Claim Missing Document
Check
Articles

Found 4 Documents
Search

KEMAMPUAN BERHITUNG PERMULAAN ANAK TAMAN KANAK-KANAK KELOMPOK B SE-KELURAHAN LENGKONGSARI KOTA TASIKMALAYA Maesaroh, Maya; Sumardi, Sumardi; Nur, Lutfi
JURNAL PAUD AGAPEDIA Vol 3, No 1 (2019): Juni 2019
Publisher : Universitas Pendidikan Indonesia (UPI)

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (867.175 KB) | DOI: 10.17509/jpa.v3i1.26669

Abstract

ABSTRACTThis study aims to determine the ability to count the beginning of kindergarten children group B village Lengkongsari Tasikmalaya City. This is based on the importance of numeracy skills for early childhood. In addition, the ability to start counting also needs to be developed so that children have the readiness to continue to higher education again that is elementary school. This research is descriptive research using survey method. Population in this research is kindergarten children group B Se-village Lengkongsari Tasikmalaya City. The data retrieval technique is using purposive sampling. The population of this research is Children of Kindergarten of Lengkongsari Urban Village. The results of data analysis of early numeracy skills include the ability to split the numbers 1-10, write 1-10 numbers, the ability of addition and reduction of 1-10 numbers. The ability to spell shows an average of 9.87. In terms of criteria according to Acep Yoni the ability to count is very well developed. Ability to write an average of 9.53 and is in the criteria developed very well. Furthermore, the summation ability of 9.25 and the average abatement capability is 9.08 and is in excellent growing criteria. ABSTRAKPenelitian ini bertujuan untuk mengetahui kemampuan berhitung permulaan anak TK kelompok B Se-kelurahan Lengkongsari Kota Tasikmalaya. Hal ini dilatar belakangi oleh pentingnya kemampuan berhitung untuk anak usia dini. Selain itu kemampuan berhitung permulaan juga perlu dikembangkan sehingga anak memiliki kesiapan melanjutkan ke pendidikan yang tinggi lagi yaitu sekolah dasar. Penelitian ini adalah penelitian deskriptif dengan menggunakan metode survey. Populasi dalam penelitian ini adalah anak TK kelompok B Se-kelurahan Lengkongsari Kota Tasikmalaya. Teknik pengambilan data yaitu menggunakan sampling purposive. Hasil analisis data mengenai kemampuan berhitung permulaan yang meliputi kemampuan membilang angka 1-10, menulis angka 1-10, kemampuan penjumlahan dan pengurangan angka 1-10. Kemampuan membilang menunjukan rata-rata sebesar 9,87. Kemampuan membilang sudah berkembang sangat baik (BSB). Kemampuan menulis rata-rata sebesar 9,53 dan berada dalam kriteria berkembang sangat baik. Selanjutnya kemampuan penjumlahan 9,25 dan kemampuan pengurangan rata-rata sebesar 9,08 dan berada dalam kriteria berkembang sangat baik (BSB).
PENERAPAN ALGORITMA K-MEANS CLUSTERING PADA PENGELOMPOKAN DAERAH PENYEBARARAN DIARE DI PROVINSI JAWA BARAT Maesaroh, Maya; Nur Padilah, Tesa; Haerul Jaman, Jajam
JATI (Jurnal Mahasiswa Teknik Informatika) Vol. 7 No. 4 (2023): JATI Vol. 7 No. 4
Publisher : Institut Teknologi Nasional Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36040/jati.v7i4.7208

Abstract

Penyakit diare adalah suatu gangguan pada saluran pencernaan yakni tinja ataupun feses berubah menjadi cair serta berlangsung 3 kali ataupun lebih dengan kurun waktu 24 jam dan bisa dibarengi muntah-muntah, sehingga penderita mengalami dehidrasi dan apabila tidak segera ditangani akan dapat menyebabkan kematian. Permasalahan diare tidak bisa dibiarkan dan harus ditangani karena diare dapat menimbulkan dampak negatif bagi kesehatan. Perlu dilakukan pengelompokan daerah dengan tujuan agar pemerintah Jawa Barat dapat melakukan pengambilan keputusan terhadap permasalahan diare di Provinsi Jawa Barat, seperti daerah mana saja yang perlu perhatian secara khusus. Algoritma yang digunakan adalah algoritma k-means clustering dengan beberapa langkah yaitu seleksi data, pre-processing data, transformasi data, data mining, dan interpretasi/evaluasi. Pengelompokan daerah penyebaran diare dengan bantuan dari metode elbow sebagai penentuan jumlah cluster terbaik dengan hasil cluster terbaik pada 4 (empat) cluster dalam setiap dataset pertahun dan hasil clustering dibuat visualisasi pemetaan menggunakan tools Quantum GIS (QGIS). Hasil evaluasi model pengelompokan tersebut dengan menggunakan silhouette coefficient pada tahun 2020 mendapatkan index nilai sebesar 0,62 dan index nilai sebesar 0,55 pada tahun 2021, hasil tersebut menunjukkan bahwa kriteria yang diterapkan merupakan struktur yang baik (medium structure).
Impact of customer default on cash conversion cycle and net working capital in construction company Maesaroh, Maya; Faturohman, Taufik
International Journal of Financial, Accounting, and Management Vol. 6 No. 3 (2024): December
Publisher : Goodwood Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35912/ijfam.v6i3.2120

Abstract

Purpose: This study aimed to determine the effect of customer default on the Cash Conversion Cycle and Net Working Capital in construction companies. Method: This study uses secondary data from companies’ financial reports to calculate the Cash Conversion Cycle, Net Working Capital, and Spearman's rho Correlation Test to determine the relationship between the two variables. Results: The results show that SOE customer default affects the condition of the Cash Conversion Cycle, especially in 2023, where the Cash Conversion Cycle value in Q123 (85 days) and Q223 (64 days), but the worst Cash Conversion Cycle results during the observation period are in Q122 (134 days). In Net Working Capital, there are only three periods with negative results: Q219 (-3.1B), Q319 (-461M), and Q421 (-4B), but not in 2023, because in 2023, the result is positive (or liquid). Spearman's rho Correlation Test shows that the relationship between the two variables is negatively correlated by -0.319, and the significance is 0.184, or the two variables are not significant. Limitations: This study was limited to construction companies in Bandung. The data taken from 2019 to Q3-2023 only focus on the influence of SOE customer defaults on the company's Cash Conversion Cycle and Net Working Capital.   Contribution: This study provides the best solution to the problem of customer default in the Cash Conversion Cycle and Net Working Capital in a construction company. If the solution is applied to the company, an implementation plan is created to fix the problem.
Impact of customer default on cash conversion cycle and net working capital in construction company Maesaroh, Maya; Faturohman, Taufik
International Journal of Financial, Accounting, and Management Vol. 6 No. 3 (2024): December
Publisher : Goodwood Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35912/ijfam.v6i3.2120

Abstract

Purpose: This study aimed to determine the effect of customer default on the Cash Conversion Cycle and Net Working Capital in construction companies. Method: This study uses secondary data from companies’ financial reports to calculate the Cash Conversion Cycle, Net Working Capital, and Spearman's rho Correlation Test to determine the relationship between the two variables. Results: The results show that SOE customer default affects the condition of the Cash Conversion Cycle, especially in 2023, where the Cash Conversion Cycle value in Q123 (85 days) and Q223 (64 days), but the worst Cash Conversion Cycle results during the observation period are in Q122 (134 days). In Net Working Capital, there are only three periods with negative results: Q219 (-3.1B), Q319 (-461M), and Q421 (-4B), but not in 2023, because in 2023, the result is positive (or liquid). Spearman's rho Correlation Test shows that the relationship between the two variables is negatively correlated by -0.319, and the significance is 0.184, or the two variables are not significant. Limitations: This study was limited to construction companies in Bandung. The data taken from 2019 to Q3-2023 only focus on the influence of SOE customer defaults on the company's Cash Conversion Cycle and Net Working Capital.   Contribution: This study provides the best solution to the problem of customer default in the Cash Conversion Cycle and Net Working Capital in a construction company. If the solution is applied to the company, an implementation plan is created to fix the problem.