Claim Missing Document
Check
Articles

Found 4 Documents
Search

Analisis Penerapan Green Building Pada Bangunan Gedung Klinik Universitas Pahlawan Adeswastoto, Hanantatur; Setiawan, Beny; Desrimon, Arfi; Febryanto, Febryanto; Putra, Agus Alisa; Islah, Mhd.
Journal of Engineering Science and Technology Management (JES-TM) Vol. 3 No. 1 (2023): Maret 2023
Publisher : Journal of Engineering Science and Technology Management

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jestm.v3i1.99

Abstract

Green building atau bangunan hijau adalah pendekatan dalam merancang, membangun, dan mengoperasikan bangunan yang mempertimbangkan dampaknya terhadap lingkungan dan kesehatan manusia. Berdasarkan itu, perlu diadakannya kajian tentang green building di bangunan Gedung Klinik Universitas Pahlawan, agar diketahui rating atau tingkat penerapan green building di Gedung Universitas Pahlawan. Penelitian ini bertujuan untuk menganalisis penerapan green building dan manfaat yang dihasilkan. Metode penelitian yang digunakan adalah tinjauan literatur dan studi kasus. Dalam tinjauan literatur, berbagai sumber yang relevan seperti jurnal ilmiah, artikel, dan laporan penelitian digunakan untuk memperoleh informasi tentang konsep dan praktik green building. Studi kasus dilakukan di bangunan Gedung Klinik Universitas Pahlawan dengan menganalisis beberapa bangunan Gedung yang telah dibangun dan beroperasi. Menggunakan standar Greenship Existing Building versi 1.1 dari GBCI. Greenship EB 1.1 mempunyai 6 (enam) standar yaitu tepat guna lahan, efisiensi dan pengelolaan energi, pengelolaan air, siklus dan sumber daya material, kualitas udara dalam ruangan dan manajemen lingkungan bangunan. Hasil analisis menunjukkan bahwa penerapan green building masih banyak tidak terpenuhi disebabkan kurangnya tolok ukur yang tersedia. Rekomendasi yang dapat diberikan meliputi penggunaan bahan konstruksi yang lebih ramah lingkungan, penerapan sistem penghematan energi yang lebih efektif, penggunaan teknologi pengelolaan air yang lebih canggih, dan peningkatan dalam pengelolaan limbah.
FAKTOR-FAKTOR YANG MEMPENGARUHI KETERLAMBATAN PROYEK PEMBANGUNAN BOX CULVERT JEMBATAN JALAN SUDIRMAN DAN JALAN AGUSSALIM KECAMATAN BANGKINANG KOTA Febryanto, Febryanto; Azriadi, Emon; Adrian, Nurul; Yusnita, Amelia; Alenya, Nia; Fadri, Roy
Ensiklopedia Research and Community Service Review Vol 4, No 1 (2024): Vol. 4 No. 1 Oktober 2024
Publisher : Lembaga Penelitian dan Penerbitan Hasil Penelitian Ensiklopedia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33559/err.v4i1.2975

Abstract

Bridges are structures built to connect transportation activities due to obstacles such as rivers, lakes, swamps and other obstacles. As part of drainage systems and bridge infrastructure, box culverts help transport and control water flow. In implementing bridge construction projects there are several tendencies that influence performance, one of which is time management. The aim of this research is to identify the components that influence the length of time the box culvert bridge construction project on Jalan Sudirman and Jalan Agussalim, Bangkinang City subdistrict lasts. This research adopts a descriptive quantitative approach, a quantitative method rooted in the philosophy of positivism was chosen because it allows the collection of numerical data in a systematic and structured manner. Data collection was carried out through questionnaire data. The results of the research show that the main components causing the box culvert bridge construction project on Jalan Sudirman and Jalan Agussalim, Bangkinang Kota subdistrict to be delayed are the lack of expertise and skills as well as work motivation for workers in the field with a respondent result of 54% lack of expertise and skills and desire to work among workers in the field, according to 54% of respondents, the owner's work plan statement often changes based on the results of 51% of respondents and material accuracy with a respondent result of 51%.Keywords: Time Management, Box Culvert, Construction Project Delays
Pengenalan Penggunaan Alat Sondir Tanah 2,5 Ton Di Kawasan Kebun Raya Universitas Pahlawan Hasibuan, Syahrial; Azriadi, Emon; Febryanto, Febryanto
Journal of Social and Community Service Vol. 4 No. 2 (2025): July 2025
Publisher : Faculty of Engineering University of Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jestmc.v4i2.293

Abstract

Geotechnical and soil mechanics investigations are one of the supporting elements in the construction of a building, starting from planning activities to implementation activities. Based on detailed and thorough geotechnical investigations during field implementation, it is expected to obtain accurate and reliable data so that a clear picture of the condition, nature and composition of soil/rock layers will be obtained. The purpose of this Community Development Activity is to provide education to civil engineering students on how to use a soil mechanics test tool using Sondir 2.5 ton capacity. In its implementation, the method used in this soil mechanics test is the cone penetration test method, which is a static soil test in the field using a metal cone with a sensor at the end, which is mechanically pressed into the ground at a constant speed. The results of the tests carried out at 2 (two) locations showed that there was a hard soil layer at the first location at a depth of > 10 meters, and no hard soil layer was found at the second location.
Design Expert System to Identify Student Talent Based on Personality Type Using Certainty Factor Method in SMP Muhammadiyah Kandis Siak Riau Province Febryanto, Febryanto; Efriyanti, Liza
Knowbase : International Journal of Knowledge in Database Vol. 2 No. 1 (2022): June 2022
Publisher : Universitas Islam Negeri Sjech M. Djamil Djambek Bukittinggi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30983/ijokid.v2i1.5587

Abstract

The goal of this research is to create a system design that "can assist parents and teachers in recognizing the talents of their students" based on the child's personality, so that parents and teachers can provide "the right education and learning patterns for students". The author discovers that there is no expert system in SMP Muhammadiyah Kandis to identify children's talents based on personality type using certainty factor methods, and that at SMP Muhammadiyah Kandis, evaluations are still done manually and only to determine intelligence, not to determine student talent. The research method that the author uses is the Research and Development method, where the development method that the author uses is the Waterfall method according to Pressman, which the stages consist of Communication, Planning, Modeling, Construction, Development.‎ Based on the findings of the authors' research, the authors were successful in creating this research product, with the functional suitability test results from two experts obtaining a feasibility value of 100%, which was declared Very Fair, and the compatibility test results obtaining a feasibility value of 100%, which was declared Very Eligible and the feasibility score for the usability test was 86.3%, which was declared Very Eligible, and the feasibility score for the material result test was 81%, which was declared Very Eligible, and the feasibility score for the Indonesian linguistic test was 87.5%, which was declared Very Eligible. The aim of this study is to develop a expert system to identify children's interests and talents that are validated and worthy of being operated.