Akbar, Faisal Muhammad
Unknown Affiliation

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

KAJIAN TEKNIS PRODUKTIVITAS ALAT GALI MUAT DAN ALAT ANGKUT UNTUK MENCAPAI TARGET PRODUKSI BATU ANDESIT DI PT.ARGA EASTU DESA SANETAN, KECAMATAN SLUKE, KABUPATEN REMBANG PROVINSI JAWA TENGAH Akbar, Faisal Muhammad; Rezkie, Hendra; Ratminah, Wawong Dwi
Prosiding Seminar Teknologi Kebumian dan Kelautan Vol 1, No 1 (2019)
Publisher : Prosiding Seminar Teknologi Kebumian dan Kelautan

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (708.372 KB)

Abstract

PT. Arga Wastu, merupakan sebuah perusahaan yang bergerak dalam bidang penambangan batu andesit yang berlokasi di Desa Sanetan, Kecamatan Sluke,Kabupaten Rembang, Provinsi Jawa Tengah. Lokasi penelititian berada di Kuari Lengis. Sistem Penambangan yang diterapkan oleh  PT. Arga Wastu adalah sistem tambang terbuka. PT Arga Wastu menetapkan target produksi batu andesit uuntuk kuari Lengis adalah sebesar 30.000 ton/bulan. Proses penambangan dilakukan dengan menggunakan alat mekanis 2 unit excavator backhoe Komatsu PC 300-8 melayani 4 unit dump truck Hino Ranger FM260TI dengan jarak maksimum menuju kehooper 1400 m.  Permasalahan yang terjadi adalah belum tercapainya produksi batu andesit dari alat muat dan alat angkut di kuari Lengis.Kemampuan produksi saat ini 21.467,95 ton/bulan, tidak tercapainya produksi ini dikarenakan adanya hambatan kerjabaik yang dapat dihindari maupun yang tidak dapat dihindari.Dengan adanya hambatanhambatan ini akan memperkecil waktu kerja efektif sehingga menyebabkan efisiensi kerja rendah. Upaya peningkatan produksidapat dilakukan dengan cara meningkatkan waktu kerja efektif, penambahan jumlah curah dan penambahan alat angkut.Produktivitas yang dihasilkan dengan cara meningkatkan waktu kerja efektif dan penambahan jumlah curah adalah sebesar31.567,42 ton/bulan, sedangkan produktivitas dengan penambahan jumlah alat angkut adalah sebesar 30.050,75 ton/bulan. PT. Arga Wastu. is a company engaged in the mining industry andesite located in the village Sanetan village, District Sluke looks very compact and with a considerable amount. Andesite needs as a building material at this time quite a lot. Therefore, mineral andesite that is in that location is very good to be developed into an investment activity in the mining sector. Problems that occur at this time is not yet contained detailed data on the number of calculations batuandesit backup, so it needs accurate data through direct observation of the condition of regional geological structure and topography batuandesit deposition and stripping ratio at PT. Arga Wastu to the large reserves calculation. Efforts to do in order to get the total amount batuandesit reserve calculation is the method of Cross Section with guidelines Rule of Nearest Point using AutoCAD software and Quicksurf. The choice of method is based on the nature of Andesite homogeneous, the calculation is simple and easy to understand. Cross Section method selected by considering the excavated material to be studied. Estimated reserves batuandesit in the research area, is limited to the lowest elevation of 15 m above sea level, with overburden thickness of about 15-2 meters.
RENCANA BIAYA REKLAMASI LANGSUNG PROGRAM PASCATAMBANG LAHAN BEKAS TAMBANG DI CV. EMPAT JAYA, KECAMATAN PONJONG, KABUPATEN GUNUNG KIDUL, PROVINSI DAERAH ISTIMEWA YOGYAKARTA Akbar, Faisal Muhammad; Darmastuti, Dwi Reping; Ratminah, Wawong Dwi
Prosiding Seminar Teknologi Kebumian dan Kelautan Vol 1, No 1 (2019)
Publisher : Prosiding Seminar Teknologi Kebumian dan Kelautan

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (578.302 KB)

Abstract

CV. Empat Jaya merupakan perusahaan tambang batugamping yang berlokasi di Desa Kentheng dan Karangasem Barat, Kecamatan Ponjong, Kabupaten Gunung Kidul, Provinsi Daerah Istimewa Yogyakarta. Berakhirnya kegiatan pertambangan mengakibatkan dampak-dampak negatif khususnya kerusakan lingkungan sehingga diperlukan rencana biaya reklamasi pascatambang. Hal ini dimaksudkan untuk mengetahui berapa biaya yang dibutuhkan dalam upaya mengurangi dampak negatif dari berakhirnya kegiatan pertambangan. Tujuan dari penelitian ini adalah menghitung biaya pembongkaran, biaya penatagunaan lahan, biaya penebaran tanah pucuk, dan biaya revegetasi dalam kegiatan reklamasi program pascatambang CV. Empat Jaya. Metode yang digunakan dalam penelitian ini secara umum terdiri dari studi literatur untuk mengetahui gambaran umum dan menambah referensi tentang pascatambang, mengumpulkan data pendukung seperti pedoman penyusunan rencana pascatambang berdasarkan undang-undang, pengumpulan data sekunder tentang tinjauan umum wilayah penelitian, pengambilan data dilapangan untuk menentukan profil area yang akan dilakukan reklamasi program pascatambang, dan perhitungan yang berisi tentang rencana dan biaya reklamasi program pascatambang. Rencana biaya reklamasi program pascatambang lahan bekas tambang batugamping CV. Empat Jaya dilakukan di 3 area yaitu tapak bekas tambang, fasilitas pengolahan, dan fasilitas penunjang dimulai dari pembongkaran bangunan, kemudian dilakukan penatagunaan lahan, dan penyebaran tanah pucuk. Setelah itu, dilakukan penanaman tanaman penutup tanah dan penanaman tanaman perintis. Rencana anggaran total biaya reklamasi program pascatambang adalah sebesar Rp 95.070.361,00.