Riska Shanila Hamzah Hamzah
Universitas Muhammadiyah Sidoarjo

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Keropi Modular Chair Facility Layout Planning: Perencanaan Tata Letak Fasilitas Kursi Modular Keropi M. Lutfi Mahfudzi Mahfudzi; Riska Shanila Hamzah Hamzah; Dhimaz Erlangga D. S. Erlangga; M. Hafid Apriza Apriza; Ainur Rofiq Rofiq; Atikha Sidhi Cahyana
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/zbnqhf85

Abstract

General Background Manufacturing operations rely on disciplined facility layout planning to coordinate material movement and keep production workflows organized across workstations. Specific Background In producing the Keropi modular chair during the Facility Layout Practicum, components such as wooden blocks, wooden boards, and iron bolts move across raw material storage, measuring, cutting, smoothing, assembly, painting, and finished goods storage. Knowledge Gap Practicum layout plans for modular chair fabrication require structured proximity and flow analysis connecting workstation relationships, movement volumes, and computer-aided layout generation. Aims This study evaluates and designs a facility layout for the Keropi modular chair production workflow using an Activity Relationship Chart, an Activity Relationship Diagram, a From-To Chart, and BLOCPLAN software. Results Proximity and flow evaluation across seven departments generated a BLOCPLAN layout with a score of 0.80, separating raw material and finished goods storage while keeping sequential measuring, cutting, smoothing, and assembly stations close together, with Trial 1 recording 1,800 total handling volume and IDR 4,096,291 total cost. Novelty The study combines proximity ratings, movement volume and cost matrices, and BLOCPLAN layout generation specifically for multi-part Keropi modular chair manufacturing. Implications Layout planners can organize sequential work areas and separate initial and final storage zones to reduce travel distance, limit material handling costs, and curb workflow congestion. Key Findings Highlights Proximity ratings and layout generation separate raw material and finished goods storage while placing measuring, cutting, smoothing, and assembly stations near one another, Initial flow tabulations across seven departments record 1,800 total handling volume and IDR 4,096,291 in total movement cost, Spatial dimensions and length-to-width ratios support linear progression across sequential fabrication stations Keywords Facility Layout, Activity Relationship Chart, From To Chart, Modular Chair, Material Handling
Analysis of Potential Failures in Inspection Equipment and Logistics Administration Processes Using the Failure Mode and Effects Analysis Method: Analisis Potensi Kegagalan Peralatan Inspeksi dan Proses Administrasi Logistik Menggunakan Metode Failure Mode and Effects Analysis Riska Shanila Hamzah Hamzah; Inggit Marodiyah
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/pm8mnq21

Abstract

General Background Inspection and testing service providers rely on operational equipment and logistics administration to deliver accurate evaluations. Specific Background At PT XYZ Indonesia, irregular logistics procedures and potential failures in primary and supporting inspection tools create operational risks that threaten measurement accuracy and service continuity. Knowledge Gap Prior studies often address equipment reliability or administrative workflows separately rather than evaluating both alongside risk prioritization across inspection devices and logistics handling. Aims This study identifies potential failure modes in inspection tools and logistics administration at PT XYZ Indonesia using Failure Mode and Effects Analysis (FMEA) supported by 5W1H problem mapping, ranks risks via Risk Priority Number (RPN), and formulates improvement recommendations. Results Evaluation of 20 inspection items shows that magnetic yoke (RPN 240), calibration certificate documentation (RPN 240), survey meter (RPN 210), and ultrasonic flaw detector Epoch 650 (RPN 180) carry the highest risk scores, driven by component degradation, off-hours returns without verification, and unstandardized recordkeeping. Novelty This work jointly examines 20 inspection tools—spanning electronic, magnetic, mechanical, and safety items—and logistics administration workflows from issuance to return within a single FMEA assessment. Implications Implementing scheduled calibration, component maintenance, standardized forms, and centralized calibration records can lower RPN values and support more dependable inspection operations. Key Findings Highlights Magnetic yoke and calibration documentation record the highest risk scores, showing that both physical tool wear and administrative gaps drive operational risk. Electronic and magnetic testing devices exhibit higher failure priorities than simpler mechanical or auxiliary items due to sensor, battery, and signal vulnerabilities. Unstandardized loan and return routines, including off-hours handovers without verification, contribute to data mismatches and unreliable records. Keywords Failure Mode and Effects Analysis, Risk Priority Number, Inspection Equipment, Logistics Administration, Calibration Documentation