Claim Missing Document
Check
Articles

Found 2 Documents
Search

PERFORMANCE ANALYSIS OF A RAILWAY LEVEL CROSSING UNDER MIXED TRAFFIC CONDITIONS IN BEKASI REGENCY, INDONESIA. Alfian Darmawan; Sri Nuryati; Elma Yulius; Ninik Paryati; Eko Darma; Fajar Prihesnanto; Anita Setyowati Srie Gunarti
Journal of Sustainable Civil Engineering (JOSCE) Vol. 8 No. 01 (2026): JOSCE: Journal of Sustainable Civil Engineering
Publisher : LPPM

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47080/josce.v8i01.4660

Abstract

This study contributes an integrated evaluation approach combining traffic performance analysis and user perception to support evidence-based decision making for the management and upgrading of railway level crossing under mixed traffic conditions
Identifikasi Faktor-Faktor Keterlambatan pada Proyek Konstruksi Repetitif Menggunakan Pendekatan Systematic Literature Review Lando Tambunan; Defri Aryanto; Anita Setyowati Srie Gunarti; Anasya Arsita Laksmi
Journal of Sustainable Civil Engineering (JOSCE) Vol. 8 No. 01 (2026): JOSCE: Journal of Sustainable Civil Engineering
Publisher : LPPM

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47080/josce.v8i01.4670

Abstract

This study identifies and analyzes delay factors specifically in repetitive construction projects, such as roads, high-rise buildings, and housing. Using the Systematic Literature Review (SLR) method via Publish or Perish (Google Scholar, ResearchGate, ScienceDirect), an initial pool of 1,674 studies was filtered down through systematic identification, screening, and eligibility stages to a final sample of 100 accredited articles (2015–2024). Thematic analysis categorized 53 identified delay factors into six main groups , with contractor-related issues emerging as the most dominant contributor (17 factors). The top three individual factors are material and equipment impacts (43%), delayed progress payments by owners (40%), and ineffective planning and scheduling (37%). Managing contractor operations and maintaining stable owner cash flows are critical to mitigating these delays. This study provides a foundational framework for stakeholders to enhance project efficiency in repetitive construction.