cover
Contact Name
Nur Hasanah
Contact Email
nur.hasanah@batan.go.id
Phone
+6221-5204243
Journal Mail Official
jpen@batan.go.id
Editorial Address
Kawasan Kantor Pusat Badan Tenaga Nuklir Nasional Jl. Kuningan Barat, Mampang Prapatan, Jakarta 12710 Kotak Pos 4390 Jakarta 12043
Location
Kota adm. jakarta selatan,
Dki jakarta
INDONESIA
Jurnal Pengembangan Energi Nuklir
ISSN : 14109816     EISSN : 25029479     DOI : https://doi.org/10.17146/jpen
Jurnal Pengembangan Energi Nuklir publishes scientific papers on the results of studies and research on nuclear energy development with the scope of energy and electricity planning, nuclear energy technology, energy economics, management of nuclear power plants, national industries that support nuclear power plants, aspects of the nuclear power plant site and environment, and topics others that support the development of nuclear energy.
Articles 5 Documents
Search results for , issue "Vol 9, No 2 (2007): Desember 2007" : 5 Documents clear
INVENTARISASI TAPAK POTENSIAL PLTN DI WILAYAH PROPINSI BANTEN Hadi Suntoko
Jurnal Pengembangan Energi Nuklir Vol 9, No 2 (2007): Desember 2007
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2007.9.2.1959

Abstract

ABSTRAK WILAYAH BARAT DAN UTARA BANTEN MERUPAKAN LOKASI STRATEGIS UNTUK PENGEMBANGAN KAWASAN INDUSTRI. Perkembangan industri perlu diikuti peningkatan pasokan listrik nasional yang semakin krisis di masa mendatang, sehingga dipertimbangkan energi alternatif seperti Pembangkit Listrik Tenaga Nuklir (PLTN) menjadi pilihan terbaik guna memenuhi pasokan iistrik. Untuk mencari lokasi potensial akan dianalisis berdasarkan 6 parameter aspek penelitian melalui persiapan, perencanaan, penelitian, dan pemantauan sesuai Safety Standard Series IAEA, NS-R-3 (2003) tentang siting dan evaluasi tapak. Tujuan survei pendahuluan ini adalah melakukan inventarisasi lokasi, dalam rangka memperoleh data calon tapak di wilayah Banten. Metode yang digunakan adalah pengumpulan data, pemeringkatan, dan konfirmasi lapangan terhadap aspek kegunungapian, patahan permukaan, kecocokan pondasi, kegempaan, kepadatan penduduk, dan tsunami. Ke enam aspek tersebut dengan mempertimbangkan faktor external events. Hasil analisis survei menunjukan bahwa tapak potensial PLTN di Propinsi Banten adalah daerah Tanjung Pasir (Muara Balong), Tanjung Kait, dan Tanjung Pontang. Kata kunci: Lokasi strategis, tapak potensial, siting, pemeringkatan, external events.   ABSTRACT BANTEN REGION FOR WEST AND NORTH IS STRATEGIC LOCATION FOR THE DEVELOPMENT OF INDUSTRIAL AREA. The Growing of industry need the make-up of national electrics addition which progressively period to crisis in the future, so that it was considered by alternative energy like Power Station Of Nuclear Energy (NPPs) is best choice to fulfill electrics. It will be analyzed to looking for potential site about 6 parameters recording preparing, planing, and observating based on There by prepare of planology in the strategic area require to be done. To determine potential site need preparation, planning, research, and monitoring relating at Safety Standard Series IAEA, NS-R-3 (2003). Based on consideration of safety factor, feasibility factor, and refuse factor, it will obtain the best site. Investigation survey of location is to get candidate site, and to collect data in the Banten region to identificate of potential site of safety aspect, according to national/international standard. Method survey is used the leveling, consideration with data collecting, and field confirmation. Election of this special potential site consider by external factor events. The resulting of survey have been analysed and conclude potential site is Tanjung Pasir (Muara Balong), Tanjung Kait, and Tanjung Pontang. Keywords: Strategy site. Potential site, siting, Ranking, external events.
PERANAN INDUSTRI JASA KONSULTAN NASIONAL UNTUK MENDUKUNG PROGRAM PLTN PERTAMA DI INDONESIA Dharu Dewi; Sahala Maruli Lumbanraja; Sriyana Sriyana
Jurnal Pengembangan Energi Nuklir Vol 9, No 2 (2007): Desember 2007
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2007.9.2.1960

Abstract

ABSTRAK PERANAN INDUSTRI JASA KONSULTAN NASIONAL UNTUK MENDUKUNG PROGRAM PLTN PERTAMA DI INDONESIA. Telah dilakukan studi mengenai peranan industri jasa konsultan nasional untuk ikut terlibat di dalam program Pembangkit Listrik Tenaga Nuklir (PLTN) Pertama di Indonesia. Kegiatan program PLTN akan berhasil apabila dalam pelaksanaannya diawali dengan perencanaan yang baik. Untuk mendapatkan hasil yang optimal, peluang dan peran industri jasa konsultan nasional perlu dikembangkan sehingga porsi lokalisasi program PLTN menjadi lebih besar. Pemanfaatan jasa konsultan nasional diharapkan dapat menjadi second opinion yang sangat berperan penting di dalam mensosialisasikan program PLTN. Pemerintah maupun calon pemilik proyek (Owner) PLTN hendaknya menganalisis, merencanakan dan melaksanakan secara matang program kegiatan PLTN dengan melibatkan jasa konsuitan nasional mulai dari identifikasi konsultan nasional yang ada, mempertimbangkan proses pengadaan jasa konsultan nasional, merumuskan ruang lingkup kerja konsultan, mengadakan seleksi jasa konsultan nasional, mengevaluasi sampai dengan pemonitoran dan pengawasan sehingga diharapkan dengan penggunaan konsultan nasional akan diperoleh manfaat hasil proyek yang lebih efektif, efisien, ekonomis, tepat sasaran dan tepat mutu. Studi ini mengkaji bentuk dan jenis konsultan nasional, berbagai kajian paket pekerjaan yang dapat dilaksanakan oleh konsultan nasional, metode pemilihan konsultan nasional, tantangan/kendala konsultan nasional, serta peningkatan peranan konsultan nasional untuk ikut andil dalam mendukung program persiapan dan pembangunan PLTN di Indonesia. Adapun metode penelitian yang digunakan adalah dengan penelusuran studi literatur, konsultansi teknis dengan nara sumber dan penelusuran website/internet. Kata kunci: billing rate, jasa konsultansi, Pembangkit Listrik Tenaga Nuklir, tenaga ahli.   ABSTRACT THE ROLE OF NATIONAL CONSULTANT SERVICES INDUSTRIES TO SUPPORT THE FIRST NUCLEAR POWER PLANT PROGRAMME IN INDONESIA. A Study has been done which concerning the role of Indonesian National Consultant Services Industries to support the First Nuclear Power Plant (NPP) Programme in Indonesia. NPP Programme activities will be success if the studies should be started with good planning. To obtain the optimal results, the opportunity and the role of national consultants should be considered to the localization of NPP Programme to be bigger. Utilitizing of national consultants services can be expected to become second opinion which is to play important role in socialization of NPP Programme. The Government and NPP Project Owner’s candidate should analysis, plan and implement the Nuclear Power Plant Programme activities, started from identification of the available national consultants, considering the national consultants procurement process, definition of scope of works of national consultants activities, carryng out the selection of national consultants, evaluation, monitoring and supervision so that the utilizing of national consultants will give benefit more effective, efficient, economic, appropiate objectives and good quality. This study to assess the structure and type of national consultants, works package which can be done by national consultants, selection methods of national consultants, constraint of national consultants and enhancing of the role of national consultants to involve and support in the nuclear power plant programme in Indonesia. The research methods are literature study, consultation with resource person and exploring of website/internet. Keywords: billing rate, consultant services, expert, Nuclear Power Plant.
STUDI SUMBER DAYA MANUSIA TERHADAP INDUTRIALISASI DI MADURA Aziz Jakfar; Mochamad Nasrullah; Sriyana Sriyana; Moch. Djoko Birmano
Jurnal Pengembangan Energi Nuklir Vol 9, No 2 (2007): Desember 2007
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2007.9.2.1961

Abstract

ABSTRAK STUDI SUMBER DAYA MANUSIA TERHADAP INDUTRIALISASI DI MADURA. Tujuan dari penelitian adalah memperoleh gambaran yang komprehensif mengenai kesiapan SDM terhadap industrialisasi di Madura dengan : 1). Menentukan arah pengembangan industrialisasi; 2).Mengidentifikasi faktor pendukung dan kendala; 3).Mengidentifikasi alternatif solusi; 4).Menentukan analisis kapasitas SDM dengan Indeks Pembangunan Manusia (IPM) atau Human Development Index (HDI); 5).Mengidentifikasi strategi pengembangan ketenagakerjaan; 6).Mengidentifikasi peran pendidikan dalam pengembangan SDM; 7).Merumuskan agenda pengembangan SDM. Arah dari pengembangan kawasan industrialisasi di Madura adalah memberikan iklim kondusif bagi investor untuk mengoptimalkan industri berbasis potensi dan perluasan/ekspansi industri dari daerah lain. Faktor pendukung skenario industrialisasi di Madura : Jembatan Suramadu, perluasan Gerbang Kertosusiia menjadi Germa Kertosusila dan tersedianya sarana dan prasarana. Faktor kendalanya : rendahnya persepsi masyarakat terhadap pentingnya industrialisasi dan adanya keterbatasan pasokan energi listrik dan air. Alternatif solusi terhadap faktor kendala : sosialisasi pentingnya industrialisasi bagi kemajuan Madura oleh semua komponen stake holders. Sedangkan, keterbatasan pasokan energi listrik dan air bersih di masa mendatang dapat dipertimbangkan alternatif PLTN Desalinasi. Pembangunan kapasitas SDM di Madura masih belum layak dan jauh di bawah rata-rata di Jawa Timur, ditandai dengan rendahnya nilai rataan di Madura. Namun demikian, secara ekonomi sebenarnya sudah baik ditandai dengan nilai daya beli (IDB) diatas rataan jawa Timur. Strategi kebijakan pengembangan ketenagakerjaan yang dapat dilakukan adalah :1). Meningkatkan aksesibilitas untuk memperlancar aliran investasi dan produksi dan menciptakan keterkaitan ekonomi; 2).Mendorong pemanfaatan potensi SDA yang belum tergali; 3). Meningkatkan kelangsungan usaha yang sudah ada; 4). Meningkatkan kemampuan pemerintah daerah untuk menarik investor berdasar keunggulan komparatif dan kompetitif; 5). Meningkatkan kapasitas SDM daerah yang lebih profesional. Kata kunci: sumberdaya manusia (SDM), industrialisasi, PLTN-Desalinasi, tenaga kerja, pendidikan.   ABSTRACT THE STUDY ON HUMAN RESOURCES TOWARD INDUSTRIALIZATION IN MADURA. This research aims at arriving at rich description about human resources’ readiness toward industrialization by 1) determining the direction of industrialization development, 2) discovering supporting as well as interfering factors, 3) identifying alternative solution to the problems, 3) analyzing human resources capacity in terms of Human Development Index, 5) recognizing labor development strategy, 6) noticing the role of education in developing human resources, 7) formulating human resources development agenda. The goal of industrialization development in Madura region is to create such conducive circumstances for the investors that it is likely to trigger optimal industries with its potency and expansion based. Some supporting factors associated with the industrial development scenario in Madura are Suramadu bridge, the expansion of Gerbang Kertosusila into Germa Kertosusila and the availability of facilities and infrastructure. In addition, there are some interfering factors to be considered such as low perception of the local community on the importance of industrialization as well as the shortage of electricity and water intake. The alternative solutions to the obstacles above are to promote socialization program on the importance of industrialization for the advancement of Madura region by all related stakeholders while considering the use of PLTN desalination over water and electricity problems.mHowever, human resources development capacity of Maduresse, whose average capacity is considered both improper and far below the average capacity of the whole population in East Java. Nevertheless, Maduresse relatively has already attained sufficient purchasing power (nilai daya beli/IDB) which is above the average on East Java population as a whole. Labor development strategy policy can be carried through; 1) improving accessibility to Madura to speed up the flow of outside investment, production as well as business; 2) promoting local labor force; 3) improving the prevailing economics activities; 4) improving local government capacity to attract outside investors based on its comparative and competitive superiority; 5) promoting qualified capacity toward local human resources Keywords: human resources, industrialization, PLTN-Desalination, labor force, education.
STUDI UNJUK KERJA PWR DI NEGARA PENYEDIA TEKNOLOGI : KASUS KOREA SELATAN DAN JEPANG Sriyana Sriyana
Jurnal Pengembangan Energi Nuklir Vol 9, No 2 (2007): Desember 2007
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2007.9.2.1962

Abstract

ABSTRAK STUDI UNJUK KERJA PWR DI NEGARA PENYEDIA TEKNOLOGI: KASUS KOREA SELATAN DAN JEPANG. Pertumbuhan ekonomi nasional perlu dukungan infrastruktur listrik yang cukup. Berbagai altematif sumber energi dicari untuk menjaga kesinambungan pasokan listrik ini, sekaligus keberlangsungan pembangunan ekonomi. Pembangkit Listrik Tenaga Nuklir (PLTN) menjadi altematif pembangkit listrik sebagai solusi bauran energi optimum di Indonesia dan direncanakan untuk beroperasi tahun 2016. Berbagai studi telah dilakukan untuk mempersiapkan pembangunannya. Studi ini memfokuskan pada unjuk kerja PLTN tipe PWR di Asia, yakni Jepang dan Korea Selatan. Metode yang digunakan pada studi ini adalah penelusuran literatur dan perhitungan kecil. Parameter yang digunakan untuk studi ini adalah faktor ketersediaan energi rata-rata tiap unit tiap tahun. Studi ini menyimpulkan bahwa: (1) Jumlah PLTN tipe PWR di Jepang sebanyak 22 unit dengan umur operasi total sebesar 526 reaktor tahun dan faktor ketersediaan energi rata-rata tiap unit tiap tahun sebesar 70,7%. Sementara itu tipe yang sama di Korea Selatan sebanyak 16 unit dengan umur operasi total sebesar 222 reaktor-tahun dengan faktor ketersediaan energi rata-rata tiap unit tiap tahun sebesar 86,9%. (2) PWR kelas 1000 MWe baik Korea Selatan maupun Jepang memiliki jumlah unit yang sama, yakni sebanyak 14 unit. Umur operasi total untuk kelas ini berturut-turut untuk Korea Selatan dan Jepang adalah sebesar 170 reaktor-tahun dan 307 reaktor-tahun. Sedangkan faktor ketersediaan energi rata-rata tiap unit tiap tahunnya sebesar 87,0% dan 69,6% berturut-turut untuk Korea Selatan dan Jepang. (3) Besaran faktor ketersediaan energi rata-rata biasanya mendekati dengan besaran faktor kapasitas, untuk itu dirasa penting sebagai masukan dalam penetapan asumsi parameter tekno-ekonomis. Hal ini akan berpengaruh dalam hasil perhitungan ekonomi PLTN secara keseluruhan. Kata kunci: unjuk kerja PLTN, faktor ketersediaan energi, PWR.   ABSTRACT PERFORMANCE OF PWR STUDY IN THE TECHNOLOGY SUPPLIER COUNTRIES: SOUTH KOREA AND JAPAN CASE. Electricity is needed as an infrastructure to support the national economic growth. For economic development sustainability, energy alternatives should be provided. Nuclear Power Plant (NPP) become the alternative of electricity generation for optimum energy mix in Indonesia and planned to operate in the 2016. Several studies have alredy done to prepare the NPP construction. This study focused on NPP performance especially PWR type in Asia, namely Japan and South Korea. Methodology used in this study is literature tracing and a small calculation. The energy availability per unit per year is used as a paramater for evaluating the NPP performance. This conclusion are (1) The amount of NPP - PWR type in Japan is 22 units with total operational experiences 526 reactor-years and the average energy availability factor about 70.7% per unit per year. Meanwhile for the same type South Korea has 16 unit with total operational experiences 222 reactor-years and average availability factor per unit per year is about 86.9%. (2) The 1000 class of PWR type both South Korea and Japan have 14 units. The operational experiences for this class is 170 reactor-years for South Korea and 307 reactor-years for Japan. Meanwhile the average availabiiiy factor per unit per year is about 87.0% for South Korea and 69.6% for Japan. (3) The average availability factor is closed to capacity factor, so is important for real figure in assumming the tecno-economic parameters, because it will influence the result of economic calculation. Keywords: NPP performance, availability factor, PWR.
STUDI PEMODELAN PERUBAHAN GARIS PANTAI DI SEKITAR PERAIRAN TAPAK PLTN SEMENANJUNG MURIA Tumpal Pahala Tua Sinaga; Heni Susiati
Jurnal Pengembangan Energi Nuklir Vol 9, No 2 (2007): Desember 2007
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2007.9.2.1958

Abstract

ABSTRAK STUDI PEMODELAN PERUBAHAN GARIS PANTAI DI SEKITAR PERAIRAN TAPAK PLTN SEMENANJUNG MURIA. Lingkungan pantai merupakan daerah yang seialu mengalami perubahan karena daerah tersebut menjadi tempat pertemuan dua energi yang betasal dan lautan maupun daratan. Bentuk perubahan tersebut berupa maiu-mundumya garis pantai. Proses perubahan garis pantai terjadi karena adanya angkutan sedimen di wilayah pantai (Coastal Sediment Transport). Bentuk angkuten sedimen yang dimaksud berupa angkutan sedimen sejajar pantai (Longshore Sediment Transport) dan angkutan sedimen tegak lurus pantai (Cross-shore Sediment Transport). Tujuan dilaksanakannya penelitian ini adalah untuk memodelkan transpor sedimen sehingga diperoleh data laju, arah, volume transpor sedimen sepanjang pantai serta untuk mengetahui daerah yang mengalami akresi dan abrasi di pantai sekitar tapak PLTN. Metode sampling yang digunakan adalah metode Purposive Sampling dan pengolahan data dilakukan dengan software NEMOS. Secara keseluruhan hasil pemodelan transpor sedimen, laju transpor sedimennya adalah Q- = 2.471.331.00 m3/tahun Q+ = -1.325.456.80 m3/tahun, Qgs= 3.796.792.60 m/tahun dan Qnet= 1.145.874.40 m3/tahun; rata-rata jarak abrasi = - 0.982 m dan jarak akresi 0.770 m pertahun; volume transpor ke kanan = 13.431,15 (m3)/tahun, kekiri = -7.203,53 (m3)/tahun. Kata kunci: garis pantai, sedimen, abrasi dan akresi, dan NEMOS.   ABSTRACT STUDY OF COASTAL LINES CHANGE MODELLING AROUND THE NPP SITE SITE OF MURIA PENINSULA. Coastal areas always changing due to two energies coming coming sea and land congregate.The changes are the forward-backward coastal lines alteration. The coastal lines alteration is caused by coastal sediment transport such as Longshore Sediment Transport and Cross-shore Sediment Transport. This research was aimed to model the sediment transport rate, direction and sediment transport volume and also to investigate the abrasion and accretion areas in Muria Peninsula. The method used in this sampling was purposive aampling method and data processing using NEMOS software. Overall result from the sediment transport model in Semenanjung Muria, the sediment transport rate were Q+ = 2471331.00 m3/year Q- = -1325456.80 m3/year, Qgs= 3796792.60 m3/year and Qnet= 1145874.40 m3/year; average abrasion and accretion distance were -0.982 m/year and 0.770 m/year; transport volume to right = 13431,15 (m3)/year and to left = -7203,53 (m3)/year. Keywords: coastal lines, sediment, abrasion and accretion, and NEMOS.

Page 1 of 1 | Total Record : 5


Filter by Year

2007 2007


Filter By Issues
All Issue Vol 23, No 2 (2021): Desember 2021 Vol 23, No 1 (2021): Juni 2021 Vol 22, No 2 (2020): Desember 2020 Vol 22, No 1 (2020): Juni 2020 Vol 21, No 2 (2019): Desember 2019 Vol 21, No 1 (2019): Juni 2019 Vol 20, No 2 (2018): Desember 2018 Vol 20, No 1 (2018): Juni 2018 Vol 19, No 2 (2017): Desember 2017 Vol 19, No 1 (2017): Juni 2017 Vol 18, No 2 (2016): Desember 2016 Vol 18, No 1 (2016): Juni 2016 Vol 17, No 2 (2015): Desember 2015 Vol 17, No 1 (2015): Juni 2015 Vol 16, No 2 (2014): Desember 2014 Vol 16, No 1 (2014): Juni 2014 Vol 15, No 2 (2013): Desember 2013 Vol 15, No 1 (2013): Juni 2013 Vol 14, No 2 (2012): Desember 2012 Vol 14, No 1 (2012): Juni 2012 Vol 13, No 2 (2011): Desember 2011 Vol 13, No 1 (2011): Juni 2011 Vol 12, No 2 (2010): Desember 2010 Vol 12, No 1 (2010): Juni 2010 Vol 11, No 2 (2009): Desember 2009 Vol 11, No 1 (2009): Juni 2009 Vol 10, No 2 (2008): Desember 2008 Vol 10, No 1 (2008): Juni 2008 Vol 9, No 2 (2007): Desember 2007 Vol 9, No 1 (2007): Juni 2007 Vol 8, No 2 (2006): Desember 2006 Vol 8, No 1 (2006): Juni 2006 Vol 7, No 2 (2005): Desember 2005 Vol 7, No 1 (2005): Juni 2005 Vol 6, No 2 (2004): Desember 2004 Vol 6, No 1 (2004): Juni 2004 Vol 5, No 2 (2003): Desember 2003 Vol 5, No 1 (2003): Juni 2003 Vol 4, No 2 (2002): Desember 2002 Vol 4, No 1 (2002): Juni 2002 Vol 3, No 2 (2001): Desember 2001 Vol 2, No 4 (2000): Desember 2000 Vol 2, No 3 (2000): September 2000 Vol 2, No 2 (2000): Juni 2000 Vol 2, No 1 (2000): Maret 2000 Vol 1, No 4 (1999): Desember 1999 Vol 1, No 3 (1999): September 1999 Vol 1, No 1 (1999): Maret 1999 More Issue