Siti Asiyah
universitas sultan ageng tirtayasa

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Analysis of Calculations for Concrete Volume, Costs, and Time between Manual Calculation Methods and Building Information Modeling (BIM) (Case Study: Construction of the South Tangerang City Population and Civil Registration Office Building) Azyumarni Azra Hanifah; Siti Asiyah; Rifky Ujianto; Dwi Novi Setiawati; Mush'ab 'Abdu Asy Syahid
Jurnal Fondasi Vol 15, No 2 (2026)
Publisher : Universitas Sultan Ageng Tirtayasa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.62870/fondasi.v15i2.43598

Abstract

Technological advancements in the construction sector have pro-gressed rapidly, particularly with the advent of Building Information Modeling (BIM). This study aims to compare the results of manual analysis and Building Information Modeling (BIM) in terms of con-crete volume, cost, and construction time. The case study for this research is the construction project of the Disdukcapil office build-ing, with a building area of 11.52 m². The scope of the study covers the columns, beams, and slabs from the 1st to the 7th floors, along with two roof areas. The analysis results show that the concrete vol-ume requirement calculated manually is 2,418.569 m³, while the result using Building Information Modeling (BIM) is 2,234.060 m³. The cost calculation yielded Rp44,587,548,079.73 using the manual method and Rp43,829,308,516.00 using the Building Information Modeling (BIM) method. The time analysis showed the same dura-tion, namely 98 days. Although the duration of implementation was the same, the use of Autodesk Navisworks in the Building Infor-mation Modeling (BIM) method produced a timeline as well as 4D and 5D visualizations for real-time simulation of the construction sequence. Based on this study, the use of the Building Information Modeling (BIM) method is more efficient than the manual method because it optimizes concrete volume calculations and reduces pro-ject costs. Additionally, Building Information Modeling (BIM) of-fers advantages in planning efficiency through visualization and simulation of the construction sequence.