Dhimaz Erlangga D. S. Erlangga
Universitas Muhammadiyah Sidoarjo

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Keropi Modular Chair Facility Layout Planning: Perencanaan Tata Letak Fasilitas Kursi Modular Keropi M. Lutfi Mahfudzi Mahfudzi; Riska Shanila Hamzah Hamzah; Dhimaz Erlangga D. S. Erlangga; M. Hafid Apriza Apriza; Ainur Rofiq Rofiq; Atikha Sidhi Cahyana
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/zbnqhf85

Abstract

General Background Manufacturing operations rely on disciplined facility layout planning to coordinate material movement and keep production workflows organized across workstations. Specific Background In producing the Keropi modular chair during the Facility Layout Practicum, components such as wooden blocks, wooden boards, and iron bolts move across raw material storage, measuring, cutting, smoothing, assembly, painting, and finished goods storage. Knowledge Gap Practicum layout plans for modular chair fabrication require structured proximity and flow analysis connecting workstation relationships, movement volumes, and computer-aided layout generation. Aims This study evaluates and designs a facility layout for the Keropi modular chair production workflow using an Activity Relationship Chart, an Activity Relationship Diagram, a From-To Chart, and BLOCPLAN software. Results Proximity and flow evaluation across seven departments generated a BLOCPLAN layout with a score of 0.80, separating raw material and finished goods storage while keeping sequential measuring, cutting, smoothing, and assembly stations close together, with Trial 1 recording 1,800 total handling volume and IDR 4,096,291 total cost. Novelty The study combines proximity ratings, movement volume and cost matrices, and BLOCPLAN layout generation specifically for multi-part Keropi modular chair manufacturing. Implications Layout planners can organize sequential work areas and separate initial and final storage zones to reduce travel distance, limit material handling costs, and curb workflow congestion. Key Findings Highlights Proximity ratings and layout generation separate raw material and finished goods storage while placing measuring, cutting, smoothing, and assembly stations near one another, Initial flow tabulations across seven departments record 1,800 total handling volume and IDR 4,096,291 in total movement cost, Spatial dimensions and length-to-width ratios support linear progression across sequential fabrication stations Keywords Facility Layout, Activity Relationship Chart, From To Chart, Modular Chair, Material Handling