Claim Missing Document
Check
Articles

Found 3 Documents
Search

The Influence of Semi-Rigid Connection Stiffness on the Seismic Response of a Four-Story Steel Modular Box Building: Influence of Semi-Rigid Connection Stiffness on the Seismic Response of a Four-Story Steel Modular Box Building Iqbal Firmansyah JP; Yuyun Tajunnisa; Nur Ahmad Husin
IPTEK The Journal of Engineering Vol. 12 No. 2 (2026)
Publisher : Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/j28075064.v12i2.10584

Abstract

Steel modular buildings rely on inter-module connections to transfer lateral forces and maintain global stability. However, treating these connections as fully rigid may overestimate structural stiffness and underestimate story drift. This study evaluates the effect of measured connection flexibility on the seismic response of a four-story modular box building. A three-dimensional global model was developed in ETABS, while the rotational stiffness of the existing bolted bracket connection was obtained from a detailed finite-element model and represented as panel-zone rotational springs. The secant rotational stiffness was 2,190.16 kN·m/rad for a continuous-column joint and 1,095.08 kN·m/rad for top and bottom joints. The stiffness classification indicated that the existing connection behaved as a simple-to-partially restrained connection rather than a fully restrained moment connection. When the connection stiffness was included in the global model, the maximum column demand-to-capacity ratio reached 1.048 and the amplified interstory drift ratio reached 0.0269, exceeding the adopted limits of 1.00 and 0.02, respectively. The results demonstrate that realistic connection stiffness should be incorporated in the global analysis of modular steel buildings and that strengthening is required before the connection can be relied upon as part of the seismic-force-resisting system.
Comparative Seismic Response of a Hospital Building Equipped with Lead Rubber and Friction Pendulum Bearings: Comparative Seismic Response of a Hospital Building Equipped with Lead Rubber and Friction Pendulum Bearings Yuyun Tajunnisa; Madindi Hirang; Mohamad Khoiri
IPTEK The Journal of Engineering Vol. 12 No. 2 (2026)
Publisher : Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/j28075064.v12i2.10596

Abstract

Hospitals in active seismic regions must maintain structural safety and operational continuity after strong earthquakes. This study compares the seismic response of the Anutapura Medical Center hospital building in Palu using three support configurations: a conventional fixed base, lead rubber bearings (LRBs), and friction pendulum bearings (FPBs). A three-dimensional structural model was developed in ETABS using the as-built geometry, material properties, gravity loads, and seismic parameters prescribed by Indonesian standards. The isolated models incorporated nonlinear bearing properties obtained from the isolator design and numerical characterization. Fundamental period, lateral displacement, interstory drift ratio, horizontal seismic force, and base shear were used as comparative indicators. The fixed-base fundamental period of 1.528 s increased to 2.869 s with LRB and 2.588 s with FPB. At the base level, LRB reduced the base shear by 60.51% in the X direction and 60.89% in the Y direction, whereas FPB achieved reductions of 55.25% and 55.97%, respectively. FPB produced the smaller roof displacement, with reductions of 17.98% in X and 22.50% in Y relative to the fixed-base model; the corresponding LRB reductions were 14.44% and 17.18%. The results indicate a clear performance trade-off: LRB is preferable when reducing seismic force demand is the governing objective, while FPB provides better displacement control. These findings support performance-based selection of isolation systems for essential facilities in high-seismicity areas.
Condition and Durability Evaluation of Reinforced-Concrete Bridge Girders in the Surabaya Container Terminal Environment Rif'at Arya Samboga; Afif Navir Refani; Yuyun Tajunnisa; Harun Al Rasyid; Adriyan Candra Purnama
IPTEK The Journal of Engineering Vol. 12 No. 2 (2026)
Publisher : Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/j28075064.v12i2.10678

Abstract

An access bridge at PT Terminal Petikemas Surabaya has operated since 1992 in a chloride-bearing marine environment and carries repetitive heavy operational vehicles. The reinforced-concrete girders were repaired by epoxy injection and strengthened with carbon-fibre-reinforced polymer between 2010 and 2014; however, cracks were identified again in 2021. This study evaluates the existing condition and durability of the girders by integrating repair-history review, visual inspection and crack mapping, concrete core testing, rebound-hammer testing, reinforcement detection, half-cell potential measurements, and chloride-based service-life analysis. Seven 93-mm-diameter cores produced equivalent standard-cylinder compressive strengths of 51.33–59.31 MPa, with a mean of 54.74 MPa and a coefficient of variation of 5.20%, while the average rebound-hammer estimate was 62.02 MPa. The average concrete cover of the girders was 60 mm. Half-cell potentials were generally more positive than −200 mV, indicating a low probability of active corrosion at the time of testing. The apparent chloride diffusion coefficient for the girders was 1.77 × 10−8 cm²/s, yielding a nominal corrosion-initiation time of 21.12 years under the adopted assumptions. Although the measured core strengths exceeded the conservative 50 MPa value adopted in structural checks, recurrent cracking remained evident. The integrated diagnosis therefore indicates that the observed cracking is more plausibly associated with continuing structural demand, previously active cracks, reduced cracked-section stiffness, or uncertain CFRP bond effectiveness than with generalised low concrete strength or widespread active corrosion. A risk-based maintenance framework is proposed, prioritising quantitative crack monitoring, verification of CFRP bond condition, repeated electrochemical assessment, and control of heavy vehicle operations.