Claim Missing Document
Check
Articles

Found 32 Documents
Search

The RANCANG BANGUN APLIKASI SISTEM INFORMASI DAN PENDISTRIBUSIAN AYAM PEDAGING DI KABUPATEN KAMPAR BERBASIS WEB ( STUDI KASUS : PT. SEMESTA MITRA SEJAHTERA (SMS)) (PROGRAMMING) Yanti, Refni Rizma; Munti , Novi Yona Sidratul; Adeswastoto, Hanantatur
Jurnal Inovasi Teknik Informatika Vol. 8 No. 1 (2023): Maret 2023
Publisher : Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

ABSTRACT Provision of information about the availability of broiler PT. Semesta Mitra Sejahtera in Kampar Regency is still done manually by calling all distributors who have subscribed. In storing order data it is also still manual by recording on paper and typing it back into Microsoft Excel, this is of course very difficult for the admin because there is a lot of data that must be entered. So a support system was created in providing information and storing chicken order data to make it more time and cost efficient.Making this system uses data collection methods by taking data at PT. Prosperous Partner Universe.The support system is made web-based using the PHP programming language development tools, Laravel framework, MySQL, Visual Studio Code, and HTML. Keywords: Information system, PT. Semesta Mitra Sejahtera, broiler, web
Green Open Space Planning Model for Parks at Pahlawan University Adeswastoto, Hanantatur
Journal of Engineering Science and Technology Management (JES-TM) Vol. 1 No. 1 (2021): April 2021
Publisher : Journal of Engineering Science and Technology Management

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jestm.v1i1.8

Abstract

Improving the quality of green space and efforts to improve the function of the area in the academic environment must be considered as an integral part of building arrangement activities. This is because the aspects of the building and the environment are inseparable components of settlements, supporting each other in a balanced, harmonious, and harmonious manner. As a campus that applies the concept of “Green Campus”, of course, it wants the quality of its environment to be well maintained even though it has the development of facilities and infrastructure, Universitas Pahlawan must of course also fulfill these provisions. Therefore, it is very necessary to model in planning the Park Green Open Space Planning Model at the Hero University with various considerations that are adapted to regional conditions, land area and benefits that can be enjoyed optimally by the academic community. Environmental Park planning model is carried out by reviewing based on spatial (spatial) and social aspects. The importance of the Environmental Park planning model is due to not applying an appropriate planning model so that direct utilization is not maximally felt by the academic community. This study examines more deeply the relationship between the spatial and social aspects of the environmental park
Perancangan Visual Display Informasi Di Laboratorium Terpadu Universitas Pahlawan Tuanku Tambusai Syifa Tanjung, Lailatul; Kumala Sari, Resy; Adeswastoto, Hanantatur
Journal of Engineering Science and Technology Management (JES-TM) Vol. 3 No. 1 (2023): Maret 2023
Publisher : Journal of Engineering Science and Technology Management

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jestm.v3i1.82

Abstract

Hazards can occur anywhere and anytime, including when humans are working in the work environment. Workers often forget that there are dangers threatening around them. The need for invitations to workers to be able to maintain occupational safety and health (K3) at work is an effort that is felt to foster a sense of care for oneself and others to avoid danger. The purpose of this research is to design a visual display of information with an ergonomics approach and visual communication in the integrated laboratory of Pahlawan Tuanku Tambusai University. The ergonomics approach is an approach that utilizes information about the nature, abilities and limitations of humans in designing a work system so that humans can live and work on the system properly, namely achieving the desired goals through the work with ergonomic principles. Meanwhile, the visual communication approach is an approach to the concept of communication and the expression of creative power, which is applied in various visual communication media by processing graphic design elements consisting of images (illustrations), letters, colors, composition and layout. From this research, the results are in the form of calculating the width and height of letters that are good for display design at the integrated laboratory at Pahlawan Tuanku Tambusai University based on an ergonomic approach, good typography types for use in display design and display design based on an ergonomic approach and visual communication.
Penggunaan Asbuton (Ac-Wc) Pracampur Pada Proyek Preservasi Jalan Duri – Kandis - Sp. Palas - Siak II (Pekanbaru) (E-Katalog) Islah , Mhd.; Adeswastoto, Hanantatur
Journal of Engineering Science and Technology Management (JES-TM) Vol. 3 No. 1 (2023): Maret 2023
Publisher : Journal of Engineering Science and Technology Management

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jestm.v3i1.95

Abstract

Asbuton is natural asphalt whose use in Indonesia is no stranger. One of the asbuton technologies that has been widely used is pre-mixed asbuton. Pre-mixed asphalt is one type of modified asphalt used in Indonesia. Pre-mixed Asphalt is processed and mixed with Pen 60/70 Asphalt at a factory that meets certain requirements, so that it is equivalent to Modified Asphalt. Premixed Asbuton products have a minimum level of purity of 90%, so they still contain a maximum of 10% fine minerals. This type of processed Pre-mixed Asphalt is the mobile container circulates directly inside the Asphalt Mixing Plant (AMP) boiler without the addition of Asphalt Pen 60/70 to produce Hot Mix Asphalt (Hotmix) which is equivalent to using Modified Asphalt. From the results of testing in the laboratory it was found that the asphalt mixture using pre-mixed asphalt has better technical properties than the conventional asphalt mixture (made using Pen 60/70 asphalt)
Analisis Penerapan Green Building Pada Bangunan Gedung Klinik Universitas Pahlawan Adeswastoto, Hanantatur; Setiawan, Beny; Desrimon, Arfi; Febryanto, Febryanto; Putra, Agus Alisa; Islah, Mhd.
Journal of Engineering Science and Technology Management (JES-TM) Vol. 3 No. 1 (2023): Maret 2023
Publisher : Journal of Engineering Science and Technology Management

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jestm.v3i1.99

Abstract

Green building atau bangunan hijau adalah pendekatan dalam merancang, membangun, dan mengoperasikan bangunan yang mempertimbangkan dampaknya terhadap lingkungan dan kesehatan manusia. Berdasarkan itu, perlu diadakannya kajian tentang green building di bangunan Gedung Klinik Universitas Pahlawan, agar diketahui rating atau tingkat penerapan green building di Gedung Universitas Pahlawan. Penelitian ini bertujuan untuk menganalisis penerapan green building dan manfaat yang dihasilkan. Metode penelitian yang digunakan adalah tinjauan literatur dan studi kasus. Dalam tinjauan literatur, berbagai sumber yang relevan seperti jurnal ilmiah, artikel, dan laporan penelitian digunakan untuk memperoleh informasi tentang konsep dan praktik green building. Studi kasus dilakukan di bangunan Gedung Klinik Universitas Pahlawan dengan menganalisis beberapa bangunan Gedung yang telah dibangun dan beroperasi. Menggunakan standar Greenship Existing Building versi 1.1 dari GBCI. Greenship EB 1.1 mempunyai 6 (enam) standar yaitu tepat guna lahan, efisiensi dan pengelolaan energi, pengelolaan air, siklus dan sumber daya material, kualitas udara dalam ruangan dan manajemen lingkungan bangunan. Hasil analisis menunjukkan bahwa penerapan green building masih banyak tidak terpenuhi disebabkan kurangnya tolok ukur yang tersedia. Rekomendasi yang dapat diberikan meliputi penggunaan bahan konstruksi yang lebih ramah lingkungan, penerapan sistem penghematan energi yang lebih efektif, penggunaan teknologi pengelolaan air yang lebih canggih, dan peningkatan dalam pengelolaan limbah.
Characteristics of Marshall Asbuton (Ac-Wc) Premixed with Asphalt Pen 60/70 (AC-WC) on the Duri – Kandis Road Preservation Project - Sp. Palas - Siak II (Pekanbaru) Islah, Mhd; Adeswastoto, Hanantatur; Sari, Resy Kumala
Journal of Engineering Science and Technology Management (JES-TM) Vol. 3 No. 2 (2023): September 2023
Publisher : Journal of Engineering Science and Technology Management

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jestm.v3i2.130

Abstract

The development of development in the industrial world does not escape the use of building materials, one of which is asphalt, which is often used in road construction. Asbuton is one of Indonesia's natural resources whose quality cannot be doubted. One of the asbuton technologies that is widely used is pre-mixed asbuton. Pre-mixed asphalt is one type of modified asphalt used in Indonesia. Pre-mixed Asbuton is processed and mixed with Asphalt Pen 60/70 in a factory that meets certain requirements, so it is equivalent to Modified Asphalt. This research aims to obtain a comparison of the characteristic values of Premixed Asbuton (AC-WC) with Pen 60/70 Oil Asphalt (AC-WC). The method used is experimental by carrying out laboratory tests. The test results for Premixed Asbuton (AC-WC) stability were 1,239.2 and Flow 3.82. Meanwhile, Asphalt Pen 60/70 (AC-WC) Stability is 1,051.4 and Flow 3.17
Design and Construction of Tools for Fertilizing Palawija Plants Asrul Baroqah, Mohd; Azriadi, Emon; Adeswastoto, Hanantatur
Journal of Engineering Science and Technology Management (JES-TM) Vol. 4 No. 2 (2024): September 2024
Publisher : Journal of Engineering Science and Technology Management

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jestm.v4i2.197

Abstract

Corn (Zea mays L.) is one of the important food crops widely cultivated in various parts of the world, including Indonesia. This plant has high economic value and serves as a source of food, animal feed, and industrial raw materials. This research aims to design and create a corn fertilizer tool utilizing easily obtainable materials such as pipes, used buckets, and hoses. This fertilizer tool is designed using SolidWorks 2020 software to ensure precise and functional design. In the testing process, this tool was evaluated to measure the accuracy and efficiency of fertilizer distribution. The tank on this tool has a capacity of 10 kg, which is sufficient to meet the fertilization needs with a dosage of 300 kg per hectare. With a corn plant population of 71,000 plants per hectare, each corn plant requires about 4 grams of NPK fertilizer. The tool testing was conducted in Salo Timur Village, and the results showed that this tool can effectively and efficiently distribute fertilizer according to the needs of each corn plant.
Analisis penerapan Kesehatan dan Keselamatan Kerja (K3) dalam proyek pembangunan Gedung RSIA Norfa Husada Adeswastoto, Hanantatur; Sari, Resy Kumala; Saputra, M Azlan; Tasya, Tasya; Nisa, Khoirun; Rahman, Anang Maulana Ar
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 8 No. 1 (2025): January
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v8i1.42431

Abstract

Norfa Husada Hospital is a multi-storey building construction project that has K3 risks during construction. Therefore, to reduce the number of work accidents that occur during the Norfa Husada-Bangkinang Hospital Building construction project, efforts are needed to identify potential risks of work accidents from each job. This research studies various factors that influence occupational safety and health, how to implement occupational safety and health, and occupational safety and health risks. The aim of this research is to determine the types of risks, the factors that influence them, and how to manage occupational safety and health risks in the Norfa Husada Bangkinang hospital building construction project. The data collection method used in this research was a questionnaire and interview method with 20 respondents consisting of Owners, Contractors, Supervisors. The results of this research obtained a score of 3.3% for workers' comfort and light sources while working, a score of 2.75% because the machine was located far from the project environment, causing injuries or noise, a score of 3.25% for the company that provided a comfortable place to rest, a score of 2.80% for a spacious workplace so that it did not cause clashes with other workers, and a score of 3.30% for the presence of personal protective equipment (PPE) provided on the project.
EVALUASI EFEKTIFITAS PENERAPAN KONSEP MANAJEMEN PROYEK PADA PELAKSANAAN PROYEK PELEBARAN JALAN MENAMBAH LAJUR BATAS KABUPATEN KAMPAR-BATAS KOTA BANGKINANG Islah, Muhammad; Adeswastoto, Hanantatur; Wahyudi, Wahyudi; Rantisi, Alib Jabsyam; Zahara, Della; Janna, Miswatun
Ensiklopedia Research and Community Service Review Vol 4, No 1 (2024): Vol. 4 No. 1 Oktober 2024
Publisher : Lembaga Penelitian dan Penerbitan Hasil Penelitian Ensiklopedia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33559/err.v4i1.2976

Abstract

In construction project activities, planning is used as a reference material for project management and become a standard for project implementation which includes: cost factors, time factors and closely related quality factors on project performance. This research is limited to the scope of physical activities/construction stages with objectives to evaluate the effect of the effectiveness of applying project management concepts on project implementation road construction in terms of cost, time and quality on project performance. In the context of a road construction project in Kampar Regency, this research aims to evaluate the effectiveness of applying project management concepts in improving project performance. This research also analyzes the influence of cost, time and quality factors on overall project performance. Using a multiple linear regression approach, the research results show that cost and time factors have a positive and significant influence, while quality factors have a smaller contribution to improving project performance. This research uses a qualitative and quantitative descriptive approach with multiple linear regression analysis methods. Therefore, the results obtained will depend on primary data collected through questionnaires and interviews. This research can help in identifying and managing risks associated with project implementation, thereby minimizing delays and additional costs. Keywords: cost factor, time factor, quality factor, validity test, linear regression model.
Analysis of Employee Work Posture at Sorting and Boiler Stations of PT Mitra Bumi Using the OWAS Method Almahera, Piki; Chen, An; Sari, Resy Kumala; Adeswastoto, Hanantatur; Pratiwi, Nurul Dwi
Journal of Engineering Science and Technology Management (JES-TM) Vol. 4 No. 1 (2024): Maret 2024
Publisher : Journal of Engineering Science and Technology Management

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jestm.v4i1.147

Abstract

Activities at sorting stations and boilers are high risk activities. Incorrect body posture, done repeatedly and relying on manual human power causes musculoskeletal disorders (MSDS). This research aims to analyze MSDs disturbances in body parts of workers at sorting  stations and boilers using the Ovako work posture analysis system (OWAS) method. OWAS can identify four body parts in a worker's posture, namely the back, upper arms, legs and weight category. Based on the results of the OWAS assessment, a score of  4144 was obtained at the sorting station, and 4141 at the boiler station. Both scores are in category 4, which means improvements need to be made as soon as possible. The injury risk index reached a value of 400 for both stations, indicating a very high level of danger.