:2013.ABSTRACTConnection is one of method that can be used to get the dimension of wood as needed because the limited size of wood. Bearing strength of wood is required on timber connection calculation. According to SNI 7973:2013, bearing strength can be determined based on the spesific gravity, direction of grain and diameter of fasteners. This study compares the value of bearing strength parrallel to wood grain on 3 different types of wood obtain from experimental test with theoritically generated valued based on SNI 7973:2013. Experimental test is done based on ASTM D5764-97a using 10 mm diameter bolts. The result showed that the bearing strength of experimental test has less value compared with the equation based on the SNI 7973:2013. The percentage differences are 52,57% for Sengon; 18,01% for Acasia and 4,80% for Meranti.Keywords: dowel bearing strength, parallel to grain, SNI 7973:2013.
Penanganan Sedimentasi di Pelabuhan Tanjung Api-Api pada Sungai Banyuasin Provinsi Sumatera Selatan Ken Wiralino Taredja; Eka Oktariyanto Nugroho
RekaRacana: Jurnal Teknil Sipil Vol 4, No 3: September 2018
Publisher : Institut Teknologi Nasional, Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26760/rekaracana.v4i3.117

Abstract

ABSTRAKPenumpukan sedimentasi adalah salah satu permasalahan yang dihadapi oleh terminal pelabuhan. Terminal pelabuhan dituntut memberikan fasilitas sarana dan prasarana serta pelayanan sebaik-baiknya agar sesuai dengan Peraturan Menteri Perhubungan Republik Indonesia Nomor 51 Tahun 2015 tentang Penyelenggaraan Pelabuhan Penyebrangan. Tujuan dari penelitian ini adalah untuk mengetahui penanganan sedimentasi yang terjadi pada Pelabuhan Tanjung Api-Api. Sedimentasi yang terjadi pada Pelabuhan Tanjung Api-Api dihitung dengan perhitungan numerik menggunakan aplikasi MIKE 21. Data yang digunakan adalah data sekunder berupa batimetri, pasang surut, gelombang, dan debit. Dari hasil pemodelan didapatkan penumpukan sedimentasi pada pelabuhan penyebrangan sebesar 0,24 mdalam 3 bulan dan dipilih penanganan dengan cara melakukan pengerukan alur hingga -5 m.Kata kunci: pelabuhan, sedimentasi, alur ABSTRACTSedimentation is one of the problems in the port terminals. Port terminals are required to provide facilities, infrastructure and services as written in the regulation PM 51 2015 on the Port Distribution Port. This research aims to explore how to deal with the sedimentation at Tanjung Api-Api Port. Sedimentation that at Tanjung Api-Api Port was calculated by numerical calculation using MIKE 21 application. The data input for numerical model is used form previous study. The input data are bathimetry, tidal, wave, and discharge. The computation shows than the dredging channel by –5 m is proven to be the best design among afters scenario. The calculation of sedimentation depth is similar as primary data and has acknowledge 0,24 in 3 month.Keywords:  port, sedimentation, channel

Page 3 of 3 | Total Record : 24