cover
Contact Name
Tri Wardati Khusniyah
Contact Email
trikhusniyah@unesa.ac.id
Phone
+6281217842262
Journal Mail Official
viteks@unesa.ac.id
Editorial Address
Kampus Unesa 1, Jalan Ketintang, Gedung K4, Surabaya. Kode Pos: 60231
Location
Kota surabaya,
Jawa timur
INDONESIA
Jurnal Vokasi Teknik Sipil
ISSN : -     EISSN : 30642159     DOI : -
Core Subject : Engineering,
Jurnal Vokasi Teknik Sipil is aimed at all academics and practitioners in the field of civil engineering, especially applied civil engineering. The Scope of Applied Civil Engineering Journal covers the results of field research, literature studies, application of the method, development of standard operating procedure, and development of civil engineering technology. The journal is issued 3 (two) times a year and min. 5 articles per issue. The research is viewed through macro or micro civil engineering perspectives from various aspects, such as: planning, design, management, operational, production, , human resources, safety, and finance. Focus and Scope : The scope of the article includes: Construction management Structural Engineering Geotechnical Engineering Construction Materials Construction Surveyors Safety and Environmental of construction
Articles 5 Documents
Search results for , issue "Vol 3 No 3 (2025)" : 5 Documents clear
PRODUKTIVITAS KOMBINASI PEMAKAIAN ALAT BERAT EXCAVATOR DAN DUMP TRUCK PADA PEKERJAAN GALIAN PROYEK PEMBANGUNAN GUDANG CJ LOGISTIC SAFE’N’LOCK ECO INDUSTRIAL PARK Reinanda Aurellia Pramesti
Jurnal Vokasi Teknik Sipil Vol 3 No 3 (2025)
Publisher : Jurnal Vokasi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

In the CJ Logistic Safe’n’Lock Eco Industrial Park Warehouse construction project, there is excavation work that requires heavy equipment such as excavators and dump trucks as aids for earthmoving work. Although this project has been running, the arrangement of heavy equipment used has not been optimal, based on observations made during the earthmoving period there is a waiting time for the excavator to the dump truck, this can affect productivity and also reduce the efficiency of the work process. This study aims to analyze the productivity of excavators and dump trucks, compare combinations of heavy equipment to determine the most optimal choice in terms of time and cost, and determine the number of tools and the most efficient work duration. With a quantitative approach and comparative analysis used to evaluate two alternative combinations of heavy equipment. The calculation results show that the productivity of the Hitachi zx210f-5g excavator is 47.62 m3/hour, and for the productivity of the Mitsubisi Fuso FM 517 HS 7.5 MT dump truck is 26.32 m3/hour. The results of the analysis indicate that combination 3 is the most optimal combination. This combination provides a duration acceleration of 65.71% or 23 hours faster compared to the initial condition, with a cost increase of Rp11,884,875.00 or 39.33%.
PENYUSUNAN ADMINISTRASI QUALITY CONTROL PADA CHECKLIST PEKERJAAN STRUKTUR PROYEK KONSTRUKSI (CASE STUDY GEDUNG TOWER 3 SURABAYA) Via Nuraeni Putri
Jurnal Vokasi Teknik Sipil Vol 3 No 3 (2025)
Publisher : Jurnal Vokasi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Proyek pembangunan Gedung Tower 3 Surabaya merupakan suatu proyek konstruksi bangunan gedung penunjang kegiatan pendidikan  yang membutuhkan penyusunan administrasi pada pekerjaan checklist untuk pekerjaan struktur bangunan. Dalam penyusunan administrasi tidak lepas dari adanya kebutuhan efektivitas waktu proses pengumpulan data dan efisiensi pendistribusian data. Efektivitas pada proses pengumpulan data sangat mempengaruhi efisiensi pendistribusian data. Sehingga perlu dilakukan analisis terhadap variabel checklist pekerjaan struktur dalam administrasi quality control untuk mengetahui kebutuhan data dan cara kerja checklist yang efisien. Variabel checklist pekerjaan struktur mencakup berbagai komponen penyusun pengawasan mutu struktur terhadap pelaksanaan pekerjaan. Data dikumpulkan berdasarkan observasi lapangan dan dokumentasi pada proyek Gedung Tower 3 Surabaya. Mengacu dari data yang telah dikumpulkan, kemudian dilakukan analisis terhadap pelaksanaan checklist beserta proses administrasi berdasarkan kebutuhan data.  Berdasarkan hasil analisis diketahui variabel checklist pekerjaan struktur terdiri dari komponen pendataan proyek, komponen pengecekan teknis bekisting dan pembesian, komponen pemeriksaan alat, serta komponen proses persetujuan akhir dari pihak terkait. Melalui observasi di lapangan diketahui proses administrasi quality control berfokus pada pengawasan mutu pekerjaan yang melibatkan pengawasan internal dan pengawasan eksternal.
EVALUASI GAMBAR KERJA DAN DED GEDUNG RSUD TIGARAKSA BERBASIS STANDAR BUKU ARCHITECTURAL DRAFTING AND DESIGN Iqbal Ghazi Maulana
Jurnal Vokasi Teknik Sipil Vol 3 No 3 (2025)
Publisher : Jurnal Vokasi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Working drawings (construction drawing) play an important role in construction projects as a means of technical communication between planners and executors. Drawings that do not meet proper standards may cause miscommunication in the field and affect the quality of the work. This final project aims to evaluate the conformity of Detailed Engineering Design (DED) and For Construction drawings in the RSUD Tigaraksa project with the standards presented in the book Architectural Drafting and Design, Sixth Edition. The method used is archival research and observation, by reviewing literature and design standards from the book and directly examining the RSUD Tigaraksa working drawings for evaluation. The evaluation was conducted on the site plan, floor plans, roof plans, elevations, sections, and structural drawings. The results indicate deficiencies in several aspects, such as incomplete symbols, unreadable dimensions, and missing technical information. This study is expected to serve as a reference for improving the quality of technical documents in construction projects and supporting more efficient and accurate implementation.
PENGENDALIAN WAKTU DAN TENAGA KERJA DENGAN SOFTWARE PRIMAVERA P6 (Studi Kasus: Proyek Pemangunan Gudang di Kabupaten Tuban) Nur Sa'adah
Jurnal Vokasi Teknik Sipil Vol 3 No 3 (2025)
Publisher : Jurnal Vokasi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

A common problem in construction projects is the difficulty of completing projects on time. Furthermore, resource utilization is often inefficient. A solution to this problem is to use the resource leveling method. The resource leveling method aims to minimize the uneven use of labor throughout the project. The purpose of this study was to determine the differences in project schedules and human resource allocation before and after the implementation of labor equalization. Project data in the form of work items, the duration of each job, the relationship between work items, and the number of workers per job were analyzed using Primavera P6 software to obtain the ideal human resource allocation. The results showed an increase in working time of 9 days or 3.4%. In addition, there were also changes in the resources of craftsmen and workers in September with a decrease of 12.2% each. In October, there was an increase in the number of craftsmen by 23 people and workers by 33 people.
SISTEM INFORMASI GEOGRAFIS PEMETAAN PADA GEDUNG KANTOR KECAMATAN DAN KANTOR KELURAHAN DI WILAYAH KABUPATEN TUBAN IRGIANTI NUR WIBIANA IRGIANTI
Jurnal Vokasi Teknik Sipil Vol 3 No 3 (2025)
Publisher : Jurnal Vokasi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The Village Office and District Office are facilities provided by the Tuban Regency Government, where the existence of the village office and district office has the function of improving public services, implementing government functions, and empowering the community in order to accelerate the realization of community welfare. Therefore, information regarding the mapping of the location and distribution patterns of the Village Office and District Office can be informed to the public using Geographic Information System (GIS) technology. It is hoped that people who do not know will be able to find the location of the Village Office and District Office more easily. In addition, the results of the mapping can later be used to determine the distribution pattern of the Village Office and District Office in Tuban Regency and it is hoped that this research can be a reference data for the Government in equalizing the location of the Village Office and District Office in Tuban Regency. This study uses the buffering method with ArcGIS 10.8 software to determine the distribution pattern of the Village Office and District Office in Tuban Regency. The results of this study are the distribution pattern of Village Offices and District Offices in Tuban Regency shows a dispersed pattern and the service coverage of Village Offices and District Offices can be categorized as high with a distance of 3 km.

Page 1 of 1 | Total Record : 5