cover
Contact Name
Nur Hasanah
Contact Email
nur.hasanah@batan.go.id
Phone
+6221-5204243
Journal Mail Official
jpen@batan.go.id
Editorial Address
Kawasan Kantor Pusat Badan Tenaga Nuklir Nasional Jl. Kuningan Barat, Mampang Prapatan, Jakarta 12710 Kotak Pos 4390 Jakarta 12043
Location
Kota adm. jakarta selatan,
Dki jakarta
INDONESIA
Jurnal Pengembangan Energi Nuklir
ISSN : 14109816     EISSN : 25029479     DOI : https://doi.org/10.17146/jpen
Jurnal Pengembangan Energi Nuklir publishes scientific papers on the results of studies and research on nuclear energy development with the scope of energy and electricity planning, nuclear energy technology, energy economics, management of nuclear power plants, national industries that support nuclear power plants, aspects of the nuclear power plant site and environment, and topics others that support the development of nuclear energy.
Articles 9 Documents
Search results for , issue "Vol 14, No 1 (2012): Juni 2012" : 9 Documents clear
ANALISIS POTENSI THORIUM SEBAGAI BAHAN BAKAR NUKLIR ALTERNATIF PLTN Erlan Dewita
Jurnal Pengembangan Energi Nuklir Vol 14, No 1 (2012): Juni 2012
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2012.14.1.1476

Abstract

ABSTRAKANALISIS POTENSI THORIUM SEBAGAI BAHAN BAKAR NUKLIR ALTERNATIF PLTN. Dewasa ini, sebagian besar reaktor daya nuklir dunia menggunakan bahan bakar basis uranium (UO2) dengan pengayaan 2-5%. Namun akhir-akhir ini, perhatian dunia banyak tertuju pada bahan bakar basis thorium terkait beberapa keuntungan. Selain pertimbangan sumberdaya thorium(Th) dunia yang besar (sekitar 3 kali lebih besar dari sumber daya uranium), penggunaan bahan bakar basis thorium juga akan mengurangi jumlah limbah radioaktif, sifat-sifat nuklir U-233 juga lebih unggul dibanding U-235 dan Pu-239 dalam reaktor termal. Penggunaan bahan bakar nuklir basis thorium diharapkan bermanfaat untuk menjaga keberlanjutan energi nuklir dan keamanan dari senjata nuklir. Tujuan studi adalah menganalisis potensi thorium sebagai bahan bakar nuklir alternatif untuk PLTN ditinjau dari aspek sumber daya alam dan proses pemisahan thorium dari monazite. Studi dilakukan dengan mengkaji beberapa pustaka. Hasil studi diharapkan dapat menjadi bahan pertimbangan bagi pemerhati/ peneliti bahan bakar nuklir untuk mengembangkan bahan bakar basis thorium. Hasil menunjukkan bahwa thorium tersebar dalam lapisan bumi dalam bentuk batuan dan mineral. Mineral dengan kandungan thorium terbesar adalah mineral thorium fosfat-tanah jarang, monazit (Ce-La-Y) mengandung sekitar 12% ThO2, namun rata-rata mengandung ThO2 sekitar 6-7%. Sumberdaya thorium dunia 5.385.000 ton dan sumberdaya terbesar terdapat di India yaitu 846.000 ton (16%). Th-232 merupakan bahan fertil yang lebih unggul dibanding U-238, karena tampang lintang serap netron Th-232 dalam reaktor termal 3 kali lebih tinggi dibanding U-238 dimana untuk Th-232 (7.4 barns) dan U-238 (2.7 barns). Sedangkan untuk proses ekstraksi dari monazit dikenal ada 2 proses, yaitu opening acid dan opening alkali, sedangkan pemungutan thorium dari bahan bakar bekas digunakan proses thorex.Kata kunci: potensi, thorium, bahan bakar, cadangan, uranium ABSTRACTPOTENCY ANALYSIS OF THORIUM AS ALTERNATIVE NUCLEAR FUEL FOR NPP. Nowdays, most of nuclear power reactors use (UO2) uranium based fuel with 2-5% enrichment uranium. However, recently much attention are given to thorium based fuel correlation to several advantages of thorium used. Besides of consideration that thorium reserve in the world is high (about 3 times higher than uranium reserves), the use of thorium based fuel will also decrease the amount of radioactive waste, nuclear properties of U-233 is better than U-235 and Pu-239 in the thermal reactor. Use of thorium based nuclear fuel is hoped useful for keep nuclear energy sustainability and safeguard of nuclear weapon. Object of this study is analizing the thorium potency as alternative nuclear fuel for NPP in viewpoint of thorium reserves aspect and thorium separation process from monazit or from reprocessing of spent fuel. Study is conducted by assess several references. Result of this study is hoped to be valuable for nuclear fuel researcher to developing thorium based fuel. Result of this study mentioned that thorium is distributed in earth’s crust as ores or minerals. Mineral with highest thorium is thorium fosfat-rare earth, monazit (Ce-La-Y) containing about 12% ThO2, however, it containing ThO2 average about 6-7%. The world’s thorium resources is 5.385.000 ton and the highest thorium resurces is 846.000 ton (16%) in India. Thorium-232 is fertle material which is better than U-238, because neutron absorbed cross section of Th-232 in thermal spectrum is 3 times higher than U-238 where is Th-232 (7.4 barns) and U-238 (2.7 barns). While, there are 2 processes of thorium extraction, namelyopening acid dan opening alkali and thorium recovery from thorium based nuclear spent fuel is used thorex.Keywords: potency, thorium, fuel, reserves, uranium
OPTIMALISASI PENYALURAN DAYA PLTN DI PULAU BANGKA UNTUK SISTEM KELISTRIKAN SUMATERA Citra Candranurani; Iwa Garniwa
Jurnal Pengembangan Energi Nuklir Vol 14, No 1 (2012): Juni 2012
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2012.14.1.1471

Abstract

ABSTRAKANALISA PENYALURAN DAYA PLTN DI PULAU BANGKA UNTUK SISTEM KELISTRIKAN SUMATERA. Target bauran energi yang tertuang dalam perpres No. 5 Tahun 2006 mentargetkan sebesar 2 % dari total kebutuhan energi nasional di tahun 2025 akan bersumber dari energi nuklir. Badan Tenaga Nuklir Nasional (BATAN) selaku promotor untuk persiapan pembangunan Pembangkit Listrik Tenaga Nuklir (PLTN) telah membuat roadmap jangka panjang, dimana pada tahun 2024 di rencanakan PLTN dari pulau Bangka sudah masuk ke dalam sistem kelistrikan Sumatera. Untuk menunjang hal tersebut maka dilakukan persiapan perencanaan sistem dan jaringan di Sumatera. Perencanaan ini dibuat dengan bantuan perangkat lunak Electrical Transient Analyzer Program (ETAP). Asumsi pada penelitian ini ada tiga, yaitu pertumbuhan beban sebesar 10,2% pertahun hingga tahun 2024, penambahan PLTN dengan kapasitas 2x1000 MW di pulau Bangka, serta pembuatan sistem dan jaringan transmisi untuk penyaluran daya PLTN pada sistem interkoneksi Sumatera. Dari hasil penelitian diperoleh optimalisasi penyaluran daya PLTN pada sistem Sumatera yang terbaik adalah melalui sub sistem Sumatera Utara yaitu melalui IBT Seirotan atau Paya geli. Nilai losses keseluruhan sistem pada penyaluran ini adalah 157 MW atau 1,646 %. Penyaluran daya PLTN pada IBT ini memberikan perbaikan kondisi tegangan IBT yang terbaik yaitu sejumlah 43,4%.Kata kunci: optimalisasi, losses, sistem tenaga listrik, PLTN ABSTRACTANALYSIS OF NPP POWER DISTRIBUTION IN BANGKA ISLAND FOR ELECTRICITY SYSTEM OF SUMATERA. Energy diffusion target on the regulation No. 5, 2006, says that 2 % of total national energy need is come from nuclear energy. National Nuclear Energy Agency (BATAN) as the promoter of the development Nuclear Power Plant(NPP), has made a long term roadmap, whereas in the year of 2024, Nuclear Power Plant from Bangka Island will be injected to the Sumatera interconnection system. For the system and transmission planning preparation, the simulation has been made with Electrical Transient Analyzer Program (ETAP) Software. The are three assumption in this research, 10,2 % annual load growth until 2024, enhancement of NPP with 2 x 1000 MW capacity at Bangka island, and improvement of the system and transmission line to deliver the power from NPP to Sumatera interconection system. The research result gives that the optimum power distribution by north sumatera sub system through IBT Seirotan or Paya Geli. Total losses whole systemof this distribution is 157 MW or 1,646%, and improvement total IBT condition voltage as many as 43,4 %.Keywords: optimization, losses, electrical power system, nuclear power plant
Hal Muka JPEN 2012 Volume 14 No 1 Juni Hal Muka
Jurnal Pengembangan Energi Nuklir Vol 14, No 1 (2012): Juni 2012
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2012.14.1.3419

Abstract

STUDI PROSPEK PLTN DAYA KECIL NUSCALE DI INDONESIA Rr. Arum Puni Rijanti; Sahala Maruli Lumbanraja
Jurnal Pengembangan Energi Nuklir Vol 14, No 1 (2012): Juni 2012
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2012.14.1.1477

Abstract

ABSTRAKSTUDI PROSPEK PLTN DAYA KECIL NUSCALE DI INDONESIA. Kebutuhan energi listrik di Indonesia semakin meningkat sebanding dengan pertumbuhan penduduk, pendapatan masyarakat, dan peningkatan gaya hidup masyarakat, seperti penggunaan teknologi informasi, dll. Berbagai alternatif pembangkit listrik perlu dipelajari baik dari segi keandalan pasokan, keekonomian, keselamatan, keamanan, pencemaran lingkungan yang ditimbulkan, sehingga dapat memenuhi kriteria yang ditentukan. Pembangunan PLTN daya besar konvensional di Indonesia terkendala pada penolakan masyarakat dan pembiyaan sehingga menimbulkan keraguan pemerintah untuk mengambil keputusan. PLTN daya kecil NuScale merupakan salah satu alternatif yang dapat diimplementasikan di Indonesia karena biaya modal kecil, pembangunan unit ke-n mudah disesuaikan dengan kebutuhan, waktu konstruksi pendek (kira-kira 3 tahun), kapasitas terpasang lebih besar dari 90%, sistem keselamatan pasif dan inheren.Kata kunci: nuscale, PLTN daya kecil, generasi 3+ ABSTRACTPROSPECT STUDY OF NUSCALE SMALL NPP IN INDONESIA. Electrical energy demand in Indonesia has increased proportional with population growth, incomes, and improving people's lifestyle, such as the use of information technology, etc. A variety of alternative power generation needs to be studied in terms of supply reliability, economy, safety, security, environmental impact, so as to meet the prescribed criteria. Conventional large nuclear power plant construction in Indonesia is constrained to the rejection of society and thus cast doubt on the government financing decisions. NuScale small nuclear power plant is one alternative that can be implemented in Indonesia because of the cost of capital is small, the construction unit of the n easily tailored to the needs, short construction time (about 3 years), the installed capacity of greater than 90%, passive safety systems and inherent.Keywords: nuscale, small NPP,generation 3+
ANALISIS KUALITAS PELAYANAN SISTEM KELISTRIKAN BANGKA BELITUNG OPSI NUKLIR Rizki Firmansyah Setya Budi; Suparman Suparman
Jurnal Pengembangan Energi Nuklir Vol 14, No 1 (2012): Juni 2012
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2012.14.1.1472

Abstract

ABSTRAKANALISIS KUALITAS PELAYANAN SISTEM KELISTRIKAN BANGKA BELITUNG OPSI NUKLIR. Studi ini bertujuan untuk menganalisis kualitas pelayanan sistem kelistrikan Bangka Belitung pada saat PLTN pertama kali beroperasi (tahun 2023) dan saat akhir masa studi (tahun 2030) agar dapat diketahui sistem kelistrikan tersebut sudah baik atau masih perlu dilakukan perbaikan. Studi perencanaan pengembangan pembangkitan listrik opsi nuklir dilakukan dengan WASP IV. Perencanaan pengembangan jaringan transmisi dilakukan berdasarkan RPTL PT. PLN (Persero) Wilayah Bangka Belitung Tahun 2011-2020 dan diasumsikan tidak ada penambahan lagi sampai tahun 2030 dan sudah dilakukan interkoneksi antara sistem Bangka dengan sistem Belitung. Analisis kualitas pelayanan sistem kelistrikan dilakukan dengan ETAP. Hasil studi menunjukkan bahwa frekuensi sistem kelistrikan Bangka Belitung masih dalam standar PLN (50 Hz). Tegangan terendah dalam sistem tersebut sebesar 88%(tahun 2023) dan 79% (tahun 2030) dari tegangan nominalnya sehingga drop tegangan sistem masih jauh melebihi standar drop tegangan PLN. Perbaikan tegangan sistem kelistrikan Bangka Belitung dapat dilakukan dengan berbagai cara, yaitu: pengaturan tegangan, pengaturan luas penampang saluran, penambahan saluran baru, dan pemasangan kapasitor.Kata kunci: kualitas pelayanan, perencanaan pengembangan, nuklir ABSTRACTQUALITY SERVICE ANALYSIS OF BANGKA BELITUNG ELECTRICITY SYSTEM WITH NUCLEAR OPTION. The goal of the study is to analyze the quality service of Bangka Belitung elctricity system so can be known that the electricity system is good or need an improvement. The study of electricity generation development planning was done using WASP IV. The transmission development planning based on RPTL PT. PLN (Persero) Wilayah Bangka Belitung Tahun 2011-2020 and assumed that no more improvement and Bangka system was interconected with Belitung system. The analyze of Bangka Belitung electricity quality service was done using ETAP. The result showed that the frequency is 50 Hz and appropriate with the PLN’s standard. The lowest voltage in the system are 88% (year of 2023) and 79% (year of 2030) from the nominal voltage so the drop voltage exceed the PLN’s standard. The voltage betterment can be done by voltage controlling, line sectional area controlling, adding new line, and installing capacitor.Keywords: quality service, expansion planning, nuclear
Hal Belakang JPEN 2012 Volume 14 No 1 Juni Hal Belakang
Jurnal Pengembangan Energi Nuklir Vol 14, No 1 (2012): Juni 2012
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2012.14.1.3420

Abstract

APLIKASI ENERGI PANAS NUKLIR TEMPERATUR TINGGI PADA PABRIK PUPUK UREA Djati Hoesen Salimy
Jurnal Pengembangan Energi Nuklir Vol 14, No 1 (2012): Juni 2012
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2012.14.1.1478

Abstract

ABSTRAKAPLIKASI ENERGI PANAS NUKLIR TEMPERATUR TINGGI PADA PABRIK PUPUK UREA. Telah dilakukan studi aplikasi energi panas nuklir temperatur tinggi pada pabrik pupuk urea. Tujuan studi ini adalah untuk memahami karakteristik dan kemungkinan pemanfaatan energi panas reaktor nuklir temperatur tinggi pada produksi pupuk urea. Dalam studi ini, pabrik pupuk urea dengan kapasitas produksi sebesar 1725 ton per hari digunakan sebagai acuan perhitungan. Dalam studi diskenariokan bahwa semua kebutuhan energi panas dalam bentuk process heat, process steam, dan listrik dipenuhi dengan energi nuklir. Dari neraca energi diperoleh bahwa dari energi termal reaktor nuklir temperatur tinggi dengan daya sebesar 600 MWt, dapat dimanfaatkan untuk process heat pada proses steam reforming gas alam sebesar 274,3 MWt, sedang untuk process steam dan listrik diperoleh dengan mengkonversi panas nuklir sebesar 101,44 MWt. Total energi panas sebesar 375,74 MWt telah mencukupi untuk operasi pabrik. Energi panas yang tersisa sebesar 164,25 MWt dikonversi menjadi listrik sebesar 54,2 MWe untuk disambungkan ke jaringan PLN. Aplikasi energi panas reaktor nuklir temperatur tinggi juga memberi keuntungan penghematan gas alam. Jika pada proses konvensional kebutuhan gas alam antara lain untuk bahan baku, sumber energi panas reaksi, dan utilitas (termasuk listrik), pada proses dengan nuklir kebutuhan gas alam hanya untuk bahan baku proses. Pada proses konvensional, dari total kebutuhan gas alam sebesar 21,25 juta MMBTU per tahun, hanya sekitar 8,95 juta MMBTU sebagai bahan baku. Penghematan yang diperoleh dengan pemanfaatan panas nuklir sebesar 12,3 juta MMBTU (~60%) yang setara dengan pengurangan laju emisi gas CO2 sebesar 718.192,42 ton/tahun.Kata kunci: pupuk urea, steam reforming, process heat, process steam ABSTRACTTHE APPLICATION OF HIGH TEMPERATUR NUCLEAR HEAT FOR UREA FERTILIZER PLANT. The study of high temperature nuclear heat application for urea fertilizer plant has been carried out. The goal of the study is to understand the characteristic and possibility of high temperature nuclear heat application for urea fertilizer plant. In this study, the urea fertilizer plant with the capacity production of 1725 ton per day is used as a reference. Energy balance calculatin indicate that thermal energi from high temperatur nuclear reactor with thermal power of 600 MWt, can be distributed as follow: 274,3 MWt can be utilized as process heat for natural gas steam reforming, while about 101,44 MWt for process steam and electricity production to support the process. Total energy required for operating the plant is 375,74 MWt. The rest, about 101,44 MWt is converted to electricity about 54,2 MWe, send to the public grid. In conventional process of urea fertilizer plant, the demand of natural gas is used for raw material, heat energy source for chemical reaction, and utility (process steam and electricity), while for nuclear application the need of natural gas only for raw material. At conventional process, from total demand of natural gas about 21.25 million MMBTU per year, only about 8.95 million MMBTU used as raw material. n About 12,3 million MMBTU (~60%) natural gas can be saved that mean reduce CO2 emmision about 718,192.42 ton/year.Keywords: urea fertilizer, steam reforming, process heat, process steam
ANALISIS PROBABILISTIK PADA PERHITUNGAN BIAYA PEMBANGKITAN LISTRIK TERARAS PLTN Nuryanti Nuryanti; Akhmad Hidayatno; Suparman Suparman; Erlinda Muslim; Armand Omar Moeis
Jurnal Pengembangan Energi Nuklir Vol 14, No 1 (2012): Juni 2012
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2012.14.1.1473

Abstract

ABSTRAKANALISIS PROBABILISTIK PADA PERHITUNGAN BIAYA PEMBANGKITAN LISTRIK TERARAS PLTN. Keputusan strategis investasi pada proyek infrastruktur seperti PLTN menjadi sangat krusial dan memerlukan analisis yang mendalam, termasuk perhitungan keekonomian. Salah satu aspek dari keekonomian proyek pembangkit adalah perhitungan biaya pembangkitan listrik teraras atau Levelized Unit Electricity Cost (LUEC). Proyek PLTN sangat rentan terhadap sejumlah variabel ketidakpastian, oleh karena itu tujuan penelitian ini adalah untuk melakukan perhitungan LUEC PLTN dengan memasukkan sejumlah variabel ketidakpastian,yaitu dengan pendekatan probabilistik. Pada studi ini dilakukan analisis probabilistik dengan teknik Monte Carlo yang mensimulasikan keterkaitan di antara variabel-variabel ketidakpastian dan dilihat pengaruhnya terhadap LUEC. Hasil penelitian menunjukkan terjadinya peningkatan nilai LUEC pada pendekatan probabilistik dibandingkan dengan pendekatan deterministik (dari 9,8246 cent US$/kWh menjadi 11,1907 cent US$/kWh pada AP1000 dan dari 4,7413 cent US$/kWh menjadi 7,3321 cent US$/kWh pada OPR1000). Peningkatan nilai LUEC ini mencerminkan terjadinya dispersi akibat adanya beberapa variabel ketidakpastian yang mungkin terjadi dalam proyek, sehingga LUEC hasil analisis probabilistik ini disebut Risk Adjusted LUEC. Dengan analisis probabilistik dapat pula diketahui probabilitas terjadinya LUEC < 8,5 cent US$/kWh (nilai benchmark), yaitu sebesar 30% pada PLTN AP1000 dan 90% pada PLTN OPR1000.Kata kunci: ketidakpastian, analisis probabilistik, LUEC, PLTN, Monte Carlo ABSTRACTPROBABILISTIC ANALYSIS ON CALCULATION OF LEVELIZED UNIT ELECTRICITY COST (LUEC) OF NUCLEAR POWER PLANT (NPP). Strategic investment decisions on infrastucture project such as NPP development are crucial and require careful analysis, including economic calculation. One aspect of the project economic is calculation of LUEC. NPP project are vulnerable to a number of uncertain variables, therefore the purpose of this study was to perform calculations of NPP’s LUEC under uncertainties, namely probabilistic approach.In this study probabilistic analysis was done by Monte Carlo techniques that simulate the relationship between the uncertainty variables and visible impact on LUEC.The results showed an increase of LUEC value in probabilistic approach compared to deterministic approach (from US$ 9.8246 cents/kWh to US$ 11.1907 cents kWh in AP1000 and from US$ 4.7413 cents kWh to 7.3321 cents US$/kWh in OPR1000). The increase reflects the dispersion due to some uncertainty variables that may occur in the project,so LUEC of probabilistic analysis is called Risk Adjusted LUEC. With this analysis can also be known probability of LUEC < US$ 8.5 cent/kWh (benchmark value), ie by 30% in AP1000 and 90% in OPR1000.Keywords: uncertainties, probabilistic analysis, Monte Carlo technique, NPP
ANALISIS PENERAPAN MANAJEMEN RISIKO FINANSIAL PADA PROYEK PLTN DI INDONESIA Imam Bastori; Moch. Djoko Birmano
Jurnal Pengembangan Energi Nuklir Vol 14, No 1 (2012): Juni 2012
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2012.14.1.1475

Abstract

ABSTRAKANALISIS PENERAPAN MANAJEMEN RISIKO FINANSIAL PADA PROYEK PLTN DI INDONESIA. Proyek PLTN adalah bisnis penuh dinamika, risiko dan tantangan. Penerapan manajemen risiko finansial dalam proyek PLTN menjadi alternatif yang harus dipertimbangkan secara teliti. Makalah ini bertujuan untuk memaparkan analisis pengambilan keputusan dalam penerapan manajemen risiko finansial sehingga dapat diaplikasikan dalam pembangunan PLTN di Indonesia. Sebagai studi kasus dipilih PLTN tipe PWR konvensional kelas 1150 MWe. Untuk menghitung ekonomi dan pendanaan PLTN digunakan Spreadsheet INOVASI, selanjutnya keputusan penerapan manajemen risiko finansial dianalisis dengan menggunakan model Penyesuaian Arus Kas (cash flow adjustment) yang dikembangkan oleh Richard Fairchild. Hasil analisis menunjukkan bahwa Metode Penyesuaian Arus Kas (cash flow adjustment) yang dikembangkan oleh Richard Fairchild adalah metode yang lebih baik dibandingkan metode penyesuaian NPV pada suatu proyek PLTN, karena telah memasukkan aspek manajemen risiko finansial. Proyek PLTN hanya bisa dijalankan hanya jika NPV lebih besar atau sekurang-kurangnya sama dengan nol dan keputusan menjalankan manajemen risiko finansial harus didasarkan pada NPVrm>NPV. Penerapan manajemen risiko finansial pada proyek PLTN tidak dibutuhkan jika biaya premi asuransi yang harus dibayarkan lebih mahal dibandingkan dengan seluruh pengeluaran biaya-biaya dalam kondisi yang berbahaya dari finansial, kecuali jika pihak asuransi dapat memberikan diskon minimal 20%.Kata kunci: manajemen, risiko finansial, PLTN ABSTRACTTHE ANALYSIS OF FINANCIAL RISK MANAGEMENT APPLICATION FOR NPP PROJECT IN INDONESIA. NPP Project is one of full dynamic, risky and challenging business. Application of financial risk management in Nuclear Power Plant (NPP) project becomes one alternative to be considered carefully. This paper explains an analysis to make a decision in the risk management application so that it can be applied in the NPP’s construction in Indonesia. As case study, is NPP of conventional PWR type of class 1150 MWe. To calculate the economics and financing of NPP is used Spreadsheet INOVASI, further the decision of financial risk management were analyzed using a Model of Cash Flow Adjustment, which developed by Richard Fairchild. The analysis showed that the Method of Cash Flow Adjustment developed by Richard Fairchild is better than the method of NPV Adjustment on a NPP project, because it have included the aspects of financial risk management. NPP project can only be executed if the NPV ≥ 0 and decision to execute the financial risk management should be based on NPVrm > NPV. The application of financial risk management in NPP project is not needed if an insurance premium more expensive than all costs of financial distress, unless the insurance company can give discount of at least 20%.Keywords: management, financial risk, NPP

Page 1 of 1 | Total Record : 9


Filter by Year

2012 2012


Filter By Issues
All Issue Vol 23, No 2 (2021): Desember 2021 Vol 23, No 1 (2021): Juni 2021 Vol 22, No 2 (2020): Desember 2020 Vol 22, No 1 (2020): Juni 2020 Vol 21, No 2 (2019): Desember 2019 Vol 21, No 1 (2019): Juni 2019 Vol 20, No 2 (2018): Desember 2018 Vol 20, No 1 (2018): Juni 2018 Vol 19, No 2 (2017): Desember 2017 Vol 19, No 1 (2017): Juni 2017 Vol 18, No 2 (2016): Desember 2016 Vol 18, No 1 (2016): Juni 2016 Vol 17, No 2 (2015): Desember 2015 Vol 17, No 1 (2015): Juni 2015 Vol 16, No 2 (2014): Desember 2014 Vol 16, No 1 (2014): Juni 2014 Vol 15, No 2 (2013): Desember 2013 Vol 15, No 1 (2013): Juni 2013 Vol 14, No 2 (2012): Desember 2012 Vol 14, No 1 (2012): Juni 2012 Vol 13, No 2 (2011): Desember 2011 Vol 13, No 1 (2011): Juni 2011 Vol 12, No 2 (2010): Desember 2010 Vol 12, No 1 (2010): Juni 2010 Vol 11, No 2 (2009): Desember 2009 Vol 11, No 1 (2009): Juni 2009 Vol 10, No 2 (2008): Desember 2008 Vol 10, No 1 (2008): Juni 2008 Vol 9, No 2 (2007): Desember 2007 Vol 9, No 1 (2007): Juni 2007 Vol 8, No 2 (2006): Desember 2006 Vol 8, No 1 (2006): Juni 2006 Vol 7, No 2 (2005): Desember 2005 Vol 7, No 1 (2005): Juni 2005 Vol 6, No 2 (2004): Desember 2004 Vol 6, No 1 (2004): Juni 2004 Vol 5, No 2 (2003): Desember 2003 Vol 5, No 1 (2003): Juni 2003 Vol 4, No 2 (2002): Desember 2002 Vol 4, No 1 (2002): Juni 2002 Vol 3, No 2 (2001): Desember 2001 Vol 2, No 4 (2000): Desember 2000 Vol 2, No 3 (2000): September 2000 Vol 2, No 2 (2000): Juni 2000 Vol 2, No 1 (2000): Maret 2000 Vol 1, No 4 (1999): Desember 1999 Vol 1, No 3 (1999): September 1999 Vol 1, No 1 (1999): Maret 1999 More Issue