Comparative Analysis of Lumpsum Contract and Unit Price Contract Risk Using Analytical Hierarchy Process Method: Case Study of Contractors in Bekasi Anjas, Handayani; Tiara, Irma
Journal of World Conference (JWC) Vol. 2 No. 3 (2020): May 2020
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/prd.v2i3.225

Abstract

Bekasi Regency Government gives priority in infrastructure development. According to the Central Statistics Agency for West Java Province, the population of Bekasi was 2,344,871 people in 2018. The Bekasi Regency Government will build roads in 28 locations, one of which is to improve the existing infrastructure in Bekasi. In every business, there will always appear two contradictory things which are profit and profit, including in the construction services business. Construction activities can be completed when meeting all the objectives that have been set, following the agreed costs, and meet the quality that has been previously agreed upon. The purpose of this study is to study agreements regarding lump-sum contracts and unit price contracts. This research method uses the Analytical Hierarchy Process Method. The research process starts with creating problems and making hierarchical arrangements. The hierarchical structure consists of three things namely objectives (level I), criteria (level II), and alternatives (level III). Once organized, the hierarchy will be attended by using a questionnaire for 30 respondents. After the data is obtained, the data is tabulated, then the paired frame is searched, move in pairs, and the priority weights. The results of the analysis by the AHP method were obtained in a construction project in Bekasi City, the factor of using Lumpsum contract was more influential compared to the contract Unit price with a ratio of 52.01%: 47.99%.
The Cost Comparative Analysis of Steel Frame Bridge Installation Work Methodology Between Using Cranes and Using Launching Gantry in Muara Karang Combined Cycle Power Plant 400-500 Mw Project Fariz Gading Pangestyo; Anjas Handayani
Journal of World Conference (JWC) Vol. 3 No. 1 (2021): January 2021
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Electrical energy is one of the most important and vital human needs that cannot be separated from daily needs. The case study was taken from the Muara Karang Combined Cycle Power Plant 400-500 MW Project, which is part of a 35,000 MW governmental program that aims to fulfill electricity needs from Sabang to Merauke. In this project, a method of implementing steel-frame bridge installations will be sought in terms of cost. That way, later you will get an efficient installation implementation method. In this study, the authors used secondary data from literature and primary data that taken directly from field observations. Data processing uses statistical tests with the Stepwise method. The cost for the work method using the crane is IDR 367,212,450, while the cost for the work method using the launching gantry is IDR 321,868,085. In the percentage result of the steel frame bridge installation work method, the greatest effectiveness factor is Tool Reach (X11) of 94.5%. Whereas in the work method using launching gantry with the variable that has the greatest effectiveness is the Capacity of Tools Used 76.8%. Judging from these results the factors that have the highest effectiveness to influence the time performance in the implementation of the steel frame bridge installation work method are the tool factor and the material factor.
Analysis Comparison of Plate and Beam Formwork Using Semi Conventional Formwork with Aluminium Formwork System in Terms of Cost and Duration on Vasanta Innopark Project Deviana Cahyani; Anjas Handayani
Journal of World Conference (JWC) Vol. 3 No. 1 (2021): January 2021
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The development of technology in the world of construction in Indonesia marked with the increasing number of innovations used in the construction process, one of which is formwork. Formwork is one of the most influential jobs on construction projects, especially in terms of cost and time. Therefore, modern Formwork innovations continue to emerge, one of which is Aluminium Formworks System. In this study the authors conducted comparative analysis of cost and time among semi-conventional Formwork with Aluminium Forcoand also spread questionnaires to find out if the Aluminium formworks are effective in replacing semi-conventional formworks on the Vasanta Innopark project. The results of the questionnaire will be analyzed using validity tests, realibility, correlation, and regression in SPSS software. The result of this research, the total cost needed for semi-conventional formwork is Rp. 6,577,699,867.20 and the total cost for the aluminium formwork is Rp. 6,985, 970.893.44 where aluminium formwork is more expensive by Rp 408,271,026.44 or 5.84% more expensive. And the time required conventional formwork is for 342 days while for aluminium formwork for 180 days or with a difference of 162 days or about 47.37 percent. And from the results of the questionnaire obtained that the effectiveness of aluminium formwork in replacing semi-conventional formwork is 0.833 or 83.3%.
Factors Affecting Delays in Luwansa Manado Hotel Project Anjas Handayani; Abid Nur Affani
Journal of World Conference (JWC) Vol. 3 No. 1 (2021): January 2021
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Building construction in Indonesia from year to year is growing, especially in the construction world. The increasing number of construction service providers in recent times should be offset by cost savings, quality in accordance with standards and also project time management. In Indonesia especially in Manado city there are many hotel developments, one of which is the construction of Hotel Luwansa manado. Acting as the main contractor (Main Contractor) of PT. Recta Construction, as the winner of the tender of the project. The construction of Hotel Luwansa Manado is one of the hotel developments not far from Manado City Beach which has 1 Tower, covering 10 floors, roof top, and 2 basements. At the time of implementation of the project one of the sub contractors had already started the foundation work in July 2019 and should have been completed in October 2019. However, the design of the foundation work on the project retreated to January 2020, due to design changes and resulted in the addition of foundation work at The Luwansa Hotel Project Manado. The method carried out in this study is the collection of data through questionnaires distributed to several respondents. The method of analysis performed is quantitative descriptive. The quantitative approach is research that focuses on hypothesis testing, the data used must be measured, and produce a generalized conclusion. This method uses (analysis tools) inference statistics (inconclusive). This method of analysis aims to describe the delay in construction work of Hotel Luwansa Manado building. From the analysis using the SPSS program there are five dominant variables namely X18 of 0.270,X16 of 0.239,X24 of 0.212,X17 of 0.172,and X27 of 0.104.
Analysis of The Cost Comparison of Bridge Floor Plate Formr on Toll Road Project Jonathan Harris Sianipar; Novika Candra F; Anjas Handayani; Ali Sunandar
Journal of World Conference (JWC) Vol. 3 No. 2 (2021): March 2021
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

In this study, researchers wanted to discuss the installation of formisting to be installed on the floor plate structure between the girders inside the concrete bridge. In this case the authors want to know the comparison of cost analysis using conventional form form, bondek plate and deckslab. Because the Cost Budget Plan is very much related to the design and selection of materials to be used on girder bridge type I. In construction projects in Indonesia especially on the installation of formware residual material, the use of tools, the location of material procurement is very influential to the cost of construction work therefore it is necessary to be considered and taken into account carefully the selection of efficient formery so that the costs that will be incurred are not overbudget. In the research process this final task requires the foundations of the theory that support the problems that are reviewed. Through the study of literature is expected to be able to increase knowledge and study the basic theory used as a reference. At this stage the activity is a review of literature related to similar case studies from journals, literature books, and previous research reports. Cost analysis is reviewed in terms of services / labor namely, labor users for conventional systems and bondek in the same amount, while for deckslab precast less, but requires more precision. Cost analysis reviewed in terms of equipment, that is, for bondek system equipment does not require complicated equipment, unlike conventional ones that use scafolding aids as well as deckslab precast that use heavy equipment such as crawler cranes and hyab cranes. Price analysis in terms of materials namely, materials for conventional and bondek is very easy to obtain for the price depending on the area of the project location, for deckslab precast is required special supplier because the manufacture is directly from fabrication with a higher price when compared to conventional and bondek. Price analysis of each formisting system is, the installation of conventional formisting with a price of /m2 of Rp. 729,371. The total price of installing bondek form form with a price of /m2 is Rp. 367.593. Total installation price of deckslab precast form work with /m2 price of Rp. 803.795. From the results of the analysis, it can be concluded, that bondek form form form method is worth using for the toll bridge project because in terms of simpler methods and in terms of cost more efficient and effective.