Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : Infotekmesin

Analisa Prestasi Pembangkit Listrik Tenaga Uap (PLTU) Berbahan Bakar BatuBara Hasil Upgrading Deni Mulyadi, Cecep; Kristyadi, Tarsisius; Putra, Alexin; Rusirawan, Dani
Infotekmesin Vol 12 No 1 (2021): Infotekmesin: Januari 2021
Publisher : P3M Politeknik Negeri Cilacap

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35970/infotekmesin.v12i1.370

Abstract

Coal is a cheap fuel, so it is widely used by steam power plants (PLTU). With many PLTUs using coal, the demand for coal  increases and the quality of the coal is decreasing and the price continues to rise. With this problem, it is necessary to improve  coal quality, one of which is by upgrading using a gas exhaust boiler. With using rotary dryer, the coal will be upgraded from low calorie to high calorie by reducing the moisture content, which will then be applied to the tempo cycle software 5.1. After application at cycle tempo 5.1, the best efficiency increase for PLTU can be increased efficiency and decrease coal rate, which is best obtained in the third experiment which achieved 37,041% efficiency with a coal rate of 17,567 kg / s.
Optimasi Perencanaan Pembangkit Listrik Tenaga Surya (PLTS) Terpusat Wilayah Pulau Terluar Kristyadi, Tarsisius; Arfianto, Teguh
Infotekmesin Vol 12 No 2 (2021): Infotekmesin: Juli 2021
Publisher : P3M Politeknik Negeri Cilacap

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35970/infotekmesin.v12i2.672

Abstract

Air Glubi Village which is one of the villages in the Bintan Pesisir sub-district, Bintan Regency, Riau Islands province, is one of the villages that is one of the outer islands of Indonesia which still has no electricity, and is difficult to reach by PLN. In this village, there is no water source available for PLTMH, so the alternative for electricity supply in Air Glubi Village is a centralized PLTS. This paper discusses the planning of centralized PLTS in Air Glubi Village, Bintan Pesisir sub-district, Riau Islands province. Because the availability of land, the economic capacity of the population is limited, optimization is needed. This optimization is used to get the optimum electrical energy output with these various limitations. From primary data, electricity demand in the village is 62492 Wh per day. The optimization resulted in a centralized PLTS design with an off grid type with a capacity of 37 kWp. The main component is a solar module made of monocrystalin with a capacity of 200 Wp each, totaling 186 modules. The battery uses VRLA 200 Ah each, totaling 250 batteries. The change of Dc electricity to AC is carried out by utilizing an inverter with a capacity of 10 kW totaling 4 pieces. To build a centralized PLTS in Air Glubi Village need costs Rp 2,983,902,171.