cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota surabaya,
Jawa timur
INDONESIA
Jurnal Titra
ISSN : -     EISSN : -     DOI : -
Core Subject : Engineering,
Arjuna Subject : -
Articles 24 Documents
Search results for , issue "Vol 3, No 1 (2015)" : 24 Documents clear
Evaluasi Kesehatan dan Keselamatan Kerja dengan Metode HIRARC pada PT. Charoen Pokphand Indonesia Wijaya, Albert; Panjaitan, Togar W.S; Palit, Herry Christian
Jurnal Titra Vol 3, No 1 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

PT. Charoen Pokphand Indonesia is a fodder company which is located in Surabaya – Mojokerto Street 26 Km, Krian City. This company consists of 4 areas which are feed mill area, raw material area, silo area, and finished good area. The company was in the preparatory stage SMK3 certification .Companies now want to evaluate the system of K3 with HIRARC that is one of the documents supporting SMK3 certification certification. If the company applies HIRARC, the dangerous activities in the company can be detected and the solution can be made immediately. As a result, the number of the accident in the workplace can be minimized. HIRARC method consists of 3 things which are hazard identification, risk assessment, and risk control. The data which is processed with HIRARC is got from the interview, observation, and company’s data. The result of health and safety evaluation with HIRARC method through PT Charoen Pokphand Indonesia is that there are still many dangerous activities; for example, an activity which has extremely high, high, and normal percentage of risk rating. The percentages of the dangerous activities in silo area are 8,82% in extremely high rate, 14,71% in high rate, and 47,06% in normal rate. On the other hand, the percentage of the dangerous activities in raw material warehouse are 14% in extremely high rate, 35% in high rate and 39% in normal rate. Those dangerous activities must be solved immediately by making risk control. The risk control which is suggested are giving sanctions, making checklist, maintaining the tools, replacing the tools if they are broken, changing the method, and giving training. The potential percentage of the dangerous activities which is expected to decrease in silo area is disappearing the extremely high risk, decreasing the percentage of the high and normal risk to 8,82%, and 23,53%. On the other hand, the potential percentage of dangerous activities which is expected to decrease in raw material warehouse is disappearing the extremely high risk, decreasing the percentage of high and normal risk to15,79% and 21,05%.
Upaya Peningkatan Output Aktual di Line 2 Finishing Chandra, Anthony; Yang Aysia, Debora Anne
Jurnal Titra Vol 3, No 1 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

PT. Integra Indocabinet is a wood furniture company. The company produces two types of products which are set-up product and knockdown product. Each product has monthly target which is set by PPIC department, which is 70 containers per month for knockdown type. However finishing department can’t fulfill this target. The purpose of this research are giving evaluation of actual output in finishing department, and suggesting several ways to improve the actual output. Observation, interview and time study are several methods which are used in this research. Observation and interview methods are used to find the root causes of the problem and to collect the historical data. Stopwatch time study is used to obtain the production capacity at finishing department. The result of production capacity calculation is 64.72 containers, while the actual output is only 62 containers. These capacity value and actual output value are not compatible with PPIC target, which are 70 containers. There are several factors which caused the actual output in finishing department is not optimum, they are the quantity and quality of the raw material from sanding department, higher occurrence of paint replacement, and many defect of WIP components. There are several improvements which are suggested to increase the actual output value. They are utilization of deadline form, classification of similar product in order to reduce the occurrence of paint replacement, and pallet modification to prevent WIP component fell down during production process.
Peningkatan Kapasitas Produksi pada PT. Adicitra Bhirawa Karine Santoso Putri; I Gede Agus Widyadana; Herry Christian Palit
Jurnal Titra Vol 3, No 1 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (446.758 KB)

Abstract

Currently, PT. Adicitra Bhirawa wants to increase their production capacity from 120 truck boxes per month into 250 truck boxes per month. The increasing of production capacity is applied by changing their production system from the piecework production system into line production system. The line production system is more efficient than the piecework production system in terms of the worker productivity. Line production system is designed using two heuristic methods of line balancing, Kilbridge-Wester and Helgeson-Birnie. The result shows Kilbridge-Wester gives the better result with 15 workstations. The proposed line production system can achieve the production target and increase the monthly worker productivity from 5.7 truck boxes/worker to 11.9 truck boxes/worker. A proposed plant layout is applied in order to support the new line production system.
Perbaikan Sistem Pergudangan di PT. X Otto Pratama; I Gede Agus Widyadana
Jurnal Titra Vol 3, No 1 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (282.23 KB)

Abstract

This paper anlayze PT X warehouse system since some problems that are faced by the company such as full capacity warehouse, the absence of a inventory control system, and bad facility layout. The full capacity warehouse problem is solved by using capacity analysis, repayment of raw material analysis, and selling the clothes waste. The improvement of inventory control system is conducted by comparing periodic review system and economic order quantity, while for the raw materials placement problem is solved by grouping the raw material. A periodic review system is simulated to know the number of raw material savings. The simulation result shows that the number of the raw materials can be reduced as much as 7 percent, while the new raw material placement save 42 percent of traveling distance.
Penurunan Kecacatan di PT Mulcindo Steel dengan Pendekatan Filosofi Six Sigma Shandy Ernanto Punyawan; Jani Rahardjo
Jurnal Titra Vol 3, No 1 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (553.314 KB)

Abstract

PT Mulcindo Steel Industry is a company specialized in steel fabrication, service, forming products, hollow products, c-truss products, and galvanizing process. Defect’s percentages on c-truss, main runner, batten hat 28x17, metal runner, and mini furring are over 0,05% but the study will be focused on the highest percentage which is the c-truss with 0,11% defect percentage. DMAIC is used as a method to find problem’s root cause which is found by 5 why analysis. There were several suggestions which are product defective definitions, product quality characteristic socialization to employees, coil width checksheet monitoring, c-truss machine work instruction, straightening uncoiler to the machine. It is found that solution implementation can reduce the defect percentage in c-truss product to 0,073%. The result have been able to reduce the level of defect on the type of different “kupingan tidak sama”.
Pengukuran Overall Equipment Effectiveness (OEE) di PT Astra Otoparts Tbk. Divisi Adiwira Plastik Christian Yoko Wijaya; I Gede Agus Widyadana
Jurnal Titra Vol 3, No 1 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (642.823 KB)

Abstract

Overall equipment effectiveness (OEE) is a performance measurement tool that can measure the production losses and identify improvement potential. PT Astra Otoparts Tbk. Adiwira Plastics Division (PT AO AWP) is a manufacturing company of automotive components made from plastic which always perform continuous improvement to increase productivity. The problem is the lack of OEE calculation standar prosedure for family mold usage in plastic injection machines. The other problem is the production data on the web which used to measure the performance of the production process can not show the actual condition of plastic injection machine. The cause of this problem are database system, shot per hour (SPH) system updates, and admin errors in data input. Error in production data can lead to errors in performance calculation result of production process as well as errors in set improvement point analysis. The OEE calculation result using production data from Laporan Hasil Produksi is 86%. the result of this calculation is analyzed to obtain the most influential factor and get the root causes for the decisions of improvement.
Penyusunan Hazard Identification Risk Assessment and Risk Control (HIRARC) Di PT. X Shandy Irawan; Togar W.S Panjaitan; Liem Yenny Bendatu
Jurnal Titra Vol 3, No 1 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (161.722 KB)

Abstract

PT. X is a company which produces a variety of glassware product. PT. X wants to develop Hazard Identification Risk Assessment and Risk Control (HIRARC) in order to fulfill the requirement of OHSAS 18001:2007 application. The area covers in raw materials warehouse, production, and finished good warehouse.The preparation of HIRARC is divided into 3 stages which are hazard identification, risk assessment, and risk control. Hazard identification is performed based on interviews with the workers, the observations in the factory, and the historical data of accidents at PT. X. The result of the risk assessment shows 34% of activities is categorized as low risk, 58% of activities is categorized as moderate risk , 8% of activities is categorized as high risk and there is no activity in the category of extreme risk. Risk control will be performed on activities with moderate risk and high risk category. Based on the result, there are 4 potential hazards with high risk category, which are the sharpness of the material in the production area, shortness of breath due to workers are not wearing APD, shortness of breath due to the pungent smell from additives during the casting process, and the hook of the basket is fragile in the mixing process. Risk Control is undertaken by giving APD, safety sign, punishment, equipment maintenance, and make a special area for walking.
Penurunan Persentase Rework di PT X dengan Metode DMAIC Hervy Monica Aransa; Debora Anne Yang Aysia
Jurnal Titra Vol 3, No 1 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (270.908 KB)

Abstract

PT X is a company which is focused on bag and plastic production. The high percentage of rework which is about 25.5% is one of the problems in this company. The purpose of this research is to decrease the rework percentage in PT X Company by using DMAIC method (Define, Measure, Analysis, Improve and Control). There are three types of defects that often happen based on Pareto Diagram, which are not proportional shapes, less of needlework and over-needlework.  Fishbone Diagram is used to find the cause of defects which are human factors, method and machine. There are six ways to decrease the higher percentage of reworks such as, making operator evaluation form, making sewing pattern using chalk, making a layer to measure the shape of product, rechecking the product at the end of production process, making a list of working instructions  and changing the needle regularly. By implementing four ways, it can reduce the number of defects which are 6 % on not proportional form and 2.27% on less of needlework. It also increases the percentage of over-needlework detects which is 1.33%. In general, there is a decreasing percentage of the number of defects which is about 6.9% after implementation. Control steps using quality plan, is made as a standard that aims to describe the production process, its name, material and characteristics quality which including types of defects, acceptance, measurement method, inspection period, inspection method, person in charge, and the actions based on quality characteristic.
Usulan Penurunan Tingkat Kecacatan Produk Sosis Ayam di PT Charoen Pokphand Indonesia Samuel -; Felecia -
Jurnal Titra Vol 3, No 1 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (408.169 KB)

Abstract

PT Charoen Pokphand Indonesia is one of Indonesia’s producer of poultry feed, day old chicks and processed chicken. This research is conducted in sausages plant in Surabaya which produced chicken and beef sausages. Chicken sausages have several types of defects like wrinkled (0,9%), fungus (0,04%), and reject cooking (0,34%). The purpose of this research is to find the defect’s root cause and to propose solutions to reduce chicken sausages defects.DMAIC is used as a method to find problem’s root cause and solution in this research along with interview and direct field observation. It is found that defects caused by operator lack of focus during operation, no quality inspection for PVDC plastic, machine breakdown and no standardized working procedure.This research proposed the company to give morning briefing for operators, quality inspection by quality control department for PVDC plastic, designing tray separator, designing checklist form, downtime form, and work instruction. It is expected to reduced chicken sausages defects up to 1,28%.
Upaya Peningkatan Output Produksi di PT. X Aldo Christianto Setiawan; Tanti Octavia
Jurnal Titra Vol 3, No 1 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (166.378 KB)

Abstract

PT X is a clothing company that produces bags and floor math. The problem that occured is unfulfilled the company’s target. The average of production output is only 24.82% of the capacity. Some of the causes of the problem are the production output decreased after 14.30 pm, the workers did not reach the target, and the decreasing of production output day after delivery the finished goods as 37.3%.The proposed improvements are company should provide target for each process of production and avoid the delivery of finished goods on Friday.

Page 2 of 3 | Total Record : 24