Claim Missing Document
Check
Articles

Found 2 Documents
Search

Analisis Kinerja Petugas Penyuluh Lapangan Keluarga Berencana (PLKB) Di Kecamatan Polinggona Kabupaten Kolaka Jaya, Ansar; Amir, Muh; Abdullah, Muhammad Zein
REZ PUBLICA Vol 6, No 2 (2020): Juny-August
Publisher : Universitas Halu Oleo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33772/rzp.v6i2.13615

Abstract

The purpose of this research is to find out and explain the Performance of Family Planning Field Extension Workers in Polinggona Subdistrict, Kolaka Regency and To find out the factors that influence the Performance of Family Planning Field Extension Workers in Polinggona District, Kolaka District. Data collection techniques carried out by library research and field research, while data analysis techniques used descriptive qualitative analysis techniques. The results of this study indicate that the documentation and interview observation techniques carried out at Polinggona District on Analysis of the performance of family planning counselors can be concluded that the performance of family planning counselors has been running quite well in terms of quality and quantity which shows that the performance of the The family planning field counselor has carried out his duties ranging from counseling to evaluation can be proven from interview quotes, from several informants, documentation and from relevant data. Then there are still several factors that inhibit the occurrence of counseling including inadequate facilities and infrastructure, as well as human resources that are still less skilled due to the lack of training provided. Then it can be concluded that the Performance of Family Planning Field Extension has been going quite well.
Analisis Kinerja Alat Berat Pada Proyek Normalisasi dan Perkuatan Tebing Sungai Jaya, Ansar; Lakawa, Irwan; Hawa, Sitti; Bona, Muh Samtun
Sultra Civil Engineering Journal (SCiEJ) Vol 3 No 1 (2022): Sultra Civil Engineering Journal (SCiEJ)
Publisher : Universitas Sulawesi Tenggara

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (472.128 KB) | DOI: 10.54297/sciej.v3i1.239

Abstract

The purpose of this study was to analyze the performance of heavy equipment and the duration of time required to complete the Windo River Cliff Normalization and Reinforcement Project, Pamandati Village, Laeya District, South Konawe Regency. The results showed that the excavator's performance in excavation work (mechanical) was 38.68 m3/hour, dump truck 2.99 m3/hour. As for the embankment work imported from outside, the performance of the excavator is 98.53 m3/hour and the dump truck is 3.05 m3/hour. Where the duration of time required to complete the excavation work (mechanical) with an excavator is 12 days and for embankment work imported from outside is 2 days..