cover
Contact Name
Nur Hasanah
Contact Email
nur.hasanah@batan.go.id
Phone
+6221-5204243
Journal Mail Official
jpen@batan.go.id
Editorial Address
Kawasan Kantor Pusat Badan Tenaga Nuklir Nasional Jl. Kuningan Barat, Mampang Prapatan, Jakarta 12710 Kotak Pos 4390 Jakarta 12043
Location
Kota adm. jakarta selatan,
Dki jakarta
INDONESIA
Jurnal Pengembangan Energi Nuklir
ISSN : 14109816     EISSN : 25029479     DOI : https://doi.org/10.17146/jpen
Jurnal Pengembangan Energi Nuklir publishes scientific papers on the results of studies and research on nuclear energy development with the scope of energy and electricity planning, nuclear energy technology, energy economics, management of nuclear power plants, national industries that support nuclear power plants, aspects of the nuclear power plant site and environment, and topics others that support the development of nuclear energy.
Articles 9 Documents
Search results for , issue "Vol 16, No 2 (2014): Desember 2014" : 9 Documents clear
STUDI KOMPARASI MODEL PERHITUNGAN BIAYA PEMBANGKITAN LISTRIK TERARAS PLTN Nuryanti Nuryanti; Mochamad Nasrullah; Suparman Suparman
Jurnal Pengembangan Energi Nuklir Vol 16, No 2 (2014): Desember 2014
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2014.16.2.2535

Abstract

ABSTRAKSTUDI KOMPARASI MODEL PERHITUNGAN BIAYA PEMBANGKITAN LISTRIK TERARAS PLTN. Analisis keekonomian yang umumnya dilakukan melalui perhitungan Levelized Unit Electricity Cost (LUEC) merupakan hal yang krusial untuk dilakukan sebelum diambilnya keputusan investasi pada proyek PLTN. Terdapat beberapa model yang dapat digunakan untuk menghitung LUEC, diantaranya adalah: Model Puslitbang PT. PLN (Persero), model Mini G4ECONS dan Model Levelized Cost. Tujuan studi adalah untuk melakukan komparasi diantara ketiga model tersebut. Teknik komparasi dilakukan dengan penelusuran formula yang digunakan oleh masing-masing model dan selanjutnya diberikan contoh perhitungan LUEC PLTN SMR 2 x 100 MW menggunakan ketiga model tersebut. Hasil penelitian menunjukkan bahwa model Puslitbang PT. PLN (Persero) mempunyai kesamaan prinsip dengan model Mini G4ECONS, yaitu menggunakan Capital Recovery Factor (CRF) untuk mendiskonto biaya investasi menjadi nilai anuitas selama umur pembangkit. LUEC pada kedua model dihitung dengan membagi hasil jumlahan biaya investasi tahunan dan biaya pengoperasian PLTN dengan produksi listrik tahunan. Sedangkan model Levelized Cost berbasis pada arus kas tahunan. Total biaya tahunan maupun produksi listrik tahunan semuanya ditarik ke tahun awal konstruksi sehingga diperoleh total biaya tahunan terdiskonto dan total produksi energi tahunan terdiskonto. LUEC diperoleh dengan membagi kedua nilai terdiskonto tersebut. Perhitungan LUEC pada ketiga model menghasilkan nilai LUEC sebesar: 14,5942 cents US$/kWh pada model Puslitbang PT. PLN (Persero), 15,056 cents US$/kWh pada model Mini G4ECONS dan 14,240 cents US$/kWh pada model Levelized Cost.Kata kunci: komparasi, model perhitungan LUEC, PLTNABSTRACTCOMPARISON STUDY ON MODELS FOR CALCULATION OF NPP’s LEVELIZED UNIT ELECTRICITY COST. Economic analysis that is generally done through the calculation of Levelized Unit Electricity Cost (LUEC) is crucial to be done prior to any investment decision on the nuclear power plant (NPP) project. There are several models that can be used to calculate LUEC, which are: R&D PT. PLN (Persero) Model, Mini G4ECONS model and Levelized Cost model. This study aimed to perform a comparison between the three models. Comparison technique was  done by tracking the persamaan used for each model and then given a case of LUEC calculation for SMR NPP 2 x 100 MW using these models. The result showed that the R&D PT. PLN (Persero) Model have a common principle with Mini G4ECONS model, which use Capital Recovery Factor (CRF) to discount the investment cost which eventually become  annuity value along the life of plant. LUEC on both models is calculated by dividing the sum of the annual investment cost and the cost for operating NPP with an annual electricity production.While Levelized Cost model based on the annual cash flow. Total of annual costs and annual electricity production were discounted to the first year of construction in order to obtain the total discounted annual cost and the total discounted energy generation. LUEC was obtained by dividing both of the discounted values. LUEC calculations on the three models produce LUEC value, which are: 14.5942 cents US$/kWh for R&D PT. PLN (Persero) Model, 15.056 cents US$/kWh for Mini G4ECONs model and 14.240 cents US$/kWh for Levelized Cost model.Keywords: comparison, LUEC calculation models, NPP
PERBANDINGAN HARGA ENERGI DARI SUMBER ENERGI BARU TERBARUKAN DAN FOSIL Edwaren Liun; Sunardi Sunardi
Jurnal Pengembangan Energi Nuklir Vol 16, No 2 (2014): Desember 2014
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2014.16.2.2521

Abstract

ABSTRAK PERBANDINGAN HARGA ENERGI DARI SUMBER ENERGI BARU TERBARUKAN DAN FOSIL. Transportasi biaya rendah untuk orang dan barang sangat penting untuk kesejahteraan ekonomi bangsa. Hingga kini jika harga minyak naik, biaya transportasi otomatis akan mengikuti dan sebagian rakyat menderita akibat melambungnya harga makanan dan barang-barang lainnya. Hampir 100 persen kebutuhan energi transportasi negara Indonesia didukung oleh minyak. Sementara biaya di sektor energi terutama listrik, di negara maju yang juga berperan signifikan untuk mendukung transportasi, jauh lebih stabil dan dapat diprediksi. Kebutuhan energi yang begitu tinggi di sektor transportasi cenderung memaksa manusia untuk mengupayakan sumber dan sarana energi dalam bentuk  lain seperti listrik atau hydrogen yang dapat menyamai atau melebihi kinerja bahan bakar minyak. Makalah ini bertujuan untuk menganalisis perbandingan keekonomian harga energi dari sumber EBT dan fosil untuk melihat sejauh mana peluang keekonomian beberapa jenis energi dapat memainkan peran signifikan di sektor transportasi dan dampak selanjutnya di dalam sistem energi. Metodologi yang digunakan adalah penelusuran pustaka dan perhitungan langsung pada bahan atau sumber energi terkait. Dari hasil analisis diperoleh bahwa akan semakin dibutuhkan peran energi nuklir dan energi tertentu lainnya sebagai sumber energi listrik menimbang aspek keekonomiannya yang relatif lebih baik. Kata kunci: perbandingan, harga energi, bahan bakar, transportasi   ABSTRACT ENERGY PRICE COMPARISON OF NEW, RENEWABLE AND FOSSIL ENERGY SOURCES. Low cost transportation for people and goods is essential to the economic well-being of the nation. Until now, if the oil prices rise, the cost of transportation will automatically follow and most of the people suffering due to soaring prices of food and other items. Almost 100 percent of Indonesian transportation energy demand is supported by oil. Supply disruption - or even the threat of disruption - in the Middle East or elsewhere may lead to a shift in consumer prices and the cost of the industry in significant numbers. While costs in the energy sector, especially electricity in developed countries that also contribute significantly to support the transport sector, is much more stable and predictable. Energy requirements are so high in the transport sector tends to force people to seek the source and means of energy in other forms such as electricity or hydrogen that can match or exceed the performance of fuel oil. This paper aims to analyze the economics of energy price comparison to see the extent of the economic opportunities some kind of energy to play a significant role in the transport sector and the subsequent impact on the energy system. From the results obtained by the analysis that will be increasingly necessary role of nuclear energy and other specific energy as a source of electrical energy considering its economical aspects are relatively better. Keywords: comparison, price of energy, fuel, transportation
PENENTUAN TAPAK POTENSIAL PLTN DENGAN METODE SIG DI WILAYAH PESISIR PROPINSI KALIMANTAN BARAT Heni Susiati
Jurnal Pengembangan Energi Nuklir Vol 16, No 2 (2014): Desember 2014
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2014.16.2.2502

Abstract

ABSTRAK PENENTUAN TAPAK POTENSIAL PLTN DENGAN METODE SIG DI WILAYAH PESISIR PROPINSI KALIMANTAN BARAT. Dalam pemilihan tapak PLTN, IAEA (Safety Guide NS-R-3) dan BAPETEN (Perka BAPETEN No. 5 tahun 2007) telah mengeluarkan pedoman yang berhubungan tentang evaluasi tapak untuk mendapatkan tapak PLTN yang aman dan menjamin keselamatan. Untuk mempersiapkan program PLTN di Kalimantan Barat, BATAN telah melakukan penelitian di sepanjang pesisir Kabupaten Ketapang dan Kayong Utara, Kalimantan Barat untuk mendapatkan tapak terpilih. Tujuan penelitian adalah untuk mendapatkan tapak potensial PLTN di wilayah pesisir kabupaten Ketapang dan Kayong Utara berdasarkan kriteria pembobotan dan pemodelan spasial dan SIG. Penentuan tapak potensial didasarkan pada beberapa kriteria, yaitu: kemiringan lereng, litologi, geologi, topografi, curah hujan, kerawanan bencana, jarak ke badan air, posisi daerah pemukiman, tataguna lahan, lahan gambut, hidrogeologi, dll. Berdasar hasil pembobotan dan skoring diperoleh 4 lokasi yang sesuai untuk dijadikan sebagai tapak potensial PLTN, diantaranya berada di wilayah pesisir yang terdapat di kecamatan Sukadana, Kendawangan, Matan Hilir Utara dan Matan Hilir Selatan. Kata kunci: tapak, potensial, PLTN, SIG.   ABSTRACT DETERMINATION OF POTENTIAL NPP SITE WITH GIS IN THE COASTAL PROVINCES WEST KALIMANTAN. In a NPP site selection, IAEA (IAEA Safety Guide NS-R-3) and BAPETEN (Perka BAPETEN No. 5, 2007) has published guidance link of site evaluation forNPP site for ensuring program preparation safety of NPP that will built. NPP's in West Kalimantan, BATAN has conducted research throughout Ketapang and Kayong Utara coastal, West Kalimantan to get selected site. The aim of research is to get the potential site of NPP's plants in coastal areas Ketapang and Kayong Utara base criteria on weighting, spatial modeling and GIS. Criteria for determination of potential site based on several criteria: slope, lithology, geology, topography, rainfall, disaster vulnerability, proximity to water bodies, the position of residential areas, land use, peat, hydrogeology, etc. The results obtained by weighting and scoring four suitable sites serve as a potential site for a NPP's , which was located in coastal areas in the district Sukadana Kendawangan Matan Matan Hilir Utara and Matan Hilir Selatan. Keywords: site, potentially, nuclear power plants, GIS.
STUDI POTENSI THORIUM PADA BATUAN GRANIT DI PULAU BANGKA Ngadenin Ngadenin; Heri Syaeful; Kurnia Setiawan Widana; I Gde Sukadana; Fd. Dian Indrastomo
Jurnal Pengembangan Energi Nuklir Vol 16, No 2 (2014): Desember 2014
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2014.16.2.2522

Abstract

ABSTRAK STUDI POTENSI THORIUM PADA BATUAN GRANIT DI PULAU BANGKA. Di Indonesia umumnya thorium dijumpai dalam batuan granit. Salahsatunya di pulau Bangka, terdapat cukup banyak singkapan batuan granit, seperti granit Menumbing, granit Pelangas, granit Jebus, granit Pemali, granit Mangol, granit Bebuluh dan granit Gadung. Penyebaran granit-granit tersebut cukup luas sehingga dianggap sebagai granit potensial thorium. Tujuan penelitian untuk mengetahui potensi thorium pada batuan granit yang terdapat di pulau Bangka. Metode yang digunakan adalah pengambilan sampel mineral berat dari batuan granit lapuk, selanjutnya dilakukan pengukuran dan analisis thorium di laboratorium menggunakan X-Ray Fluorescence. Batuan granit dianggap potensial thorium apabila mempunyai kadar thorium minimal tiga kali kadar thorium dalam granit normal (15 ppm) dan batuan granit telah mengalami pelapukan tingkat lanjut sehingga mudah untuk ditambang. Hasil studi menunjukkan bahwa kadar thorium pada granit Gadung 76 ppm, granit Bebuluh  23,33 ppm, granit Mangol 42 ppm, granit Pemali 35,40 ppm, granit Jebus 85,96 ppm, granit Pelangas 66,73 ppm dan granit Menumbing 67,03 ppm. Secara umum, kondisi fisik batuan granit di lapangan menunjukkan telah mengalami pelapukan tingkat lanjut. Batuan granit yang potensial thorium adalah granit Jebus, Menumbing, Pelangas dari Bangka Barat dan granit Gadung dari Bangka Selatan. Berdasarkan data Pulau Bangka layak dipertimbangkan dalam pengembangan eksplorasi thorium. Kata kunci: potensi, thorium, granit, Bangka   ABSTRACT STUDY ON THORIUM POTENTIAL IN GRANITE ROCK ON THE BANGKA ISLAND. In Indonesia generally thorium was found in granite rocks. On the island of Bangka there are quite a lot of granite out crops such as Menumbing granite, Pelangas granite, Jebus granite, Pemali granite, Mangol granite, Bebuluh granite and Gadung granite. The distribution of the granites is extensive enough to be considered as a granite potential thorium. The aim of study is to determine the potential of thorium in granitic rocks located on the Bangka Island. The method used is a heavy mineral sampling of weathered granite rocks, then performed the measurement and analysis of thorium in the laboratory using X-Ray Fluorescence. Granitic rocks are considered potential thorium if thorium content has at least three times the normal levels of thorium in granite (15 ppm) and it has experienced highly weathered so easy to be mined. Results of the study showed levels of thorium in Gadung granite is 76ppm, Bebuluh granite is 23.33ppm, Mangol granite is 42ppm, Pemali granite is 35.40ppm, Jebus granite is 85.96ppm, Pelangas granite is 66.73 ppm and Menumbing granite is 67.03ppm. The observation of the physical condition in the field show that in general all granites have undergone strongly weathered. It was concluded that the potential of thorium granitic rocks are Jebus granite, Menumbing granite, Pelangas granite contained in the West Bangka regency and Gadung granite in South Bangka regency. Based on the data, Bangka Island possible of consideration in the development of thorium exploration. Keywords: potential, thorium, granite, Bangka
Hal Muka JPEN 2014 Volume 16 Nomor 2 Desember Hal Muka
Jurnal Pengembangan Energi Nuklir Vol 16, No 2 (2014): Desember 2014
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2014.16.2.3236

Abstract

Hal Belakang JPEN 2014 Volume 16 Nomor 2 Desember Hal Belakang
Jurnal Pengembangan Energi Nuklir Vol 16, No 2 (2014): Desember 2014
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2014.16.2.3237

Abstract

ANALISIS SENSITIVITAS KETEBALAN REFLEKTOR GRAFIT TERAS RGTT200K MENGGUNAKAN PERHITUNGAN MONTE CARLO Suwoto Suwoto; Zuhair Zuhair
Jurnal Pengembangan Energi Nuklir Vol 16, No 2 (2014): Desember 2014
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2014.16.2.2498

Abstract

ABSTRAK ANALISIS SENSITIVITAS KETEBALAN REFLEKTOR GRAFIT TERAS RGTT200K MENGGUNAKAN PERHITUNGAN MONTE CARLO. Salah satu parameter desain reaktor pebble-bed yang sangat penting selain radius, pengayaan dan densitas bahan bakar adalah ketebalan reflektor. Reflektor aksial dan radial dalam reaktor temperatur tinggi digunakan untuk meningkatkan ekonomi neutron, namun dimensi reflektor harus diinvestigasi khususnya untuk teras pebble-bed dengan opsi bahan bakar yang berbeda. Makalah ini secara esensial bertujuan mencari tebal efektif reflektor aksial dan radial yang direkomendasikan untuk teras RGTT200K. Analisis ditekankan pada perilaku neutron dalam bahan bakar bola dimana partikel TRISO disusun dengan kisi SC dalam matriks grafit dan perilaku teras yang disusun oleh bahan bakar pebble dalam kisi BCC. Perhitungan teras dengan tiga opsi bahan bakar, yakni UO2, PuO2 dan ThO2/UO2 pada berbagai fraksi packing TRISO dikerjakan dengan program transport Monte Carlo MCNPX dan pustaka data tampang lintang energi neutron kontinu ENDF/B-VI. Hasil perhitungan memperlihatkan perubahan reaktivitas teras RGTT200K karena fraksi packing TRISO tidak secara langsung menyebabkan ketebalan reflektor radial bertambah. Penambahan ketebalan reflektor radial setelah mencapai 100 cm tidak memberikan perubahan yang berarti terhadap reaktivitas teras RGTT200K. Penambahan ketebalan reflektor aksial juga tidak mempunyai dampak yang berarti pada perubahan reaktivitas teras RGTT200K. Dari analisis dapat disimpulkan bahwa, tebal efektif reflektor radial dan aksial bagian atas dan bawah dicapai masing-masing pada ketebalan 100 cm. Kata kunci: RGTT200K, sensisitivitas, reflektor radial, reflektor aksial, MCNPX, ENDF/B-VI. ABSTRACT ANALYSIS ON THICKNESS SENSITIVITY OF GRAPHITE REFLECTOR FOR RGTT200K CORE USING MONTE CARLO CALCULATION. One of very important parameter in design of the pebble bed reactor beside radius, enrichment and density of fuel are reflector thickness. Axial and radial reflectors in high temperature reactor are used to improve the neutron economy, however the reflector dimension has to be investigated especially for pebble bed core with various fuel options. This paper essentially aimed to look for the thickness of radial and axial reflectors to obtain specific design recommended for RGTT200K core. The analysis focused on the neutron behavior in fuel pebble where TRISO particles arranged with SC lattice in the graphite matrix and the core behavior composed by the fuel pebble in the BCC lattice arrangement. The core calculation with three fuel options of UO2, PuO2 and ThO2/UO2 at various TRISO packing fractions were employed using MCNPX Monte Carlo transport code and continuous neutron energy cross-section ENDF/B-VI file. The calculation results show that, the RGTT200K core reactivity change because of TRISO packing fraction is not directly cause the increasing of radial reflector thickness. The adding of radial reflector thickness after achieving 100 cm does not give the effective effect on the RGTT200K core reactivity change. The increasing of axial reflector thickness has no significant impact on RGTT200K core reactivity change. From the analysis, it can be concluded that the effective thickness of radial reflector and top and bottom axial reflectors are achieved at a thickness of 100 cm. Keywords: RGTT200K, sensitivity, radial reflector, axial reflector, MCNPX, ENDF/B-VI.
APLIKASI KOGENERASI NUKLIR UNTUK DEKOMPOSISI AIR PADA KONVERSI CO2 MENJADI PUPUK UREA Djati Hoesen Salimy
Jurnal Pengembangan Energi Nuklir Vol 16, No 2 (2014): Desember 2014
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2014.16.2.2710

Abstract

APLIKASI KOGENERASI NUKLIR UNTUK DEKOMPOSISI AIR PADA KONVERSI CO2 MENJADI PUPUK UREA. Telah dilakukan studi aplikasi kogenerasi nuklir untuk dekomposisi air pada konversi CO2 menjadi pupuk urea. Metode yang digunakan adalah studi pustaka. Tujuan studi adalah menganalisis kemungkinan aplikasi kogenerasi nuklir untuk dekomposisi air pada konversi CO2 menjadi pupuk urea sebagai teknologi alternatif produksi pupuk urea. Hasil studi menunjukkan bahwa proses kogenerasi nuklir untuk dekomposisi air dimungkinkan untuk diaplikasikan guna mengkonversi CO2 menjadi pupuk urea. Metode ini tidak memerlukan lagi penggunaan gas alam sebagai bahan baku, sumber energi panas, kukus dan listrik. Produksi dengan kapasitas sebesar 1725 ton pupuk urea per hari, mampu menghemat gas alam sebesar 21,25 juta MMBTU per tahun yang setara dengan pengurangan laju emisi CO2 sebesar 1,24 juta ton per tahun. Selain itu dapat memanfaatkan emisi CO2 sebesar 596357 ton per tahun yang berasal dari PLTU batubara dengan daya sebesar 90 MWe, sebagai bahan baku untuk proses pembentukan urea. Pasokan energi panas, kukus dan listrik yang bersumber dari reaktor HTGR dengan daya 2×600 MWt dapat memenuhi kebutuhan proses produksi, dengan kelebihan listrik sebesar 140 MWe. Di samping produksi pupuk sebesar 1725 ton per hari, juga dihasilkan energi listrik tanpa emisi CO2 yang berasal dari PLTU baubara (90MWe) dan HTGR (140MWe) dengan total sebesar 230 MWe yang dapat disambungkan ke jaringan. Kata kunci: kogenerasi nuklir, dekomposisi air, konversi CO2, pupuk urea, emisi CO2
KAJIAN IMPLEMENTASI FLEXBLUE DI INDONESIA Sahala Maruli Lumbanraja
Jurnal Pengembangan Energi Nuklir Vol 16, No 2 (2014): Desember 2014
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2014.16.2.2519

Abstract

ABSTRAKKAJIAN IMPLEMENTASI FLEXBLUE DI INDONESIA. Flexblue merupakan reaktor modular berdaya kecil dan berpendingin air ringan. Tapak reaktor ini berada di dasar permukaan laut (off shore) dan ruang kendali utama berada di darat. Hull yang berisi komponen-komponen utama reaktor ditempatkan pada kedalaman 60-100 m di dasar permukaan laut sehingga sistem keselamatan dan keamanannya cukup tinggi. PLTN ini dikembangkan oleh DCNS-Perancis untuk memenuhi kebutuhan energi listrik dunia. Tujuan dari kajian ini adalah untuk mempelajari pra-kelayakan implementasi Flexblue di Indonesia ditinjau dari faktor teknologi,  kondisi laut dan regulasi. Metodologi yang digunakan adalah mempelajari berbagai pustaka tentang teknologi PLTN Flexblue, kondisi laut, dan sistem regulasi  di Indonesia. Pada kajian awal ini, lokasi tapak potensial terletak di pesisir pantai timur pulau Sumatra, pantai utara Jawa, pantai pulau Kalimantan, dan sekitar pesisir pulau-pulau yang berada di antara timur pulau Sumatera, utara Jawa dan Kalimantan, tetapi dari segi regulasi, teknologi ini tidak dapat diimplentasikan.Kata kunci: Flexblue, hull, off shore, tapak, regulasi ABSTRACT IMPLEMENTATION OF FLEXBLUE ASSESMENT IN INDONESIA. Flexblue is a small power modular reactors and light water cooled. The reactor site is located at the bottom of the sea surface (off shore) and main control room on the ground. Hull that contains the main components of the reactor is placed at a depth of 60-100 m in the bottom of the sea surface so that the safety and security system is quite high. NPP was developed by the DCNS-France to meet the electrical energy needs of the world. The purpose of this study was to study the pre-feasibility of implementation Flexblue in Indonesia in terms of technological factors, sea geographical conditions and regulatory. The methodology used is to study a variety of literature on NPP Flexblue technology, geographic conditions, and regulatory systems in Indonesia. In this study, location of potensial sites are on the east coast of the island of Sumatra, Java's northern coast, the coast of the island of Borneo, and surrounding coastal islands located between the east of the island of Sumatra, northern Java and Borneo, but in terms of regulation, this technology can not implemented. Keywords: Flexblue, hull, off shore, site, regulations

Page 1 of 1 | Total Record : 9


Filter by Year

2014 2014


Filter By Issues
All Issue Vol 23, No 2 (2021): Desember 2021 Vol 23, No 1 (2021): Juni 2021 Vol 22, No 2 (2020): Desember 2020 Vol 22, No 1 (2020): Juni 2020 Vol 21, No 2 (2019): Desember 2019 Vol 21, No 1 (2019): Juni 2019 Vol 20, No 2 (2018): Desember 2018 Vol 20, No 1 (2018): Juni 2018 Vol 19, No 2 (2017): Desember 2017 Vol 19, No 1 (2017): Juni 2017 Vol 18, No 2 (2016): Desember 2016 Vol 18, No 1 (2016): Juni 2016 Vol 17, No 2 (2015): Desember 2015 Vol 17, No 1 (2015): Juni 2015 Vol 16, No 2 (2014): Desember 2014 Vol 16, No 1 (2014): Juni 2014 Vol 15, No 2 (2013): Desember 2013 Vol 15, No 1 (2013): Juni 2013 Vol 14, No 2 (2012): Desember 2012 Vol 14, No 1 (2012): Juni 2012 Vol 13, No 2 (2011): Desember 2011 Vol 13, No 1 (2011): Juni 2011 Vol 12, No 2 (2010): Desember 2010 Vol 12, No 1 (2010): Juni 2010 Vol 11, No 2 (2009): Desember 2009 Vol 11, No 1 (2009): Juni 2009 Vol 10, No 2 (2008): Desember 2008 Vol 10, No 1 (2008): Juni 2008 Vol 9, No 2 (2007): Desember 2007 Vol 9, No 1 (2007): Juni 2007 Vol 8, No 2 (2006): Desember 2006 Vol 8, No 1 (2006): Juni 2006 Vol 7, No 2 (2005): Desember 2005 Vol 7, No 1 (2005): Juni 2005 Vol 6, No 2 (2004): Desember 2004 Vol 6, No 1 (2004): Juni 2004 Vol 5, No 2 (2003): Desember 2003 Vol 5, No 1 (2003): Juni 2003 Vol 4, No 2 (2002): Desember 2002 Vol 4, No 1 (2002): Juni 2002 Vol 3, No 2 (2001): Desember 2001 Vol 2, No 4 (2000): Desember 2000 Vol 2, No 3 (2000): September 2000 Vol 2, No 2 (2000): Juni 2000 Vol 2, No 1 (2000): Maret 2000 Vol 1, No 4 (1999): Desember 1999 Vol 1, No 3 (1999): September 1999 Vol 1, No 1 (1999): Maret 1999 More Issue