Claim Missing Document
Check
Articles

Found 3 Documents
Search
Journal : Industrial

PENERAPAN METODE DMAIC UNTUK PENGENDALIAN STOK OPNAME DI PT RAPI TRANS LOGISTIK INDONESIA Candra, Jason Jeremy; Dewantoro, Albertus Daru
Industrial & System Engineering Journals (ISEJOU) Vol. 3 No. 2 (2025): ISEJOU, Vol 3, No 2 Juni 2025
Publisher : Universitas Katolik Darma Cendika

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37477/isejou.v3i2.784

Abstract

Ketidaksesuaian data spare part antara stok sistem dan stok fisik di PT Rapi Trans Logistik Indonesia menjadi permasalahan yang dapat mengganggu efisiensi operasional gudang. Penelitian ini bertujuan untuk mengidentifikasi faktor penyebab utama masalah tersebut dan memberikan usulan perbaikan yang dapat diterapkan secara efektif. Berdasarkan analisis yang dilakukan, ditemukan bahwa faktor manusia, seperti pengambilan spare part tanpa mencatat permintaan dan pengembalian barang yang tidak dilakukan, merupakan penyebab utama. Selain itu, kurangnya sistem pemantauan penggunaan spare part secara real-time dan tata letak penyimpanan yang tidak terorganisasi turut berkontribusi pada ketidaksesuaian data stok. Usulan perbaikan yang diajukan meliputi penerapan sistem manajemen gudang berbasis digital untuk mencatat pergerakan spare part secara real-time, penegakan kepatuhan terhadap SOP yang telah ditetapkan, pelaksanaan audit stok secara berkala, dan penataan ulang penyimpanan spare part agar lebih terstruktur. Tahap pengendalian dilakukan dengan pengawasan terhadap implementasi perbaikan, pelaporan aktivitas gudang secara berkala, serta penggunaan sistem peringatan dini untuk mendeteksi anomali stok Dengan menerapkan langkah-langkah tersebut, diharapkan ketidaksesuaian data spare part dapat diminimalkan, sehingga akurasi manajemen stok dan efisiensi operasional gudang dapat meningkat. Kata Kunci: Ketidaksesuaian data, spare part, manajemen stok, SOP, audit stok, sistem digital,efisiensi operasional.
Perancangan Sistem Pendukung Monitoring Kinerja Program Studi Dengan Metode Balanced Scorecard Studi Kasus: Prodi Di Fakultas Teknik UKDC Dewantoro, Albertus Daru; Riyanto, Nehemia Dwi April; Christiano, Antonius Yan Sheva; Kumaladewi, Citra Rahayu
Industrial & System Engineering Journals (ISEJOU) Vol. 1 No. 1 (2022): ISEJOU Vol.1 No.1 Desember 2022
Publisher : Universitas Katolik Darma Cendika

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37477/isejou.v1i1.398

Abstract

The activity of implementing the performance evaluation of study programs in tertiary institutions aims to improve internal quality in a sustainable manner. The performance evaluation process requires a gradual process, namely the performance monitoring process. Evaluation and monitoring of study program performance are generally implemented in the implementation of education, research, and community service to improve study program performance. Therefore, the priority of the main performance indicators of study programs in the Faculty of Engineering is determined by referring to the Chancellor's Regulation No. 03/PR/2022, classifies the main performance indicators of the Faculty of Engineering study program based on the dimensions of the balanced scorecard, and designs a work program monitoring spreadsheet to support KPI achievement. The research also aims to identify KPIs in four stages: customer perspective, financial perspective, business process perspective, and learning and growth perspective. The University has prioritized the 1st, 2nd, 4th, 6th and 7th performance indicators. Regulation of the Dean of the Faculty of Engineering No. 143/UKDC.1/A.01/XI/2022 as a reference in setting KPIs, this document has succeeded in formulating 22 main performance indicators and 5 additional performance indicators. Prioritized performance indicators are then made into a spreadsheet-based performance form which is useful in implementing performance monitoring
Evaluasi Efektivitas Strategi 5S dalam Meningkatkan K3 di Lingkungan Kerja: Studi Kasus pada PT Manakarra Unggul Lestari Dewantoro, Albertus Daru; Permatasari, Prahesti Jihan
Industrial & System Engineering Journals (ISEJOU) Vol. 2 No. 2 (2024): ISEJOU, Vol 2, No 2 Juni 2024
Publisher : Universitas Katolik Darma Cendika

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37477/isejou.v2i2.565

Abstract

This study focuses on improving occupational safety and health (OSH) at PT Manakarra Unggul Lestari, a company engaged in palm oil plantation and processing, through the implementation of the 5S method. The analysis primarily examines the Shitsuke (Discipline) aspect, which was found to have the lowest score with an average of 3.092. The objective of this research is to enhance OSH standards within the company by implementing clear steps in Seiri, Seiton, Seiso, Seiketsu, and Shitsuke, supported by Safety measures. Observations were conducted before and after implementation using the 5S and Safety Checklist developed by Todd MacAdam. The results indicate a positive impact of 5S and Safety activities on improving OSH standards, reflected in increased employee discipline and significant changes. Fishbone analysis was also employed to identify key issues within the company, enabling more targeted improvement efforts. This study makes a significant contribution to enhancing OSH in palm oil plantation and processing environments, concluding that the implementation of 5S and Safety can foster a safer work culture and improve employee well-being, aligning with higher OSH standards.