Nainggolan, Devi Julietta
Unknown Affiliation

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : IJIES (International Journal of Innovation in Enterprise System)

Performance Assessment Based on Reliability of Weaving M251 Machine Using Reliability, Availability & Maintainability (RAM) and Cost of Unreliability (COUR) Methods (Case Study at PT Buana Intan Gemilang) Nainggolan, Devi Julietta; Alhilman, Judi; Supratman, Nurdinintya Athari
International Journal of Innovation in Enterprise System Vol. 1 No. 1 (2017): International Journal of Innovation in Enterprise System
Publisher : School of Industrial and System Engineering, Telkom University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The textile industry is one of industries that has an important role in the national economy. PT Buana Intan Gemilang (BIG) is one of textile industry in Indonesia which uses Weaving machine to produce motif and sajadah fabrics. The purpose of this research is to analyze the reliability of Weaving M251 machine that has the most damage in 2014. To avoid losses due to machine damage, the reliability, availability and maintainability of the machine need to be improved by using Reliability, Availability & Maintainability (RAM) Analysis method. In addition, the total cost caused by RAM problems can be calculated by using Cost of Unreliability (COUR) method. Based on the evaluation using Reliability Block Diagram (RBD) modeling, it is found that the critical subsystem reliability = 44.36% for 144 working hours and the total repair time that the critical subsystem needs to perform in acceptable operational condition , at least in 1 to 70 hours. There are two different forms of availability that have been calculated, therefore inherent availability = 95,546% which is used as leading indicator, and operational availability = 85,572% which used as lagging indicator. as it is compared, lagging indicator does not meet the performance of leading indicator. The total of unreliability cost when the machine is in active repair time = 39,580,689.02 IDR and within downtime = 135,588,452.13 IDR. Keywords—Cost of Unreliability (COUR), Lagging Indicator, Leading Indicator, Reliability, Availability & Maintainability (RAM) Analysis.
Money Back Warranty on Pricing in Dual Channel Supply Chain (Case Study : Garlick Store Surabaya) Nainggolan, Devi Julietta; Alhilman, Judi; Supratman, Nurdinintya Athari; Nuha, Hilyatun; Karunia Wati, Putu Eka Dewi
International Journal of Innovation in Enterprise System Vol. 2 No. 1 (2018): International Journal of Innovation in Enterprise System
Publisher : School of Industrial and System Engineering, Telkom University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The development of internet brings great influence in business management, especially in supply chain. Transaction conducted through the internet in supply chain known e-fulfillment, is an integrated process from receiving customer order, managing transaction, warehousing, managing transportation, communicating, with customer using media of information technology. Online sales concept opens up the researchers to conduct research on online sales and offline sales simultaneously, known Dual Channel Supply Chain (DCSC). One category of products that are sold using this structure is fashion product. However, selling fashion product using DCSC structure it still has shortcomings and challenges. Due to customer can not make a selection, viewing and researching product and quality inspaction product dierctly. Based on this, some enterprises provide product warranty sales system offered. Warranty as a guarantee given to customer to provide security and comfort for making purchases. Warranty gives impact on price of product, both online and offline. This leads to the need to do a calculation the optimum price considering money back warranty. Optimum price obtained in the model demand function using quadratic programming adressing the objective function in the form profit maximum in individual channel (Pw, Ps dan Po) as well as whole profit in DCSC by considering the value of money back warranty (g). The result obatained is optimum price for two scenarios. There are optimum price in individual channel without money back warranty and optimum price in online channel with accomodate money back warranty. Keywords—dual channel supply chain (DCSC); money back warranty; optimization.