cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota surabaya,
Jawa timur
INDONESIA
Jurnal Titra
ISSN : -     EISSN : -     DOI : -
Core Subject : Engineering,
Arjuna Subject : -
Articles 76 Documents
Search results for , issue "Vol 1, No 2 (2013)" : 76 Documents clear
Value Stream Mapping sebagai Upaya Pengurangan Waste di Departemen S PT A Novitriana Anggraini Sudjianto; Liem Yenny Bendatu; I Gede Agus Widyadana
Jurnal Titra Vol 1, No 2 (2013)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (740.001 KB)

Abstract

PT A is a manufacturer company which produces cigarette. PT A wants to do continuous improvement by keeping on reducing waste in S department. Value Stream Mapping (VSM) is a method that has been used to identify value added activity and non value added activity (waste) in that company.Based on the current value stream mapping of brand Y, there are 3 types of wastes which are inventory, transportation, and waiting. The proposed improvements will reflect in the future value stream mapping and reduce the total lead time by 5.82 %.
Perencanaan Perbaikan Proses Administrasi dan Analisis Kebutuhan Operator Proses Produksi PG 1160 di PT E-T-A Indonesia William Chokro; I Nyoman Sutapa
Jurnal Titra Vol 1, No 2 (2013)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (250.197 KB)

Abstract

PT E-T-A Indonesia had problems on administrations and production process. In the administrations, it was found that the lead time to fulfill the customer order was too long. While, in the production process, the company wanted to know how many workers should be utilized in the production line. To answer these problems, we occupied Makigami Diagram for identifying inefficiency processes in the administration department. We also measured the daily KPI for deciding the optimized the number of workers. As the results of those improvement; the total day for administration process was reduced to two days and the number of workers could be reduced up to two persons.
Pembuatan Dokumentasi HACCP di Plant-1 PT X Maria Yohana Megawati; Felecia -
Jurnal Titra Vol 1, No 2 (2013)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (282.689 KB)

Abstract

PT X is one of coconut oil company in Indonesia with copra and Crude Palm Oil (CPO) as raw material.  PT X has ISO 9001:2008 certification, and now they want to get ISO 22000:2005 certification to gain customer satisfaction. One of ISO 22000:2005 requirement is certification of HACCP. This thesis intended to prepare HACCP at Plant-1 PT X. This preparation have been done until making of HACCP team, product description, making of flowchart, making of principle one until principle seven of HACCP. Result of this thesis has been done until making follow up steps for every Critical Control Point (CCP). Problems that occurs in CCP  are metal, oil and grease may contaminate coconut oil. Suggestions that given for these problems are oil and grease must be changed into food grade oil and grease and application of metal trap. Result of implementation that has been done is given metal trap for every section that highly risk contaminated by metal.
Analisa Hubungan Faktor Demografis Karyawan dan Lingkungan Kerja terhadap Potensi Penyakit yang Diderita Karyawan PT Ecogreen Oleochemicals Batam Nyoto Hendy Wijaya; I Nyoman Sutapa
Jurnal Titra Vol 1, No 2 (2013)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (423.378 KB)

Abstract

This article discuss about correlation between demographic factor of employees and work environment against potential disease suffered by employees. Demographic factor of employees such as job grade, age, weight, and blood pressure. The company wanted to know about description of potential disease suffered by employees based on demographic factor, the correlation between that variables, and know work environment factor which potentially against disease in workplace. Analysis method used Spearman’s Rho Test, Logistic Regression, and Fishbone Diagram. The higher demographic factor cause the disease suffered by employees more dominated by degenerative disease. All demographic factor have a correlation with potential disease suffered by employees, but only 13 from 24 disease have strong correlation. The potential disease suffered by employees also caused by 2 factors from work environment, namely man (employees awareness still lacking) and management (role of company not optimal). This research was ended by doing effectiveness of annual medical check up analysis, namely by eliminating blood glucose test and add USG mammae test. The company should give further attention to employees, such as give a punishment to employees who not wearing PPE, auditing SHE in workspace, improve the infrastructure and provide training for employees about SHE.
Perancangan Quality Plan untuk Penurunan Tingkat Kecacatan Produk di PT. Sentosa Alloy Industri Gunedi Susanto; Jani Rahardjo
Jurnal Titra Vol 1, No 2 (2013)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (398.88 KB)

Abstract

PT. Sentosa Alloy Industri is a company which engaged in spare part manufacture field of motorcycle. This company produces velg, hub, flange, brake handle. The purpose of this study is to devise improvements proposed and quality plan in die casting process which aims to reduce the level of defects and improve the product quality.The result of this study are: the level of porous defects 4,38%,  the level of imperfect product defects 2,08%, the level of sticky product defects 1,43%, and the smallest level of defects is cracked with 0,04%. Potential problem can be identified and analyzed using fishbone and Failure Mode and Effect Analysis method. The improvements proposed to get are got from the highest Risk Priority Number value (RPN), which occurs in Machine (RPN = 128), Method (RPN = 112), Man (RPN = 112), and Material (RPN = 72)
Perancangan Metode Kerja padaProses Penyortiran Udang di PT. XYZ Albert Limantara; Tanti Octavia
Jurnal Titra Vol 1, No 2 (2013)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT. XYZ is a company which is engaged in the field of frozen shrimp exporters that produce shrimp sushi, shrimp tempura, and shrimp peeled. The problem that occurs is often failure to achieve the production target in the process of shrimp sorting. The factors that cause the failure of production target’s achieving are production target which is too high and the workers who are slow in the process of sorting. Based on these problems, in this research is undertaken the improvement of production target and the improvement of the movements of the left hand and right hand of workers in doing the sorting. The research concludes that the production target need to be lowered and is undertaken the improvement of the left hand and right hand of workers so that the production target will be achieved and the efficiency reaches 8,81%.