Ahmad Yauri Yunus
Program Studi Teknik Sipil, Fakultas Teknik, Universitas Bosowa

Published : 3 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 3 Documents
Search

Analisis Pengaruh Keselamatan Dan Kesehatan Kerja (K3) Terhadap Produktivitas Kerja Pada Pekerjaan Pengembangan Bandar Udara Internasional Sultan Hasanuddin Makasar Monica Monica; M. Natsir Abduh; Ahmad Yauri Yunus
Jurnal Penelitian Teknik Sipil Konsolidasi Vol. 4 No. 1 (2026): Jurnal Penelitian Teknik Sipil Konsolidasi, Januari 2026
Publisher : Program Studi Teknik Sipil Universitas Bosowa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56326/jptsk.v4i1.4719

Abstract

The airport is one of the large-scale construction projects that creates unique challenges related to K3 management, since 2019 it has continued construction and will continue development in May 2023. There is a positive influence between the workload variable on occupational safety and health with a value of 0.351, the work knowledge variable also has a positive effect on occupational safety and health with a value of 0.341, and the last variable work environment also has a positive effect on occupational safety and health with a value of 0.294. The workload variable has a positive effect on work productivity with a value of 0.408, the work knowledge variable has a positive effect on work productivity with a value of 0.252, the work environment variable has a positive effect on productivity with a value of 0.255 and the last variable work safety and health also has a positive effect on productivity with a value of 0.345. There is a positive influence between the workload variable on work productivity through safety and health with a value of 0.121, the work knowledge variable has a positive influence on work productivity through safety and health with a value of 0.117 and the work environment variable has a positive influence on work productivity through occupational safety and health with a value 0.101.
Analisis Kemacetan Kota Makassar Dengan Menata Ruang Parkir Jalan Suriadi Suriadi; H. Abd. Rahim Nurdin; Ahmad Yauri Yunus
Jurnal Penelitian Teknik Sipil Konsolidasi Vol. 4 No. 1 (2026): Jurnal Penelitian Teknik Sipil Konsolidasi, Januari 2026
Publisher : Program Studi Teknik Sipil Universitas Bosowa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56326/jptsk.v4i1.4759

Abstract

This research ,highlight traffic jam problem that in the city of Makassar , especially pengayoman road Panakkukang .the traffic that because parking activity in the road which reduce effective traffic lanes, disrupting the smooth flow of traffic with rapid economic growth in Makassar increase traffic  movement is unavoidable which further worsen traffic jam condition the aim of this research is to analyze the impact of in the street parking on traffic performance to provide parking control solution in the area they used metode involves direct observation of three different points on the pengayoman road section with data collected including traffic volume ,parking and performance of the road section ,observation were Carrie out on Wednesday ,Saturday and Sunday to get more comprehensive picture the result of the research showed that the highest volume of traffic flow on the pengayoman road section reached 6864 the  Passengers car unit per hour (per hour) with degree of saturation (DS) of 0,77 the service level indeks shows category D ,which indicate an unstable level of service and category A for the highest level of service and these result can be concluded that parking activities on the road significantly reduce road capacity which has a negative impact on performance at the location.
Studi Penerapan Manajemen Konstruksi Pada Proyek Pembangunan Jalan Akses Tol Makassar New Port Suciati Pratiwi; M. Natsir Abduh; Ahmad Yauri Yunus
Jurnal Penelitian Teknik Sipil Konsolidasi Vol. 4 No. 1 (2026): Jurnal Penelitian Teknik Sipil Konsolidasi, Januari 2026
Publisher : Program Studi Teknik Sipil Universitas Bosowa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56326/jptsk.v4i1.5062

Abstract

Construction management encompasses managing the planning, organizing, implementing, and supervising phases of a project to achieve optimal results in terms of time, cost, and quality. In the Makassar New Port Toll Access Road construction project, several challenges were identified, including mismatches between rebar connections and working drawings, delays in material deliveries, and concrete slump values that did not meet specifications. This study aims to determine the variables influencing the effective implementation of construction management in this project. Data were gathered using questionnaires distributed to 36 respondents and analyzed for validity and reliability with the Statistical Product and Service Solution program. The Relative Importance Index method was utilized to assess the impact of each variable. The findings revealed that supervision was the most influential variable, achieving the highest Relative Importance Index value of 0.97. This underscores the critical role of supervision in managing project activities, preventing deviations, and reducing the risk of construction failures