Pemodelan dan Perhitungan Kembali Rencana Anggaran Biaya (RAB) Gedung UKM FISIP Tahap 2 Universitas Lampung Berbasis Teknologi Building Information Modelling (BIM) Farabi, Muhammad Al; Husni, Hasti Riakara; Siregar, Amril Maruf; Bayzoni, Bayzoni
Jurnal Rekayasa Sipil dan Desain Vol. 11 No. 2 (2023): Edisi Juni 2023
Publisher : Universitas Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23960/jrsdd.v11i2.3139

Abstract

The rapid development that occurs in the construction sector is important because the construction sector is an important part of the development of a country. The rapid development and high level of project complexity require construction service providers to work more effectively and efficiently. Currently, the development of technology and communication science is able to answer these problems, one of which is by using Building Information Modeling (BIM), which facilitates a more integrated design and construction process in order to obtain efficient results. Stages of research methodology: 1) Preparatory stage; 2) Data collection stage; 3) 3D modelling stage with Autodesk Revit; 4) Clash Check examination stage; 5) Stage of releasing work volume; 6) Stage of preparing The Cost Budget Plan (RAB); 7) Stage of drawing conclusions and presenting results. Overall, the total price difference between the total price using the total volume of work contained in the Bill of Quantity (BoQ) results in a greater total price than using the total volume of work produced by Autodesk Revit, with the following indicators: There is a calculation error in the form of human error in the process of preparing the RAB using the total volume of work contained in the BoQ by planning consultants, such as material double-count errors. From this research, it can be concluded: 1) Modeling with Autodesk Revit greatly speeds up planning work because it is very complex to be applied to various construction projects; 2) The use of BIM is very efficient due to the full-integrity facility; and 3) Output volume issued can minimize human error in calculating work volume manually. Minimizing human error greatly affects the contractor's profit.
Kajian Implementasi Rencana Mutu Kontrak pada Proyek Irigasi Berdasarkan Metode Analisis Deskriptif Paramitha, Thifal Ayu; Usman, Kristianto; Siregar, Amril Maruf
Jurnal Rekayasa Sipil dan Desain Vol. 11 No. 4 (2023): Edisi Desember 2023
Publisher : Universitas Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23960/jrsdd.v11i4.3697

Abstract

Project quality management is a process to keep the project still fulfilled the quality level based on the demand or plan. Quality Plan Agreement is Quality Management System document that is very important in construction project. This research’s aims are to assess the quality implementation level based on Descriptive Analysis Method on Upgrading Irigation Area Project Way Sekampung, Ground Sub-Job. Primary data is obtained by providing questionnaries within 39 questions to 8 respondents and secondary data is obtained by observation and documentation in project site. Descriptive Analysis obtaining 51,28% respondents answer Good; 27,56% respondents answer Very Good; 16,67% respondents answer Acceptable; 4,17% respondents answer Not Good; and 0,32% respondents answer Very Not Good.