cover
Contact Name
Nur Hasanah
Contact Email
nur.hasanah@batan.go.id
Phone
+6221-5204243
Journal Mail Official
jpen@batan.go.id
Editorial Address
Kawasan Kantor Pusat Badan Tenaga Nuklir Nasional Jl. Kuningan Barat, Mampang Prapatan, Jakarta 12710 Kotak Pos 4390 Jakarta 12043
Location
Kota adm. jakarta selatan,
Dki jakarta
INDONESIA
Jurnal Pengembangan Energi Nuklir
ISSN : 14109816     EISSN : 25029479     DOI : https://doi.org/10.17146/jpen
Jurnal Pengembangan Energi Nuklir publishes scientific papers on the results of studies and research on nuclear energy development with the scope of energy and electricity planning, nuclear energy technology, energy economics, management of nuclear power plants, national industries that support nuclear power plants, aspects of the nuclear power plant site and environment, and topics others that support the development of nuclear energy.
Articles 9 Documents
Search results for , issue "Vol 15, No 2 (2013): Desember 2013" : 9 Documents clear
ANALISIS ALTERNATIF TIPE PONDASI DAN EKSKAVASI-DALAM PADA LOKASI CALON TAPAK PULAU PANJANG, SERANG Heri Syaeful; June Mellawati
Jurnal Pengembangan Energi Nuklir Vol 15, No 2 (2013): Desember 2013
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2013.15.2.1499

Abstract

ABSTRAKANALISIS ALTERNATIF TIPE PONDASI DAN EKSKAVASI-DALAM PADA LOKASI CALON TAPAK PULAU PANJANG, SERANG. Pulau Panjang merupakan salah satu lokasi alternatif yang sedang dikaji sebagai calon tapak PLTN. Tanah permukaannya didominasi oleh endapan pasir dan cangkang hingga kedalaman belasan meter, selain itu juga perselingan pasir dan lempung hingga kedalaman sekitar 120 m. Tujuan penelitian adalah menganalisis alternatif tipe pondasi dan simulasi pembuatan ekskavasi-dalam pada saat konstruksi pondasi khususnya terkait aspek kestabilan lereng. Metode yang digunakan meliputi pengumpulan data hasil analisis laboratorium mekanika tanah/batuan, pengukuran kecepatan gelombang geser dengan metode PS logging, dan analisis alternatif tipe pondasi dan ekskavasi-dalam. Hasil analisis tipe pondasi yang dapat diterapkan pada calon tapak Pulau Panjang adalah kombinasi dari pondasi rakit dan pile. Batuan dengan Vs > 400 m/s pada kedalaman 44 m dapat dijadikan sebagai dasar konstruksi pondasi rakit. Di bagian bawahnya disambung dengan pondasi pile yang dikonstruksi sampai batuan dasar dikedalaman 120 m pada Vs > 900 m/s. Hasil analisis kestabilan lereng pada ekskavasi dalam dengan ketinggian lereng 44 m, sudut vertikal, pada kondisi normal menghasilkan nilai faktor keselamatan 0,184 dan pada kondisi beban gempa sebesar 0,138. Simulasi pemasangan angkur dengan spasi 1,25 m sebanyak 15 buah menghasilkan faktor keamanan di atas 1,0.Kata kunci: Pondasi PLTN, ekskavasi-dalam, kestabilan lereng ABSTRACTANALYSIS OF FOUNDATION TYPE ALTERNATIVE AND DEEP-EXCAVATION ON CANDIDATE SITE LOCATION OF PANJANG ISLAND, SERANG. Panjang Island is one of the alternatives location which is being studied as NPP site candidate. Its soil surface dominated by sand and eggshell deposit to the depth of tens of meter, beside that also the interlayer of sand and clay to the depth of 120 m. Purpose of the research is to analyze the alternative of foundation type and simulation of deep-excavation during foundation construction especially related to the slope stability aspect. The methods includes data collection of the analysis result of soil/rock mechanical laboratory, measurement of shear wave velocity by PS logging method, and analysis of alternative foundation type and deep-excavation. The analysis result of foundation type that can be applied on Panjang Island candidate site is combination of raft and pile foundation. Rock with Vs > 400 m/s in depth of 44 meter could be made as base of raft foundation construction. In the bottom it connected to pile foundation which is constructed to base rock in the depth of 120 m in Vs > 900 m/s. The result of slope stability analysis on deep-excavation with slope height of 44 m, vertical angle, on normal condition yield safety factor of 0,184 and on the condition of seismic load 0,138. Simulation of anchor installation with spacing 1,25 m as much as 15 pieces yield safety factor higher than 1,0.Keywords: NPP foundation, deep-excavation, slope stability
KAJIAN PERKEMBANGAN PLTN GENERASI IV Yohanes Dwi Anggoro; Dharu Dewi; Nurlaila Nurlaila; Arief Tris Yuliyanto
Jurnal Pengembangan Energi Nuklir Vol 15, No 2 (2013): Desember 2013
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2013.15.2.1494

Abstract

ABSTRAKSTATUS TERKINI PERKEMBANGAN PLTN GENERASI IV. Saat ini perkembangan teknologi PLTN telah mencapai tahap penelitian dan pengembangan PLTN Generasi IV (sistem reaktor maju) yang merupakan pengembangan inovatif dari PLTN generasi sebelumnya. Terdapat enam tipe reaktor daya Generasi IV, yaitu: Very High Temperature Reactor (VHTR), Sodium-cooled Fast Reactor (SFR), Gas-cooled Fast Reactor (GFR), Lead-cooled Fast Reactor (LFR), Molten Salt Reactor (MSR), dan Super Critical Water-cooled Reactor (SCWR). Tujuan studi adalah untuk mengetahui sejauh mana perkembangan PLTN Generasi IV yang telah dilakukan oleh tiga belas negara yang tergabung dalam Gen IV International Forum (GIF). Metode yang digunakan adalah kajian pustaka dan mengacu pada berbagai studi terkait status terkini perkembangan penelitian dan pengembangan PLTN Generasi IV. Hasil kajian menunjukkan bahwa sistem dan teknologi PLTN Generasi IV menawarkan kemajuan yang signifikan dalam hal keberlanjutan, keandalan dan keselamatan, ekonomi, pencegahan pemanfaatan senjata nuklir dan proteksi fisik. Selain itu, berdasarkan pengalaman penelitian dan pengembangan dapat diperkirakan PLTN tipe SFR dapat dimanfaatkan secara optimal pada tahun 2015, sedangkan PLTN tipe VHTR pada tahun 2020, PLTN tipe GFR, LFR, MSR, dan SCWR masing-masing pada tahun 2025. Pemanfaatan PLTN Generasi IV dikatakan optimal apabila PLTN tersebut sudah memenuhi tujuan PLTN Generasi IV, diantaranya mampu menghasilkan energi berkelanjutan, dan mempromosikan ketersediaan jangka panjang bahan bakar nuklir, mampu meminimalkan limbah nuklir dan mengurangi beban pengelolaan jangka panjang, memiliki keunggulan dalam bidang keselamatan dan keandalan dibanding PLTN generasi sebelumnya, dan teknologi VHTR mempunyai prospek yang baik digunakan di Indonesia.Kata kunci: status, perkembangan, PLTN, Generasi IV ABSTRACTCURRENT STATUS OF NPP GENERATION IV. Today development of nuclear technology has reached the stage of research and development of Generation IV nuclear power plants (advanced reactor systems) which is an innovative development from the previous generation of nuclear power plants. There are six types of power generation IV reactors, namely: Very High Temperature Reactor (VHTR), Sodium-cooled Fast Reactor (SFR), Gas-cooled Fast Reactor (GFR), Lead-cooled Fast Reactor (LFR), Molten Salt Reactor (MSR), and Super Critical Water-cooled Reactor (SCWR). The purpose of this study is to know the development of Generation IV nuclear power plants that have been done by the thirteen countries that are members of the Gen IV International Forum (GIF). The method used is review study and refers to various studies related to the current status of research and development of generation IV nuclear power. The result of this study showed that the systems and technology on Generation IV nuclear power plants offer significant advances in sustainability, safety and reliability, economics, and proliferation resistance and physical protection. In addition, based on the research and development experience is estimated that: SFR can be used optimally in 2015, VHTR in 2020, while NPP types GFR, LFR, MSR, and SCWR in 2025. Utilization of NPP generation IV said to be optimal if fulfill the goal of NPP generation IV, such as: capable to generate energy sustainably and promote long-term availability of nuclear fuel, minimize nuclear waste and reduce the long term stewardship burden, has an advantage in the field of safety and reliability compared to the previous generation of NPP and VHTR technology have a good prospects in Indonesia.Keywords: status, development, nuclear power plants (NPP), Generation IV
PENENTUAN JARAK PLTN DENGAN SUMUR MINYAK UNTUK ENHANCED OIL RECOVERY (EOR) DITINJAU DARI ASPEK KEHILANGAN PANAS DAN KESELAMATAN Erlan Dewita; Dedy Priambodo; Sudi Ariyanto
Jurnal Pengembangan Energi Nuklir Vol 15, No 2 (2013): Desember 2013
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2013.15.2.1500

Abstract

ABSTRAKPENENTUAN JARAK PLTN DENGAN SUMUR MINYAK UNTUK ENHANCED OIL RECOVERY (EOR) DITINJAU DARI ASPEK KEHILANGAN PANAS DAN KESELAMATAN. EOR merupakan teknik untuk peningkatan perolehan minyak bumi dengan cara menginjeksikan material atau bahan lain ke dalam sumur minyak. Terdapat 3 teknik EOR yang sudah digunakan di dunia, yaitu Thermal Injection, Chemical Injection dan Miscible. Metode termal merupakan metode yang paling banyak digunakan di dunia, namun salah satu kelemahannya adalah kehilangan panas selama distribusi kukus ke sumur injeksi. Di Indonesia, penerapan EOR telah sukses dilakukan di lapangan duri, Riau menggunakan teknik injeksi uap, namun masih menggunakan minyak bumi sebagai bahan bakar untuk produksi uap. Untuk menghemat cadangan minyak bumi, dilakukan introduksi Pembangkit Listrik Tenaga Nuklir (PLTN) kogenerasi untuk memasok sebagian panas PLTN untuk proses EOR. Pada PLTN kogenerasi, aspek keselamatan menjadi prioritas utama. Tujuan studi adalah untuk mengevaluasi jarak PLTN dengan sumur minyak dengan mempertimbangkan kehilangan panas dan aspek keselamatan. Metode yang dilakukan kajian dan perhitungan menggunakan program Cycle Tempo. Hasil studi menunjukkan bahwa jarak 400 meter yang merupakan asumsi untuk exclusion zone reaktor Pebble Bed Modular Reactor (PBMR), dengan ketebalan isolasi pipa 1 in, maka kehilangan panas 277, 883 kw, sedangkan apabila digunakan ketebalan isolasi pipa 2 in, kehilangan panas menjadi 162,634 kw dan dengan ketebalan isolasi pipa 3 in, kehilangan panas menjadi 120,767 kw. Kehilangan panas dapat diatasi memberikan isolator pipa dan memperbaiki kualitas kukus dari saturated menjadi superheated.Kata Kunci: EOR, kogenerasi, sumur minyak, PLTN, uap, fluida, daerah eksklusi ABSTRACTDISTANCE DETERMINATION OF NPP AND OIL RESERVOIR ON ENHANCED OIL RECOVERY BASED ON HEAT LOSS AND SAFETY IN VIEW POINT. EOR is a method used to increasing oil recovery by injecting material or other to the reservoir. There are 3 EOR technique have been used in the world, namely thermal injection, chemical injection dan Miscible. Thermal injection method is the method most widely used in the world, however, one drawback is the loss of heat during steam distribution to the injection wells. In Indonesia, EOR application has been successfully done in the field of Duri, Chevron uses steam injection method, but still use petroleum as a fuel for steam production. In order to save oil reserves, it was done the introduction of co-generation nuclear power plants to supply some of the heat of nuclear power plants for EOR processes. In cogeneration nuclear power plant, the safety aspect is main priority. The purpose of the study was to evaluate the distance NPP with oil wells by considering heat loss and safety aspects. The method of study and calculations done using Tempo Cycle program. The study results showed that in the distance of 400 meter as exclusion zone of PBMR reactor, with pipe insulation thickness 1 in, the amount of heat loss of 277, 883 kw, while in pipe isolation thickness 2 in, amount of heat loss became 162,634 kw and with isolation thickness 3 in, amount of heat loss 120,767 kw., heat loss can be overcome and provide insulation pipes and improve the quality of saturated steam into superheated.Keywords: EOR, cogeneration, oil reservoir, NPP, steam, fluid, Exclusion Zone
PEMETAAN DAN PENYIAPAN SDM TAHAP PENGOPERASIAN DAN PERAWATAN PLTN DI INDONESIA Moch. Djoko Birmano; Yohanes Dwi Anggoro
Jurnal Pengembangan Energi Nuklir Vol 15, No 2 (2013): Desember 2013
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2013.15.2.1495

Abstract

ABSTRAKPEMETAAN DAN PENYIAPAN SDM TAHAP PENGOPERASIAN DAN PERAWATAN PLTN DI INDONESIA. Penyiapan sumber daya manusia (SDM) yang kompeten merupakan salah satu infrastruktur dasar pembangunan PLTN. IAEA merekomendasikan bahwa pada kegiatan awal penyiapan SDM PLTN adalah melakukan Pemetaan Proses Bisnis (Business Process Mapping) dengan mengidentifikasi pengetahuan, keterampilan dan kemampuan SDM yang dibutuhkan untuk melaksanakan operasi dan perawatan PLTN. Tujuan studi adalah memetakan dan menyiapkan SDM di BATAN untuk tahap pengoperasian dan perawatan PLTN di Indonesia. Metode yang digunakan adalah memetakan proses bisnis pada tahap pengoperasian dan perawatan PLTN, melakukan identifikasi jabatan, melakukan survei dengan kuesioner dan perhitungan, dan analisis data. Survei dan pengisian kuesioner untuk mengetahui tingkat kompetensi teknis personil di BATAN pada tahap pengoperasian dan perawatan PLTN. Analisis menggunakan Metode Analisis Kesenjangan (Gap Analysis Methods) dengan Kriteria Standar Kompetensi SDM yang didasarkan pada kualifikasi kompetensi teknis. Studi ini menggunakan asumsi bahwa PLTN yang akan dibangun sebanyak 2 unit (twin) dan mulai beroperasi pada tahun 2027. Hasil penelitian menunjukkan bahwa dari aspek pendidikan, BATAN mampu memenuhi kebutuhan SDM sebesar 53,64 % hingga 73,75 %. Sedangkan dari aspek pelatihan dan pengalaman kerja khusus, tingkat partisipasi SDM BATAN masih sangat rendah dari yang dipersyaratkan oleh IAEA. Hal ini diakibatkan SDM muda di BATAN yang memiliki kualifikasi pendidikan, pengalaman, pelatihan dan sertifikasi teknis di bidang operasi dan perawatan PLTN masih terbatas. Berdasarkan hal ini, perlu adanya penyiapan SDM PLTN dengan menyusun program kegiatan pengembangan SDM PLTN berdasarkan kualifikasi yang dipersyaratkan. Kata Kunci: SDM, PLTN, analisis kesenjangan ABSTRACTTHE MAPPING AND PREPARATION OF HUMAN RESOURCES FOR NPP’S OPERATION AND MAINTENANCE IN INDONESIA. The preparation of the competent human resources (HRs) is one of the basic infrastructure of NPP’s development. IAEA recommends that at the initial activity in preparation of human resources for NPP is doing Business Process Mapping by identifying the knowledge, skills and abilities of required human resources to carry out the operation and maintenance of NPPs. This study aims to mapping and preparing of human resources for NPP’s operation and maintenance in Indonesia. The method used are mapping business processes at operation and maintenance stage of NPP, identifying positions, conducting surveys with questionnaires and calculations, and data analysis. Surveys and questionnaires to determine the level of technical competence of personnel in BATAN at operation and maintenance stage. Analysis using the Method of Gap Analysis with human resources Competency Standards Criteria based on technical competence qualifications. This study uses the assumption that the nuclear power plant will be built 2 units (twin) and start operation in 2027. The results showed that from the aspect of education, BATAN able to meet the needs of human resources at 53.64 to 73.75%. While from the aspect of training and specific work experience, participation level of BATAN’s human resources is still very low of IAEA requirements. This case caused because young human resources in BATAN who have educational qualifications, experience, training and technical certifications in the field of operation and maintenance of nuclear power plants is still limited. Based on this, there should be preparation of NPP’s human resources with establish NPP’s human resources development program based on required qualifications.Keywords: Human resources, NPP, gap analysis
RANCANGAN KONSEPTUAL REAKTOR SUBKRITIK UNTUK KAJIAN TRANSMUTASI LIMBAH PLTN BERBASIS REAKTOR KARTINI Syarip Syarip; Tegas Sutondo; Edi Triyono BS
Jurnal Pengembangan Energi Nuklir Vol 15, No 2 (2013): Desember 2013
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2013.15.2.1501

Abstract

ABSTRAKRANCANGAN KONSEPTUAL REAKTOR SUBKRITIK UNTUK KAJIAN TRANSMUTASI LIMBAH PLTN BERBASIS REAKTOR KARTINI. Disajikan hasil rancangan konseptual berupa kajian perhitungan aspek teoretis dan analisis kelayakan teknis suatu sistem reaktor subkritik dengan sumber neutron luar berasal dari akselerator (Small Scale Reactor Accelerator Driven System / SS-RADS) berbasis reaktor Kartini. Model teras reaktor berbentuk silinder berisi aktinida minor (MA) yang dikelilingi oleh bahan bakar reaktor Kartini. Modul ADS-CDS yang berbasis pada program SRAC digunakan untuk kajian aspek neutronik. Hasil perhitungan menunjukkan bahwa keberadaan unsur MA akan memberikan reaktivitas positif yang nilainya semakin besar dengan meningkatnya konsentrasi MA. Program komputer ORIGEN2 digunakan untuk perhitungan transmutasi radioinuklida MA sebagai fungsi energi dan fluks neutron. Hasil analisis menunjukkan bahwa transmutasi radionuklida MA tersebut akan berlangsung lebih optimum dengan neutron termal dibandingkan dengan neutron cepat. Unsur MA yang paling banyak mengalami transmutasi adalah Am241 yaitu dengan laju transmutasi 50% selama 1000 hari operasi pada tingkat fluks neutron termal 1013 n/cm2 s, dan yang paling sedikit mengalami transmutasi adalah Cm244 yaitu hanya 0,5%, serta laju transmutasi rerata total 32%. Dapat disimpulkan bahwa SS-RADS berbasis reaktor Kartini dapat digunakan untuk eksperimen transmutasi limbah nuklir (MA) jika tingkat fluks neutron termalnya 1013 n/cm2 s.Kata kunci: PLTN, reaktor subkritik, limbah nuklir, aktinida minor ABSTRACTCONCEPTUAL DESIGN OF SUBCRITICAL ASSEMBLY FOR NPP NUCLEAR WASTE TRANSMUTATION STUDY BASED ON KARTINI REACTOR. The conceptual design theoretical study and technical feasibility analysis results of subcritical assembly (Small Scale Reactor Accelerator Driven System /SS-RADS) based on Kartini reactor is presented in this paper. The reactor core model is a cylindrical containing minor actinide (MA) surrounded by Kartini reactor fuels. ADS-CDS module based on SRAC code was used to study neutronic aspect. Calculation results show that the present of MA as nuclear waste will provide positive reactivity value and will increasing according to its concentration. The ORIGEN2 computer code was used to calculate MA transmutation as a function of neutron energy and flux. The analysis results show that the optimum waste transmutation of the above radionuclide will achieved with thermal neutron (thermal reactor), instead of fast neutron. The most transmuted element is Am241 with 50% transmutation rate at thermal neutron flux of 1013 n/cm2 s, the lowest transmuted is Cm244 i.e. only 0,5%, and total average transmutation is 32%. It can be concluded that the SS-RADS based on Kartini reactor can be used for nuclear waste transmutation study if the thermal neutron flux level is around 1013 n/cm2 s.Keywords: nuclear power plants, subcritical reactor, nuclear waste, minor actinide
Hal Muka JPEN 2013 Volume 15 Nomor 2 Desember Hal Muka
Jurnal Pengembangan Energi Nuklir Vol 15, No 2 (2013): Desember 2013
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2013.15.2.3431

Abstract

RANTAI PASOK INDUSTRI KONSTRUKSI SIPIL UNTUK MENDUKUNG PEMBANGUNAN PLTN DI INDONESIA Dharu Dewi; Sriyana Sriyana; Moch. Djoko Birmano; Sahala Maruli Lumbanraja; Nurlaila Nurlaila
Jurnal Pengembangan Energi Nuklir Vol 15, No 2 (2013): Desember 2013
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2013.15.2.1497

Abstract

ABSTRAKRANTAI PASOK INDUSTRI KONSTRUKSI SIPIL UNTUK MENDUKUNG PEMBANGUNAN PLTN DI INDONESIA. Penggunaan produk dalam negeri untuk pembangunan infrastruktur ketenagalistrikan telah diatur dalam Peraturan Menteri Perindustrian nomor: 54/M-IND/PER/3/2012, tetapi infrastruktur pembangunan pembangkit listrik tenaga nuklir (PLTN) belum tercakup di dalamnya. Oleh karena itu, potensi industri dalam negeri perlu dipetakan khususnya rantai pasok industri konstruksi sipil untuk memperkirakan kemampuan tingkat komponen dalam negeri (TKDN) pada proyek pembangunan PLTN di Indonesia. PLTN merupakan teknologi tinggi sehingga jika PLTN akan dibangun maka perlu melibatkan kemampuan industri nasional sebagai media alih teknologi, terutama untuk jasa EPC (Engineering, Procurement and Construction). Konstruksi sipil (civil part) dalam PLTN memegang peran yang cukup besar, yakni sekitar 21%. Oleh karena itu perlu peran industri nasional khususnya konstruksi sipil untuk meningkatkan kemampuan kandungan lokal. Kesiapan infrastruktur konstruksi sipil sangat bergantung pada rantai pasok bahan baku. Tujuan penelitian adalah memetakan industri konstruksi sipil dan rantai pasok industri konstruksi sipil. Metodologi penelitian ini adalah kajian literatur dan survei data industri nasional. Hasil penelitian diperoleh gambar peta industri konstruksi sipil dengan mata rantai pasok bahan baku.Kata kunci: konstruksi sipil, pembangunan PLTN, rantai pasok ABSTRACTTHE SUPPLY CHAIN OF CIVIL CONSTRUCTION INDUSTRIES FOR SUPPORT THE NUCLEAR POWER PLANT CONSTRUCTION IN INDONESIA. The use of domestic products for electricity infrastructure has been set out in the Ministerial Decree number: 54/M-IND/PER/3/2012, but the infrastructure of nuclear power plants (NPP) construction has not been included. Therefore, the potential of the local industries needs to be mapped it especially supply chain of civil construction industries to estimate the capability of the local component level (DCL) at the nuclear power plant project in Indonesia. NPP is a high-technology so that if NPP will be constructed, it is necessary to involve the national capability as media technology transfer, especially for EPC (Engineering, Procurement and Construction) services. Civil construction (civil part) play role is very large, about 21%. Therefore it is necessary in particular the role of the national civil construction industry to increase the capability of local content. Preparation of Civil construction infrastructure are depend on the supply chain of raw materials. The aim of the research was to map the supply chain of the civil construction industries. Methodology this study is a survey of national industries, literature review, and searching website. The result study is a map of civil construction industries with raw material supply chain.Keywords: civil construction, Nuclear Power Plant, supply chain
Hal Belakang JPEN 2013 Volume 15 Nomor 2 Desember Hal Belakang
Jurnal Pengembangan Energi Nuklir Vol 15, No 2 (2013): Desember 2013
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2013.15.2.3432

Abstract

KAJIAN ASPEK GEOLOGI DAN POTENSI MINERAL URANIUM DI KALIMANTAN BARAT UNTUK PERSIAPAN PLTN Hadi Suntoko; Bambang Soetopo
Jurnal Pengembangan Energi Nuklir Vol 15, No 2 (2013): Desember 2013
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2013.15.2.1498

Abstract

ABSTRAKKAJIAN ASPEK GEOLOGI dan POTENSI MINERAL URANIUM DI KALIMANTAN BARAT UNTUK PERSIAPAN PLTN. Telah dilakukan kajian aspek geologi di wilayah pantai Kalimantan Barat yang merupakan dataran rendah, sebagian tersusun oleh batuan granit berumur Miosen sampai Kapur, dan tidak dilalui oleh patahan aktif. Tersingkapnya batuan granit dan metamorf di Kalan, Kecamatan Ella Ilir berumur Pra Tersier mengindikasikan adanya potensi mineral uranium berkisar antara 150–5.000c/s yang didominasi pada batuan metalanau dan metatuf berupa sisipan (urat) yang membentang dari arah timurlaut-baratdaya (NE-SW). Tujuan kajian adalah mendapatkan daerah-daerah yang tersusun dari batuan berumur tua dan tidak dilalui oleh patahan serta mengenali potensi kandungan uranium. Metode yang digunakan adalah analisis data sekunder terutama aspek geologi yang berasal dari publikasi peneliti dan konfirmasi lapangan. Konfirmasi memberikan informasi kandungan mineral uranium dikontrol pola tektonik yang mengisi bidang fraktur berupa sekistositas maupun breksiasi dengan ketebalan sentimeter-milimeter. Hasil kajian menunjukkan bahwa wilayah pantai Kalimantan Barat meliputi Kabupaten Pontianak, Kubu Raya, Kayong Utara, dan Ketapang merupakan daerah yang direkomendasikan menjadi tapak PLTN karena termasuk dalam wilayah batuan tua dan tidak dilalui oleh patahan, sedangkan Kalan, Kabupaten Melawi memiliki potensi mineral uranium pada mineral kalsit, gypsum dan kuarsa dengan ratio Th/U <1 dan cukup baik untuk persiapan bahan bakar PLTN di masa mendatang.Kata kunci: Aspek geologi, Mineral Uranium, PLTN ABSTRACTSTUDY OF GEOLOGY ASPECTS AND MINERALS URANIUM POTENTIAL AT WEST KALIMANTAN IN ORDER TO NPP PREPARATION. It have performed of geological aspects of the study in the coastal region of West Kalimantan which it is lowland, mostly composed by granite rocks its aged of Miocene to Cretaceous , and not traversed by active faults. Uncovering of granite rocks and metemorf in Kalan of Ella Ilir distric it aged pre - terseier old and indicate of potential uranium minerals ranged from 150-5.000c/s that dominated of the rock metalanau and metatuf form inserts (veins) which stretched from the northeast - southwest (NE-SW). The purpose was to get the area composed of old rocks its not traversed by fault in West Kalimantan and recognize the potential of uranium content. The method used to analysis of the secondary data from publications research and confirm data of the geological survey. The confirm give the inform a content of uranium minerals to be controlled by tectonic activities and its fill the field of fracture and brecciation with a thickness sekistositas milimetric- centimetrik. The results of the study showed that coastal region includes the District of West Kalimantan Pontianak, Kubu Raya, North Kayong, and Ketapang are recommended areas into nuclear power plant site as including in the area of old rocks and not traversed by fault. Kalan District Melawi regency has potential uranium minerals in the mineral calcite, gypsum and quartz with a ratio of Th/U < 1 and is good enough for the preparation of nuclear fuel in the future.Keywords: Geology Aspects , Uranium Mineral, NPP

Page 1 of 1 | Total Record : 9


Filter by Year

2013 2013


Filter By Issues
All Issue Vol 23, No 2 (2021): Desember 2021 Vol 23, No 1 (2021): Juni 2021 Vol 22, No 2 (2020): Desember 2020 Vol 22, No 1 (2020): Juni 2020 Vol 21, No 2 (2019): Desember 2019 Vol 21, No 1 (2019): Juni 2019 Vol 20, No 2 (2018): Desember 2018 Vol 20, No 1 (2018): Juni 2018 Vol 19, No 2 (2017): Desember 2017 Vol 19, No 1 (2017): Juni 2017 Vol 18, No 2 (2016): Desember 2016 Vol 18, No 1 (2016): Juni 2016 Vol 17, No 2 (2015): Desember 2015 Vol 17, No 1 (2015): Juni 2015 Vol 16, No 2 (2014): Desember 2014 Vol 16, No 1 (2014): Juni 2014 Vol 15, No 2 (2013): Desember 2013 Vol 15, No 1 (2013): Juni 2013 Vol 14, No 2 (2012): Desember 2012 Vol 14, No 1 (2012): Juni 2012 Vol 13, No 2 (2011): Desember 2011 Vol 13, No 1 (2011): Juni 2011 Vol 12, No 2 (2010): Desember 2010 Vol 12, No 1 (2010): Juni 2010 Vol 11, No 2 (2009): Desember 2009 Vol 11, No 1 (2009): Juni 2009 Vol 10, No 2 (2008): Desember 2008 Vol 10, No 1 (2008): Juni 2008 Vol 9, No 2 (2007): Desember 2007 Vol 9, No 1 (2007): Juni 2007 Vol 8, No 2 (2006): Desember 2006 Vol 8, No 1 (2006): Juni 2006 Vol 7, No 2 (2005): Desember 2005 Vol 7, No 1 (2005): Juni 2005 Vol 6, No 2 (2004): Desember 2004 Vol 6, No 1 (2004): Juni 2004 Vol 5, No 2 (2003): Desember 2003 Vol 5, No 1 (2003): Juni 2003 Vol 4, No 2 (2002): Desember 2002 Vol 4, No 1 (2002): Juni 2002 Vol 3, No 2 (2001): Desember 2001 Vol 2, No 4 (2000): Desember 2000 Vol 2, No 3 (2000): September 2000 Vol 2, No 2 (2000): Juni 2000 Vol 2, No 1 (2000): Maret 2000 Vol 1, No 4 (1999): Desember 1999 Vol 1, No 3 (1999): September 1999 Vol 1, No 1 (1999): Maret 1999 More Issue