Claim Missing Document
Check
Articles

Found 2 Documents
Search

Optimalisasi Pelaksanaan Abandon Ship Drill untuk Meningkatkan Kecakapan para Kru Kapal ketika Terjadi Situasi Darurat Dimas Surya Wicaksono; Ngurah Ade Dwi Putra Yuda; Jaka Septian Kustanto; Fazri Hermanto
Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim Vol. 5 No. 2 (2026): Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim
Publisher : Fakultas Teknik Universitas Maritim AMNI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58192/ocean.v5i2.4418

Abstract

Safety of life at sea is a crucial aspect in merchant vessel operations, making crew readiness in facing emergency situations extremely important. One effort to improve this readiness is through the implementation of abandon ship drills. However, in practice, drill implementation is often not fully effective in developing crew competence. This study aims to analyze crew readiness in conducting abandon ship drills and evaluate the extent to which drill implementation has been optimal in enhancing crew competence when facing emergency situations on MV. CNC TIGER. This research uses a descriptive qualitative method with data collection techniques including direct observation, interviews with the chief officer and third officer, and documentation studies. The data obtained were analyzed using gap analysis by comparing the practice of abandon ship drill implementation on MV. CNC TIGER with international regulations SOLAS 1974 Chapter III Regulation 19. The results showed that crew readiness in conducting abandon ship drills falls into the adequate category but is not yet optimal. Although drill frequency has met SOLAS requirements, crew response to emergency alarms remains slow, understanding of duties according to the muster list has not been fully mastered, and lifeboat launching has not been carried out according to established standards. Additionally, drill implementation tends to be administrative and lacks realism, thus failing to maximize crew competence development. Therefore, optimization of abandon ship drill implementation is needed through improved training quality, scenario realism, officer leadership, and continuous evaluation to enhance crew readiness and safety.
Implementasi Planned Maintenance System Hatch Cover di Kapal MV. Ultra Cory Muhammad Hendra Kusuma Hadi; Fazri Hermanto; Nanang Basuki; Arleiny Arleiny
Globe: Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan Vol. 4 No. 4 (2026): November: Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/globe.v4i4.1805

Abstract

Hatch Cover is an important component in bulk vessels with a function as a cargo protection in the hatch from seawater and other external factors. HatchCover maintenance  should ideally be carried out through the Planned Maintnance System (PMS) in accordance with Resolution MSC.169(79) Standard for Owners' Inspection and Maintnance of BulkCarrier HatchCovers. However, during the implementation of marine practices on MV. Ultra Cory on December 20, 2024–December 23, 2025, damage was still found to some components of the Hatch Cover, which indicates that the implementation of PMS was not carried out optimally. This study aims to analyze the application of PMS Hatch Cover and factors that can influence its implementation on board. The method used is qualitative descriptive with data collection through observation, interviews, and documentation. Data analysis is carried out through data reduction, data presentation, and conclusion drawn.  The results of the study show that the implementation  of the Planned Maintenance System has not been carried out optimally due to delays in the implementation of maintenance schedules, lack of optimal supervision of hatch cover conditions, and limited availability of spare parts. This condition causes several hatch cover components  to suffer a decrease in function, potentially disrupting the smooth operation of the ship. This study concludes that the consistent implementation  of the Planned Maintenance System according to procedures, supported by continuous supervision and the availability of adequate spare parts, is able to increase the reliability of the hatch cover and support the safety and smooth operation of the ship.