cover
Contact Name
Nur Hasanah
Contact Email
nur.hasanah@batan.go.id
Phone
+6221-5204243
Journal Mail Official
jpen@batan.go.id
Editorial Address
Kawasan Kantor Pusat Badan Tenaga Nuklir Nasional Jl. Kuningan Barat, Mampang Prapatan, Jakarta 12710 Kotak Pos 4390 Jakarta 12043
Location
Kota adm. jakarta selatan,
Dki jakarta
INDONESIA
Jurnal Pengembangan Energi Nuklir
ISSN : 14109816     EISSN : 25029479     DOI : https://doi.org/10.17146/jpen
Jurnal Pengembangan Energi Nuklir publishes scientific papers on the results of studies and research on nuclear energy development with the scope of energy and electricity planning, nuclear energy technology, energy economics, management of nuclear power plants, national industries that support nuclear power plants, aspects of the nuclear power plant site and environment, and topics others that support the development of nuclear energy.
Articles 5 Documents
Search results for , issue "Vol 8, No 2 (2006): Desember 2006" : 5 Documents clear
RONA AWAL PLANKTON DI PERAIRAN TAPAK PLTN MURIA Norma Afiati; Yarianto Sugeng Budi Susilo; Mauritz L. Tobing; Heni Susiati
Jurnal Pengembangan Energi Nuklir Vol 8, No 2 (2006): Desember 2006
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2006.8.2.1972

Abstract

ABSTRAK RONA AWAL PLANKTON DI PERAIRAN TAPAK PLTN MURIA. Rencana pembangunan PLTN diperkirakan mempunyai potensi menimbulkan dampak negatif terhadap ekosistem perairan. Dampak tersebut bersumber dari tahap kegiatan konstruksi dan operasi. Besaran dampak akan sangat tergantung pada kondisi rona awai dibandingkan dengan kondisi setelah terjadi perubahan lingkungan akibat kegiatan proyek. Plankton merupakan organisme yang penting dalam rantai makanan, dan merupakan organisme yang sensitif terhadap perubahan lingkungan. Fitoplankton merupakan produsen, sedangkan zooplankton merupakan konsumen tingkat pertama. Metode yang digunakan untuk penelitian ini adalah sampling acak. Sampel diambil dengan jaring plankton dan pengambilan sampel sedimen dengan Ekman grab sampler. Identifikasi dilakukan dengan mikroskop; individu yang berukuran cukup besar diidentifikasi dengan binokular. Kelimpahan dan indeks keanekaragaman spesies dilakukan berdasarkan rumus Shannon. Hasil penelitian menunjukkan di sekitar rencana PLTN Muria dijumpai 23 jenis fitoplankton, jumlah spesies fitoplankton laut lebih tinggi dibandingkan dengan spesies fitoplankton dari ekosistem sungai, jumlah populasi zooplankton mengikuti kecenderungan populasi fitoplankton. Kata kunci: fitoplankton, zooplankton, kelimpahan, indeks keanekaragaman.   ABSTRACT EXISTING CONDITION OF PLANKTON IN THE WATER BODY OF MURIA NPP SITE. NPP development project is predicted have a potential impact to the water ecosystem. The source of impact is the activities at the both construction and operation stage. The scale of impact will be depending on the existing condition compared to the environmental condition changes after the project activity. Plankton is the organisms that have the significant role in terms of food chain and they are sensitive to the environmental change. Phytoplankton is the food producer in the water ecosystem; meanwhile zooplankton is the first level of consumer. The method used in this work was random sampling. Plankton sampling was using piankton net. Identification for micro-organism used microscope, while for larger organism used binocular. Calculation of abundance and species diversity index used Shannon formula. The result showed that in the vicinity of Ujung Lemahabang Site was found about 23 species of phytoplankton; number of marine phytoplankton was more than that of the fresh water ecosystem, trend of zooplankton population follows phytoplankton trend. Keywords: phytoplankton, zooplankton, abundance, diversity index.
STUDI AWAL PLTN DI SUMATERA Edwaren Liun
Jurnal Pengembangan Energi Nuklir Vol 8, No 2 (2006): Desember 2006
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2006.8.2.1968

Abstract

ABSTRAK STUDI AWAL PLTN DI SUMATERA. Saat ini pertumbuhan permintaan kapasitas daya listrik di wilayah Sumatera sekitar 11.3% per tahun. Dengan kondisi sistem kelistrikan saat ini menyebabkan pemadaman listrik secara bergilir yang hampir teijadi setiap hari di seluruh wilayah. Penambahan kapasitas dengan pembangkit berskala kecil, pertumbuhan permintaan di wilayah ini sulit terpenuhi. Sedangkan fasilitas pembangkitan yang selama ini menggunakan bahan bakar minyak sudah tidak layak dioperasikan karena menimbulkan beban subsidi yang sangat tinggi. Dengan kondisi demikian di masa mendatang Pulau Sumatra membutuhkan kapasitas tambahan dalam unit-unit berskala besar yang peluang terbesar dimungkin dengan PLTN. Kata kunci: Kondisi kelistrikan Sumatera, defisit daya, PLTN di Sumatera.   ABSTRACT In this time demand growth of electricity generation capacities on Sumatra region is about 11.3% per year. That condition cause power off by have innings which almost happened every day in all region. Addition of capacities with small scale generating, the demand growth in this region is difficult to meet. While generating facilities which until now use oil fuel have is not feasible to operate because the generating cause very high subsidy burden. With that way condition of Sumatra Island additional demand of capacities in large scale units which is possible biggest opportunity by Nuclear Power Plants (NPP) in the next period. Keywords: Electricity condition of Sumatra, power deficit, NPP in Sumatra.
KAJIAN PEMANFAATAN PLTN SMART UNTUK KAWASAN BARELANG Sahala Maruli Lumbanraja; Yuliastuti Yuliastuti
Jurnal Pengembangan Energi Nuklir Vol 8, No 2 (2006): Desember 2006
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2006.8.2.1969

Abstract

ABSTRAK KAJIAN PEMANFAATAN PLTN SMART UNTUK KAWASAN BARELANG. Makalah ini mengkaji kelayakan pemanfaatan reaktor SMART (Small innovative Modular Advanced Reactor) di kawasan BARELANG. Kawasan ini merupakan kawasan yang dikembangkan untuk kawasan industri yang terletak di Provinsi Kepulauan Riau. Permasalahan utama yang timbul di daerah ini adalah kebutuhan energi listrik dan air bersih baik untuk keperluan industri maupun kebutuhan penduduk. Sampai saat ini, Perusahaan Listrik Negara (PLN) belum mampu mensuplai kebutuhan energi listrik yang dibutuhkan pelaku industri. Seluruh pembangkit listrik masih menggunakan minyak sebagai sumber pembangkit sehingga biaya pembangkitan menjadi sangat mahal. Air bersih yang diproduksi oleh PDAM bersumber dari waduk yang khusus dibangun untuk menampung air hujan di saat musim hujan karena tidak ada sumber air yang lain, sehingga pada musim kemarau akan menimbulkan kekurangan pasokan. Reaktor SMART merupakan reaktor modular berpendingin air ringan yang dikembangkan oleh KAERI (Korea Atomic Energy Research Institute). Reaktor ini khususnya dikembangkan untuk tujuan ganda, yaitu untuk produksi listrik dan air bersih. Total daya termal yang dihasilkan sebesar 330 MWth dengan efisiensi 33 %. Sebanyak 90 MWe dihubungkan ke jaringan listrik dan sisanya digunakan untuk memproduksi air minum dengan kapasitas 40.000 m3/hari. Jika dibandingkan dengan jenis PLTN konvensional, reaktor ini didasarkan pada prinsip-prinsip operasi dan perbaikan yang sangat sederhana, keselamatan tinggi, mudah diinspeksi, waktu pembangunan relatif pendek, biaya investasi kecil, biaya pembangkitan sangat kompetitif, dan mudah disesuaikan dengan infrastruktur yang ada. Karakteristik utama SMART adalah konsep reaktor integral, dimana semua komponen-komponen utama sistem pendingin reaktor berada di dalam bejana tekan. Kata kunci: SMART, listrik, air, BARELANG.   ABSTRACT ASSESSMENT OF SMART REACTOR UTILIZATION FOR BARELANG REGION. This paper assesses the feasibility of SMART reactor utilization in BARELANG region. BARELANG region is an industrial area located in Riau Islands Province. The need of electricity and fresh water, whether for industry growth or people, are the main problem of this region. Until now, the National Electricity Company (PLN) has not able to supply the electricity needed by industrial sector. The use of oil as a main electricity generation resource of the entire power plant has caused a tremendous generation cost. On dry seasons, the fresh water supplied by PDAM is reducing drastically. This situation occurs because water source of PDAM extremely depends on the water storage during rainy seasons. SMART reactor is a modular light reactor developed by KAERI for dual purposes, producing electricity and fresh water at the same time. The total thermal power generated by this type of reactor is about 330 MWth with 33 % efficiency, as 90 MWe connected to the electricity grid and rest is used in producing potable water with capacity 40.000 m3/day. Compare to the conventional reactor, SMART reactor is based on simple operation and maintenance principles, enhanced safety, easy to inspect, a relatively short construction time, small investment cost, competitive generation cost, and a flexible design to fit with the existing infrastructure. The main characteristic of SMART reactor is an integral design concept where the entire main cooling system components are located in the pressurize vessel. Keywords: SMART, electricity, water, BARELANG.
STRATEGI OPTIMALISASI MANAJEMEN OUTAGE PLTN : DESKRIPSI UMUM Yuliastuti Yuliastuti; Sahala Maruli Lumbanraja
Jurnal Pengembangan Energi Nuklir Vol 8, No 2 (2006): Desember 2006
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2006.8.2.1970

Abstract

ABSTRAK STRATEGI OPTIMALISASI MANAJEMEN OUTAGE PLTN: DESKRIPSI UMUM. Optimalisasi manajemen outage merupakan faktor penting untuk menekan biaya operasional pembangkit listrik tenaga nuklir (PLTN). Selain itu, optimalisasi manjemen outage antara lain bertujuan untuk meminimalisir durasi outage, meningkatkan kehandalan kinerja dan keselamatan PLTN. Manajemen outage terdiri atas 3 tahap, yaitu, perencanaan, eksekusi, dan review setelah outage. Beberapa aspek yang perlu diperhatikan dalam tahap perencanaan antara lain, keselamatan dari bahaya nuklir selama dan setelah proses outage, kebijakan manajemen dan personil, pemeliharaan dan inspeksi, umpan balik dari pengalaman outage sebelumnya, dan aspek ekonomi yang berhubungan dengan proses outage. Setiap tahap dalam manajemen outage membutuhkan pemantauan kontinu agar optimalisasi outage dapat terwujud. Dengan menerapkan strategi manajemen outage yang baik, kinerja PLTN semakin meningkat dengan nilai faktor beban yang semakin besar mencapai 93% dan faktor ketidaktersediaan energi hilang tidak terencana kurang dari 2%. Kata kunci: PLTN, outage, perawatan dan inspeksi.   ABSTRACT NUCLEAR POWER PLANT OUTAGE MANAGEMENT OPTIMIZATION STRATEGY: GENERAL DESCRIPTION. Outage optimization is an important factor to reduce the NPP operational cost. Goals of outage optimization strategy are to minimize outage duration, and increase the performance and safety performance of the NPP. Outage management depends on three main phase preparation and planning, execution, and post outage review. The key issues in outage planning are nuclear safety; management and personnel policy; maintenance and inspection; outage experience feedback; and all economic aspects that relate to the outage process. Continuity control is required in each phase of outage management in order to reach the goal of outage optimization. By implementing a good outage planning strategy, NPP has increased steadily reaching 93% load factor and less than 2% for unplanned energy unavailability. Keywords: Nuclear Power Plant, outage, maintenance & inspection.
ANALISIS HIDROLOGI DAN OSEANOGRAFI DALAM SELEKSI TAPAK PLTN DI WILAYAH PROVINSI BANTEN Yarianto Sugeng Budi Susilo
Jurnal Pengembangan Energi Nuklir Vol 8, No 2 (2006): Desember 2006
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2006.8.2.1971

Abstract

ABSTRAK ANALISIS HIDROLOGI DAN OSEANOGRAFI DALAM SELEKSI TAPAK PLTN DI WILAYAH PROVINSI BANTEN. Dalam rangka pengembangan PLTN pada masa yang akan datang, perlu dilakukan inventarisasi calon tapak potensial, baik yang berada di Pulau Jawa maupun di Luar Pulau Jawa. Inventarisasi tapak PLTN ini dimaksudkan untuk menjawab tantangan permintaan energi nasional. Proses pemilihan tapak dilakukan sesuai standar keselamatan IAEA tentang pemilihan tapak, dengan investigasi beberapa aspek yang berkaitan dengan keselamatan PLTN (faktor penolak, keselamatan dan kecocokan) dalam suatu region yang cukup luas untuk mendapatkan caion-calon tapak potensial. Untuk tahapan pemilihan tapak potensial (tahap site survey) dalam aspek hidrologi dan oseanografi, analisis lebih difokuskan pada pasang surut sepanjang pantai utara, batimetri, potensi sumber daya air dan sistem hidrologi di Provinsi Banten. Metode yang dipakai adalah pengumpulan data sekunder konfirmasi lapangan, dan penelusuran internet. Hasil penelitian menunjukkan bahwa Tanjung Pujut dan Tanjung Pasir lebih cocok ditinjau dari aspek batimetri dan pertimbangan fasilitas pendingin. Sementara, Tanjung Kait dan Tanjung Pasir lebih cocok untuk pertimbangan tsunami yang mungkin dapat dibangkitkan oleh Gunung Krakatau. Kata kunci: seleksi tapak, hidrologi, oseanografi, tsunami, batimetri.   ABSTRACT HYDROLOGY AND OCEANOGRAPHY ANALYSIS REGARDING THE NPP SITE SCREENING PROCESS AT BANTEN PROVINCE. Regarding the NPP development in the future, it is needed to make inventory of potential site in the Java Island as well as in the outside Java Island. The NPP site inventory availability is to answer the energy demand challenge. Site screening process should be performed in accordance with the IAEA safety satandard regarding the site selection, investigating several aspects related to the NPP safety (exclusion, safety and suitability factor) in the large area to obtain potential site candidates. For the site survey stage of hydrology and oceanography aspects, the analysis are more focused on the tidal phenomena along the north coasline, bathymetry, water resource, and hydrology system in the Bante'n Province. The method used are secondary data collection, field confirmation and internet searching. The result of the study showed that Tanjung Pujut and Tanjung Pasir are suitable based on the bathymetry and water intake facility consideration. Meanwhile tanjung Kait and Tanjung Pasir more suitable considering tsunami aspectcs that may be generated by Krakatau Volcano. Keywords: site selection, hydrology, oceanography, tsunami.

Page 1 of 1 | Total Record : 5


Filter by Year

2006 2006


Filter By Issues
All Issue Vol 23, No 2 (2021): Desember 2021 Vol 23, No 1 (2021): Juni 2021 Vol 22, No 2 (2020): Desember 2020 Vol 22, No 1 (2020): Juni 2020 Vol 21, No 2 (2019): Desember 2019 Vol 21, No 1 (2019): Juni 2019 Vol 20, No 2 (2018): Desember 2018 Vol 20, No 1 (2018): Juni 2018 Vol 19, No 2 (2017): Desember 2017 Vol 19, No 1 (2017): Juni 2017 Vol 18, No 2 (2016): Desember 2016 Vol 18, No 1 (2016): Juni 2016 Vol 17, No 2 (2015): Desember 2015 Vol 17, No 1 (2015): Juni 2015 Vol 16, No 2 (2014): Desember 2014 Vol 16, No 1 (2014): Juni 2014 Vol 15, No 2 (2013): Desember 2013 Vol 15, No 1 (2013): Juni 2013 Vol 14, No 2 (2012): Desember 2012 Vol 14, No 1 (2012): Juni 2012 Vol 13, No 2 (2011): Desember 2011 Vol 13, No 1 (2011): Juni 2011 Vol 12, No 2 (2010): Desember 2010 Vol 12, No 1 (2010): Juni 2010 Vol 11, No 2 (2009): Desember 2009 Vol 11, No 1 (2009): Juni 2009 Vol 10, No 2 (2008): Desember 2008 Vol 10, No 1 (2008): Juni 2008 Vol 9, No 2 (2007): Desember 2007 Vol 9, No 1 (2007): Juni 2007 Vol 8, No 2 (2006): Desember 2006 Vol 8, No 1 (2006): Juni 2006 Vol 7, No 2 (2005): Desember 2005 Vol 7, No 1 (2005): Juni 2005 Vol 6, No 2 (2004): Desember 2004 Vol 6, No 1 (2004): Juni 2004 Vol 5, No 2 (2003): Desember 2003 Vol 5, No 1 (2003): Juni 2003 Vol 4, No 2 (2002): Desember 2002 Vol 4, No 1 (2002): Juni 2002 Vol 3, No 2 (2001): Desember 2001 Vol 2, No 4 (2000): Desember 2000 Vol 2, No 3 (2000): September 2000 Vol 2, No 2 (2000): Juni 2000 Vol 2, No 1 (2000): Maret 2000 Vol 1, No 4 (1999): Desember 1999 Vol 1, No 3 (1999): September 1999 Vol 1, No 1 (1999): Maret 1999 More Issue