cover
Contact Name
Rika Ampuh Hadiguna
Contact Email
hadiguna@ft.unand.ac.id
Phone
-
Journal Mail Official
hadiguna@ft.unand.ac.id
Editorial Address
-
Location
Kota padang,
Sumatera barat
INDONESIA
Jurnal Optimasi Sistem Industri
Published by Universitas Andalas
ISSN : 20884842     EISSN : 24428795     DOI : -
Jurnal Optimasi Sistem Industri (JOSI) is a peer-reviewed journal that is published periodically (April and October) by the Department of Industrial Engineering, Faculty of Engineering, Universitas Andalas, Padang.
Arjuna Subject : -
Articles 17 Documents
Search results for , issue "Vol. 16 No. 2 (2017): Published in October 2017" : 17 Documents clear
Pemilihan dan Implementasi Strategi Peningkatan Kenyamanan Termal Ruang Kuliah Lusi Susanti; Hary Fandeli
Jurnal Optimasi Sistem Industri Vol. 16 No. 2 (2017): Published in October 2017
Publisher : The Industrial Engineering Department of Engineering Faculty at Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (843.704 KB) | DOI: 10.25077/josi.v16.n2.p112-119.2017

Abstract

Optimum conditions help us think and work better. Thermal comfort in lecture buildings is important to maintain students’s comfort and help them concentrate on study. The fastest way to achieve expected thermal comfort inside the lecture room is using air conditioner, however, compensation on high electricity bills and degradation of the environmental quality has to be made. Therefore, the aim of this paper is to find and promote several environmental friendly strategies which can provide comfort to users in one hand, but also can reduce energy consumption in another hand. There have been several strategies in records to increase thermal comfort in buildings. To select the best and the most appropriate alternative, Analytical Hierarchy Process method was used by setting the criteria, sub-criteria, and alternatives to increase thermal comfort in lecture buildings of Andalas University. To test the selected alternative, thermal comfort inside two lecture rooms were evaluated experimentally. The comfort level was evaluated using PMV (Predicted Mean Vote) and PPD (Predicted Percentage Dissatisfied) model. For all experimental conditions, PMV and PPD results and individual thermal vote results showed a good match statistically meaning that the PMV and PPD models could predict thermal condition inside the lecture rooms. Results also showed that the presence of natural vegetation infront of glass windows of the lecture rooms statistically improved thermal comfort sensations of students under natural ventilation mode and reduced thermostat setting under air conditioning mode.
Evaluasi Kualitas Layanan terhadap Operator Telekomunikasi: Tinjauan Perspektif Pelanggan Rizka Shoumil Ilhami; Dino Rimantho
Jurnal Optimasi Sistem Industri Vol. 16 No. 2 (2017): Published in October 2017
Publisher : The Industrial Engineering Department of Engineering Faculty at Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1133.387 KB) | DOI: 10.25077/josi.v16.n2.p150-157.2017

Abstract

PT. X organizes the office promotion every year, however it has not implemented the performance appraisal concept. This study was conducted on junior analyst at Laboratory Department of Routine Test in PT.X which has the highest number of employees in PT. X. This research aimed to find out the performance appraisal criteria and sub-criteria of the junior analysts, provide the weighting for each criteria and sub-criteria using Analytic Hierarchy Process (AHP) method, and recommend the planning framework of performance appraisal for junior analyst using Rating-Scale method in order to conduct the office promotion. The main criteria derived from this research were attendance, working target attainment, work thoroughness, proactive, empathy, cooperation (team/organization), analytical thinking, and flexibility. The result showed the working target attainment as the most important of the criterion approximately 0.248. Moreover, the consistency ratio around 0.020. In addition, the result of this research is applicable and could be proposed for conducting performance appraisal of junior analysts at Laboratory Department of PT. X in order to perform the office promotion.
Hubungan Phantom Vibration Syndrome Terhadap Sleep Disorder dan Kondisi Stress Ajeng Yeni Setianingrum
Jurnal Optimasi Sistem Industri Vol. 16 No. 2 (2017): Published in October 2017
Publisher : The Industrial Engineering Department of Engineering Faculty at Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (803.32 KB) | DOI: 10.25077/josi.v16.n2.p158-166.2017

Abstract

Phantom vibration syndrome is a condition where a person would feel the sensation of vibration of a cell phone as if there were incoming notification but the fact is not. This research investigated the relationship between phantom vibration syndromes, sleep disorder and stress condition. Questionnaires were distributed to 120 participants with age range 18 to 23 years old. Data of participants showed that all of participants using a smart mobile phone and 24% of them have more than one cell phone. Time usage of cell phone is at least 1 hour. 23% of participants using a cell phone for social media activity, followed by 21% related to entertainment (music, video and games). The results showed a positive relationship between phantom vibration syndrome, sleep disorder and stress condition. Insomnia contributed a greater influence on stress condition. However, the phantom vibration syndrome is more directly affecting the sleep apnea compared to insomnia and stress condition. Therefore, the phantom vibration syndrome more affects stress condition indirectly, through sleep disorder (sleep apnea and insomnia). Consequently, phantom vibration syndrome has a strong relationship with stress condition at the time of the phantom vibration syndrome can cause sleep disorder.
Perancangan Sistem Manajemen Mutu Terintegrasi di Baristand Industri Padang Yudo Purnomo; Nilda Tri Putri; Elita Amrina
Jurnal Optimasi Sistem Industri Vol. 16 No. 2 (2017): Published in October 2017
Publisher : The Industrial Engineering Department of Engineering Faculty at Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (352.557 KB) | DOI: 10.25077/josi.v16.n2.p80-88.2017

Abstract

Baristand Industri Padang is an agency under control Ministry of Industry of Indonesia which it has a duty to serve the industries involving research activities, standardization and certification. To realize the programs, Baristand Industri Padang implemented a quality management system including ISO 9001, ISO/IEC 17025, ISO/IEC 17065, and KNAPPP 02. Nevertheless, it has been running separately. Therefore, quality of products not only proven by testing the final product, but also needed other evidence as a certificate that ensuring the quality of products. This research aims to design the Quality Management System for Baristand Industri Padang which it was implemented using life cycle methodology. Finding of this study revealed there was integration of ISO 9001, ISO/IEC 17025, ISO/IEC 17065, and KNAPPP 02 in the context of the structure of the process, documents, and organization. In the context of the structure of processes, it obtained four groups of primary process involving management, research and standardization, support, and improvement. Moreover, In terms of documentation, there was three levels of the document such as the document of strategic policy, quality guideline and procedures. While aspects of the organizational structure, the integration of quality management system required to develop the organizational structure that consist of Top Management, Technical Manager, Quality/Management Representative, Researcher and Administrative/Technical Staff. In addition, this study provided an integrated quality management information system including management of quality documents and quality records. Finally, the integrated quality management system and quality management information system has been designed to meet the expectations of the organization.
Pengukuran Beban Kerja Psikologis dan Fisiologis Pekerja di Industri Tekstil Prima Fithri; Windi Fitri Anisa
Jurnal Optimasi Sistem Industri Vol. 16 No. 2 (2017): Published in October 2017
Publisher : The Industrial Engineering Department of Engineering Faculty at Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (762.505 KB) | DOI: 10.25077/josi.v16.n2.p120-130.2017

Abstract

The development of manufacturing industries are growing rapidly along with the progress of time and the increasing sophistication of technology today, one of which is a manufacturing company engaged in the textile field is PT Unitex Tbk Bogor. PT Unitex Tbk Bogor is a company that processes raw materials into semi-finished and finished materials such as cotton processing up into yarn or fabric. The production process costs physiological and psychological workload which could harm an operator at each work station. The packing work station has the highest workload due to its heavy workload and worker fatigue. This study measures the psychological work load by employing NASA - TLX method. On the other side, for evaluating physiological workload, the pulse rate and body temperature of the operators are measured.
Sistem Peringatan Dini untuk Mendeteksi Lifetime Sparepart pada Mesin TR OSAWA Adi Nugroho; Yahri Nastangin
Jurnal Optimasi Sistem Industri Vol. 16 No. 2 (2017): Published in October 2017
Publisher : The Industrial Engineering Department of Engineering Faculty at Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1126.263 KB) | DOI: 10.25077/josi.v16.n2.p131-139.2017

Abstract

Maintenance is a very important activity to keep an equipment always at its best condition. This research aims to create an early warning system/ lifetime spare parts detector of Nissin Kogyo Batam (NKB)Company’sTR Osawa machine by adopting PLC (Programmable Logic Controller). PLC is used to automatically calculate the lifetime spare parts of TR Osawa machine. PLC will shut down the machine if it detects that lifetime spare parts have reached the specified setting standard (380-400 k pcs). As a result, PLC machine can provide more accurate results than manual counting.
Analisis Perawatan Mesin dengan Pendekatan RCM dan MVSM Dwi Agustina Kurniawati; Muhammad Lutfan Muzaki
Jurnal Optimasi Sistem Industri Vol. 16 No. 2 (2017): Published in October 2017
Publisher : The Industrial Engineering Department of Engineering Faculty at Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1194.228 KB) | DOI: 10.25077/josi.v16.n2.p89-105.2017

Abstract

Maintenance system at UMKM ED Aluminum Yogyakarta is using preventive and corrective maintenance program, but the implementation of this program still have many problems. The problem occurs because there is no maintenance system program and the company doesn’t have Standard Operational Procedure (SOP) in maintenance to overcome machine failures resulted in the increase of the downtime value. To cope the problems,  in this paper we used application of SOP and appropriate task maintenance selection using Maintenance Value Stream Map (MVSM) method supported by Reliability Centered Maintenance (RCM). Beside task selected among all products that have been produced, there is one machine that gives the biggest profit to the company. The product is feet infusion. Kondia milling machine is one of machines produces the feet infusion that has the longest downtime which was 17,75 hour during January 2016 until October 2016. RCM consist of Failure Mode Effect Analysis (FMEA), Pareto diagram, decision worksheet RCM, whereas the MVSM describes the maintenance activity. Based on Pareto analysis, the critical components on the Kondia milling machine were the magnetic contactor, relay, fuse, cutter, dynamo and bearing. The result of RCM decision worksheet proposed the appropriate action for the critical components cares. The Standard Operational Procedure (SOP) for the maintenance system on the operation of Kondia milling machine are suggested to the company for getting more significant outcome.
Cover & Preface - JOSI Vol. 16 (2) 2017 Hilma Raimona Zadry
Jurnal Optimasi Sistem Industri Vol. 16 No. 2 (2017): Published in October 2017
Publisher : The Industrial Engineering Department of Engineering Faculty at Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (914.719 KB)

Abstract

Perancangan Sistem Manajemen Mutu Terintegrasi di Baristand Industri Padang Yudo Purnomo; Nilda Tri Putri; Elita Amrina
Jurnal Optimasi Sistem Industri Vol. 16 No. 2 (2017): Published in October 2017
Publisher : The Industrial Engineering Department of Engineering Faculty at Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25077/josi.v16.n2.p80-88.2017

Abstract

Baristand Industri Padang is an agency under control Ministry of Industry of Indonesia which it has a duty to serve the industries involving research activities, standardization and certification. To realize the programs, Baristand Industri Padang implemented a quality management system including ISO 9001, ISO/IEC 17025, ISO/IEC 17065, and KNAPPP 02. Nevertheless, it has been running separately. Therefore, quality of products not only proven by testing the final product, but also needed other evidence as a certificate that ensuring the quality of products. This research aims to design the Quality Management System for Baristand Industri Padang which it was implemented using life cycle methodology. Finding of this study revealed there was integration of ISO 9001, ISO/IEC 17025, ISO/IEC 17065, and KNAPPP 02 in the context of the structure of the process, documents, and organization. In the context of the structure of processes, it obtained four groups of primary process involving management, research and standardization, support, and improvement. Moreover, In terms of documentation, there was three levels of the document such as the document of strategic policy, quality guideline and procedures. While aspects of the organizational structure, the integration of quality management system required to develop the organizational structure that consist of Top Management, Technical Manager, Quality/Management Representative, Researcher and Administrative/Technical Staff. In addition, this study provided an integrated quality management information system including management of quality documents and quality records. Finally, the integrated quality management system and quality management information system has been designed to meet the expectations of the organization.
Analisis Perawatan Mesin dengan Pendekatan RCM dan MVSM Dwi Agustina Kurniawati; Muhammad Lutfan Muzaki Muzaki
Jurnal Optimasi Sistem Industri Vol. 16 No. 2 (2017): Published in October 2017
Publisher : The Industrial Engineering Department of Engineering Faculty at Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25077/josi.v16.n2.p89-105.2017

Abstract

Maintenance system at UMKM ED Aluminum Yogyakarta is using preventive and corrective maintenance program, but the implementation of this program still have many problems. The problem occurs because there is no maintenance system program and the company doesn’t have Standard Operational Procedure (SOP) in maintenance to overcome machine failures resulted in the increase of the downtime value. To cope the problems, in this paper we used application of SOP and appropriate task maintenance selection using Maintenance Value Stream Map (MVSM) method supported by Reliability Centered Maintenance (RCM). Beside task selected among all products that have been produced, there is one machine that gives the biggest profit to the company. The product is feet infusion. Kondia milling machine is one of machines produces the feet infusion that has the longest downtime which was 17,75 hour during January 2016 until October 2016. RCM consist of Failure Mode Effect Analysis (FMEA), Pareto diagram, decision worksheet RCM, whereas the MVSM describes the maintenance activity. Based on Pareto analysis, the critical components on the Kondia milling machine were the magnetic contactor, relay, fuse, cutter, dynamo and bearing. The result of RCM decision worksheet proposed the appropriate action for the critical components cares. The Standard Operational Procedure (SOP) for the maintenance system on the operation of Kondia milling machine are suggested to the company for getting more significant outcome.

Page 1 of 2 | Total Record : 17


Filter by Year

2017 2017


Filter By Issues
All Issue Vol. 24 No. 1 (2025): Published in June 2025 Vol. 23 No. 2 (2024): Published in January 2025 Vol. 23 No. 1 (2024): Published in July 2024 Vol. 22 No. 2 (2023): Published in December 2023 Vol. 22 No. 1 (2023): Published in May 2023 Vol. 21 No. 2 (2022): Published in November 2022 Vol. 21 No. 2 (2022): Published in October 2022 Vol. 21 No. 1 (2022): Published in April 2022 Vol. 21 No. 1 (2022): Published in May 2022 Vol. 20 No. 2 (2021): Published in October 2021 Vol. 20 No. 2 (2021): Published in November 2021 Vol. 20 No. 1 (2021): Published in May 2021 Vol. 20 No. 1 (2021): Published in April 2021 Vol. 19 No. 2 (2020): Published in October 2020 Vol. 19 No. 2 (2020): Published in November 2020 Vol. 19 No. 1 (2020): Published in June 2020 Vol. 19 No. 1 (2020): Published in April 2020 Vol. 18 No. 2 (2019): Published in October 2019 Vol. 18 No. 2 (2019): Published October 2019 Vol. 18 No. 1 (2019): Published in May 2019 Vol. 18 No. 1 (2019): Published April 2019 Vol. 17 No. 2 (2018): Published in October 2018 Vol. 17 No. 1 (2018): Published in April 2018 Vol. 16 No. 2 (2017): Published in October 2017 Vol. 16 No. 1 (2017): The Improved JOSI is Published in May 2017 Vol. 16 No. 1 (2017): Published in May 2017 Vol. 15 No. 2 (2016): Published in November 2016 Vol. 15 No. 1 (2016): Published in March 2016 Vol. 14 No. 2 (2015): Published in 1st October 2015 Vol. 14 No. 2 (2015): Published in October 2015 Vol. 14 No. 1 (2015): Published in April 2015 Vol. 13 No. 2 (2014): Published in 1st October 2014 Vol. 13 No. 2 (2014): Published in October 2014 Vol. 13 No. 1 (2014): Published in April 2014 Vol. 12 No. 2 (2013): Published in 1st October 2013 Vol. 12 No. 1 (2013): Published in 1st April 2013 Vol. 12 No. 2 (2013): Published in October 2013 Vol. 12 No. 1 (2013): Published in April 2013 Vol. 11 No. 2 (2012): Published in 1st October 2012 Vol. 11 No. 1 (2012): Published in 1st April 2012 Vol. 11 No. 2 (2012): Published in October 2012 Vol. 11 No. 1 (2012): Published in April 2012 Vol. 10 No. 2 (2011): Published in 1st October 2011 Vol. 10 No. 1 (2011): Published in 1st April 2011 Vol. 10 No. 2 (2011): Published in October 2011 Vol. 10 No. 1 (2011): Published in April 2011 Vol. 9 No. 2 (2010): Published in 1st October 2010 Vol. 9 No. 1 (2010): Published in 1st April 2010 Vol. 9 No. 2 (2010): Published in October 2010 Vol. 9 No. 1 (2010): Published in April 2010 More Issue