Muh. Natsir Abduh
Program Studi Teknik Sipil, Fakultas Teknik, Universitas Bosowa

Published : 3 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 3 Documents
Search

Tinjauan Waktu Pelaksanaan Pekerjaan Renovasi Gedung Rawat Inap RS Wahidin Sudirohusodo Makassar Dwi Fadli; Muh. Natsir Abduh; Savitri Prasandi Mulyani
Jurnal Penelitian Teknik Sipil Konsolidasi Vol. 4 No. 1 (2026): Jurnal Penelitian Teknik Sipil Konsolidasi, Januari 2026
Publisher : Program Studi Teknik Sipil Universitas Bosowa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56326/jptsk.v4i1.5068

Abstract

Construction projects are often faced with challenges in terms of managing time, costs and quality. This research discusses "A review of the time for the renovation work of the Wahidin Sudirohusodo Hospital Makassar Inpatient Building" which aims to identify activities that are on the critical path and the time duration used for the project. This research uses a type of quantitative research where the data used includes time schedule (Kuva S) and other project data. The method used in this research is the Critical Path Method (CPM). The CPM method can identify the critical path and provide a logical picture of the sequence of work and time required for each activity on the project. The research results show that by using the CPM method in the inpatient building renovation project at Wahidin Sudirohusodo Makassar Hospital, it is known that the critical path is in activities that have a total float value of 0 (zero). Based on calculations, the project's scheduled duration is 161 days, but after being analyzed using the CPM method, the project can be completed in 154 days. Thus, it can be seen after analyzing using the CPM method that the time comparison with the previously scheduled project duration is 7 days.
Pengaruh Keselamatan Dan Kesehatan Kerja K3 Dalam Pelaksanaan Pembangunan Pengembangan Bandar Udara Arung Palakka Bone Yudha Wira Sakti; Muh. Natsir Abduh; Ahmad Yauri Yunus
Jurnal Penelitian Teknik Sipil Konsolidasi Vol. 4 No. 2 (2026): Jurnal Penelitian Teknik Sipil Konsolidasi, Mei 2026
Publisher : Program Studi Teknik Sipil Universitas Bosowa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56326/jptsk.v4i2.6496

Abstract

This study aims to analyze the influence of the Occupational Health and Safety Management System (OHSMS) in the implementation of the Arung Palakka Bone Airport Development Project. The method used is multiple linear regression analysis to test the influence of the variables workload (X1), work capacity (X2), and work environment (X3) on OHS. The results show that all three variables significantly influence OHS, as evidenced by the t-statistic values for the variables being higher than the t-table value (2.036), with significance values for each variable being less than 0.05. Among the three variables, workload has the greatest impact on OHS implementation, with a t-statistic value of 10.485 and a significance value of 0.000. Based on these findings, it is recommended that contractors continue  to maintain and improve the implementation of OHS, even though the accident rate is relatively low. This is important because workplace accidents cannot be fully avoided, even though the OHSMS is effectively implemented, especially due to the risks associated with heavy equipment use and working at heights. Therefore, it is crucial for individuals to remain vigilant regarding potential accidents, as accidents often occur when we are complacent. Occupational Health and Safety is an essential method for improving performance, productivity, and preventing losses due to workplace accidents.
Pengaruh Manajemen Keselamatan Dan Kesehatan Kerja (K3) Pada Produktivitas Pelaksanaan Pembangunan Rumah Sakit Primaya Hertasning Makassar: Rumah Sakit Primaya Hertasning Makassar Muh. Arham; Muh. Natsir Abduh; Nurhadija Yunianti
Jurnal Penelitian Teknik Sipil Konsolidasi Vol. 4 No. 2 (2026): Jurnal Penelitian Teknik Sipil Konsolidasi, Mei 2026
Publisher : Program Studi Teknik Sipil Universitas Bosowa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56326/jptsk.v4i2.6701

Abstract

The construction industry carries a high risk of workplace accidents, making the implementation of Occupational Health and Safety (OHS) management essential to maintain labor productivity. This study aims to analyze the influence of work environment, the use of personal protective equipment (PPE), and work experience on labor productivity in the construction project of Primaya Hertasning Hospital, Makassar. The research employed a quantitative method with a descriptive approach. Primary data were collected through observation, interviews, and questionnaires distributed to 52 respondents representing various professions in the project. Data analysis included validity, reliability, normality, multicollinearity, and heteroscedasticity tests, as well as multiple linear regression analysis, F-test, and t-test using SPSS version 24. The findings show that simultaneously, work environment, PPE, and work experience significantly affect productivity, with a coefficient of determination (R²) of 56.2%. Partially, each of these independent variables also has a positive effect on productivity. These results highlight the importance of effective OHS management, particularly in providing adequate PPE, improving the quality of the work environment, and enhancing workers’ skills through experience. Optimal implementation of OHS is expected to reduce the risk of accidents and improve overall worker performance, thereby contributing to the successful completion of construction projects.