Mega Hastuti, Sri Wahyuni
Unknown Affiliation

Published : 4 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 4 Documents
Search

Analisis Pengaruh Manajemen Karir, Motivasi, Dan Lingkungan Kerja Terhadap Karir Karyawan U.D. Karya Pala Kediri Saras, Yogi S; Mega Hastuti, Sri Wahyuni; Maheri Laksono, Sonny Subroto
REVITALISASI : Jurnal Ilmu Manajemen Vol 13 No 2 (2024): REVITALISASI : Jurnal Ilmu Manajemen
Publisher : Universitas Islam Kadiri

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32503/revitalisasi.v13i2.6455

Abstract

This study analyzes the impact of Career Management, Motivation, and Work Environment on Employee Careers at UD Karya Pala Kediri. It aims to evaluate both the simultaneous and partial effects of these factors on employee careers at the company. Using a quantitative explanatory research method, data were collected through questionnaires and interviews for primary data, and company documentation along with related sources for secondary data. Data analysis was performed using the Statistical Package for the Social Sciences (SPSS). The results show that career management, motivation, and work environment all significantly affect employee careers simultaneously, with motivation having the strongest impact. These findings highlight that enhancing employee motivation will have the greatest effect on improving their careers
Peran Citra Merek dan Kualitas Pelayanan Memprediksi Kepuasan Anggota Koperasi Pegawai Republik Indonesia Pembangunan Mustofa, M. Rowi; Mega Hastuti, Sri Wahyuni; Sumarji, Sumarji
Citizen : Jurnal Ilmiah Multidisiplin Indonesia Vol. 5 No. 4 (2025): CITIZEN: Jurnal Ilmiah Multidisiplin Indonesia
Publisher : DAS Institute

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.53866/jimi.v5i4.979

Abstract

Citra koperasi yang baik mencerminkan kepercayaan dan reputasi yang baik agar anggota bangga terhadap koperasi. Disisi kualitas pelayanan memainkan peran krusial dengan memastikan kebutuhan dan harapan anggota terpenuhi secara konsisten. Tujuan penelitian ini adalah untuk mengetahui pengaruh citra koperasi terhadap Kepuasan anggota Koperasi Pegawai Republik Indonesia Pembangunandi Kabupaten Kediri, mengetahui pengaruh kualitas pelayanan terhadap Kepuasan anggota Koperasi Pegawai Republik Indonesia Pembangunan di Kabupaten Kediri, dan mengetahui citra koperasi dan kualitas pelayanan secara simultan berpengaruh terhadap kepuasan anggota Koperasi Pegawai Republik Indonesia Pembangunan di Kabupaten Kediri. Populasi dari penelitian adalah semua anggota KPRI Pembangunan 342 orang. Sampel dihitung menggunakan rumus Slovin dan menggunakan teknik sampling acak sederhana 167 orang anggota. Kediri. Hasil analisis penelitian terhadap model dan pengujian hipotesis diperoleh kesimpulan adalah pertama terdapat pengaruh Citra koperasi terhadap kepuasan anggota KPRI Pembangunan Grogol Kediri. Kedua terdapat pengaruh Kualitas Pelayanan terhadap Kepuasan Anggota KPRI Pembangunan Grogol Kediri. Ketiga terdapat Pengaruh Simultan antara Citra Koperasi dan Kualitas Pelayanan terhadap Kepuasan Anggota KPRI Pembangunan Grogol Kediri. Dengan demikian model regresi linier merupakan model yang tepat digunakan untuk memprediksi pengaruh citra koperasi dan kualitas pelayanan koperasi terhadap kepuasan anggota koperasi. Kata kunci : Citra Koperasi, Kualitas Pelayanan, Kepuasan Anggota Koperasi, Koperasi.
Analisis Kinerja KeuanganProyek Pembangunan Sentral PLTD Unit VII Gudang Garam Kediri Menggunakan Metode Earned Value (Eva) Maghfiroh, Syntya Arum Dani; Mega Hastuti, Sri Wahyuni
Otonomi Vol 24 No 1 (2024): Otonomi
Publisher : Universitas Islam Kadiri

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32503/otonomi.v24i1.5273

Abstract

A project is a temporary series of activities that takes place within a limited timeframe, with allocated specific resources, and is intended to carry out tasks whose objectives have been clearly defined. In a project, project management is necessary to organize, coordinate, and carry out activities within the project, such as the development project of the PLTD Unit VII Warehouse of Gudang Garam Kediri, which is the subject of this research. Project control is needed to ensure that the project is completed according to plan. Value analysis can be applied to determine the performance index of completed project work. The performance of the project execution in the 20th week in terms of cost shows that project expenses are higher than planned costs, as indicated by the Cost Performance Index (CPI) with a result of 0.898 < 1. Meanwhile, in terms of schedule, there is a delay, indicated by the Schedule Performance Index (SPI) with a result of 0.960 < 1. If the project execution performance in the 20th week remains the same until the end of the project, the estimated total cost of project execution (EAC) required is Rp. 36,421,987,702.67, then the project will incur a loss of Rp. 3,710,669,761.04 or a loss percentage of 11.334% from the planned cost. The estimated project completion time (EAS) based on reporting data in the 20th week is 52.66 weeks, indicating a delay in completing the work of 16.66 weeks or a delay percentage of 46.28% from the planned project schedule of 36 weeks. Some solutions to overcome the occurring delay include adding overtime work hours to critical path activities, implementing shift work systems, and maximizing the productivity of labor and available tools.
Pengaruh Bantuan Langsung Tunai (Bsm) Dan Motivasi Terhadap Kualitas Pendidikan di Kabupaten Tulungagung Hudiyanto, Wahyu; Mega Hastuti, Sri Wahyuni
Otonomi Vol 24 No 1 (2024): Otonomi
Publisher : Universitas Islam Kadiri

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32503/otonomi.v24i1.5274

Abstract

This research aims to: Analyzing the simultaneous significant effects of nalyzing the simultaneous effects of variables on the quality of education, analyzing the influence of motivation on the quality of education; determining which variable, either asistence for poor students or motivation, is more dominant in influencing the quality of education. This research uses Descriptive Quantitative. the population all first-grade students in publick/private school in Tulunggaung Regency. The sample for this study is 10% of the total population, which is 635 people. The technique is a method of data collection now. In this study, researchers used the software (software), Microsoft Office Excel 2007 to carry out a descriptive and statistical analysis software (software) Statistical Package for Social Sciences (SPSS) for Windows version 21.0 to carry out the test, test the classical, hypothesis testing and multiple linear regression analysis, , The research findings indicate a significant influence betwen the variables of direct cash assistence (BSM), nd motivation on the quality of education in Tulungagung regency