p-Index From 2020 - 2025
0.408
P-Index
This Author published in this journals
All Journal Jurnal SPEKTRUM
Claim Missing Document
Check
Articles

Found 2 Documents
Search

PERANCANGAN JARINGAN DISTRIBUSI UNTUK PLTS TERAPUNG DAN PLTMH DI BENDUNGAN SIDAN Sari, N. P. A. R.; Ariastina, W. G.; Setiawan, I. N.; Partha, C. G. I.; Sukerayasa, I W.; Kumara, I. N. S.
Jurnal SPEKTRUM Vol 11 No 1 (2024): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/SPEKTRUM.2024.v11.i01.p17

Abstract

Blahkiuh Feeder is a 20 kV radial distribution network spanning 78.65 kms, which is the longest network in the Mengwi Network Unit. The length of the distribution lines also results in relatively high power losses. Therefore, the installation of distributed generation (DG) utilizing the potential of solar photovoltaic (PV) and micro-hydro power plants (MHP) available at the Sidan Dam has the potential to improve voltage drop and power loss values on the Blahkiuh Feeder. This research was conducted to analyze voltage and power losses due to DG installation at the Sidan Dam, with power flow simulation during peak daytime load at 14:00 and peak nighttime load at 19:00. Simulation results indicate that when interconnected with the daytime peak load at 14:00, DG interconnection results in a decrease in power loss values by 0,8% or 64 kW, and interconnection with the nighttime peak load at 19:00 also leads to a decrease in power loss values by 0.61% or 55 kW. Distributed Generation interconnection on the Blahkiuh Feeder also leads to improvements in voltage values, where interconnection during daytime at 14:00 results in voltage improvement at 41 busbars units under undervoltage condition, and interconnection during night time at 19:00 leads to voltage improvement at only 34 busbars units undervoltage condition out of a total of 50 undervoltage busbars.
ANALISIS EKONOMI SISTEM PLTMH DAN POMPA AIR SUNGAI YEH HA DI KABUPATEN KARANGASEM Leba, G. I. M.; Sukerayasa, I. W.; Ariastina, W. G.; Giriantari, I. A. D.; Kumara, I. N. S.
Jurnal SPEKTRUM Vol 11 No 1 (2024): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/SPEKTRUM.2024.v11.i01.p28

Abstract

Yeh Ha River in Ababi Village, Karangasem Regency, is a bathing spot utilized by locals for various purposes, fed by the Yeh Ha spring. Among its uses is filling a water tank with a capacity of 58.74 m3 to distribute water to 10 households. Initially, a waterwheel powered a mechanical pump without electricity. However, due to damage, a less efficient hydraulic ram pump replaced the waterwheel. The research aims to design a Microhydro Power Plant (PLTMH) and a water pump system. With these systems, it's expected to enhance the efficiency of filling the water tank and ensure project sustainability through economic analysis. Measurements indicate that Yeh Ha spring has a flow rate of 0.201 m3/s with a head of 4.6 m. Based on this, a crossflow turbine equipped with a centrifugal pump and variable frequency drive is chosen to meet the water needs of 12,277 people or 2,455 families. The investment for the PLTMH and water pump system is Rp3,191,330,505 with a project's economic life of 30 years. Feasibility analysis shows that the design is viable, with a positive net present value of Rp1,534,531,357 and Rp930,180,420 at discount rates of 10% and 12%, respectively. However, the benefit-cost ratio (BCR) is less than 1, at 0.48 and 0.29. The internal rate of return (IRR) is 17.6% and 15.5%, with a break-even point of 2,699,253 m3 sold, requiring a payback period of 9 years at a 10% discount rate and 10 years and 4 months at a 12% discount rate.