OPTIMASI PELAKSANAAN PROYEK KONSTRUKSI DENGAN METODE PERT DAN CPM Hi. Muhammad, Amiruddin
Jurnal Ilmiah Ecosystem Vol. 17 No. 2 (2017): Vol 17 No 2 (2017): Mei-Agustus 2017
Publisher : Lembaga Penelitian dan Pengabdian pada Masyarakat Universitas Bosowa

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Implementation of a project work requires not only a reliable human resources, but also must be supported by a good management. Planning project activities is an issue that is very important because it is the basis for project planning in order to be able to finish the projects implemented with time and cost optimal. Method PERT and CPMis a management tool that is associated with the planning and control of costs and time on a project. Both of these methods can be applied in carrying out the project, so that all work can be run according to plan and provide more satisfactory results. The purpose of this study was to evaluate the time and cost Development Project Market Sarimalaha Tidore Islands, North Maluku. In searching for the possibility of achieving time a project that has been planned in the schedule with the analysis using PERT method and analyze the time and cost of the project through the acceleration of activity using CPM method. The data used data is market development project Sarimalaha Tidore Islands. From the research that has been carried out showed that that the possibility of the project is completed in accordance with the Time scedulle based analysis using PERT method amounted to 98.42%. For the analysis of acceleration events with CPM method showed that that the maximum acceleration of the process of acceleration occurs when the project can be accelerated up to 162,17 days from 170 days when the original plan and the cost of the project rose to Rp.8.857.795.386,00 of plan costs prior to acceleration is Rp.8,775,686,914.00. Thus a reduction in project time for 7,83 days and increase the cost of Rp.82.108.472,00at the time of reaching the maximum acceleration.
Evaluasi Kinerja Kontraktor Dalam Proyek Jalan Setapak Masyarakat Hamisi, Rustam; Hi. Muhammad, Amiruddin; Adjam, Idhar
Jurnal Ilmiah Wahana Pendidikan Vol 11 No 12.A (2025): Jurnal Ilmiah Wahana Pendidikan
Publisher : Peneliti.net

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

One of the physical development programs implemented in Mafututu Village in the 2024 Fiscal Year is the Footpath Construction Project. This project is funded through the Mafututu Village Budget Implementation Document (DPA) as part of efforts to improve accessibility and mobility for communities in coastal areas. Specifically, this project was entrusted to the implementing contractor CV. Mafututu Indah with a total contract value of IDR 119,895,457.29 (One Hundred Nineteen Million Eight Hundred Ninety-Five Thousand Four Hundred Fifty-Seven Rupiah Twenty-Nine Sen). In accordance with the Work Agreement Letter (SPK), the project implementation period is set at ninety (90) calendar days, starting from the issuance of the Work Commencement Order (SPMK), with the aim of ensuring that the construction of this footpath is completed on time and can be immediately utilized by the residents of Mafututu Village. The research method used was quantitative descriptive with a case study approach on the Footpath Construction Project in Mafututu Village. Primary data was collected through field observations and interviews with respondents from the Public Works Agency, project owners, workers, the village government, and the community. The performance variables measured included quality (work quality) and cost (budget efficiency).
Analisis Penempatan Titik-Titik Rambu Lalu Lintas, di Jalan Lada Ake-Jaya Kota Tidore Kepulauan di Tinjau Dari Aspek Keamanan Muhammad, Farah Nur; Damayanti, Almiffa; Hi. Muhammad, Amiruddin; Altarans, Indra
Jurnal Ilmiah Wahana Pendidikan Vol 11 No 12.A (2025): Jurnal Ilmiah Wahana Pendidikan
Publisher : Peneliti.net

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This study aims to analyze the placement of traffic signs on the Lada Ake–Jaya route in Tidore Islands City from a road user safety perspective. This route is located in a mountainous area with terrain characteristics such as steep inclines, extreme descents, sharp turns, and limited visibility, which have the potential to increase the risk of accidents. Although police data shows no accidents in the past five years, observations and interviews with the public indicate six accident-prone areas that require attention, particularly due to the lack of warning signs, inadequate lighting, and limited visibility on several road segments