Claim Missing Document
Check
Articles

Found 2 Documents
Search

Analisis Kinerja Perawatan Bulanan (P1,P3,P6) Dipo KRL Depok Purwono, Agung; Muhardono, Muhardono; Ryanto, Azhar Hermawan
Jurnal Perkeretaapian Indonesia (Indonesian Railway Journal) Vol 3 No 1 (2019): Jurnal Perkeretaapian Indonesia Volume 3 Nomer 1 Tahun 2019
Publisher : Politeknik Perkeretaapian Indonesia Madiun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37367/jpi.v3i1.73

Abstract

Monthly Maintenance Depok Commuter Line Dipo is a place of care that forms inspection, preparation, storage, maintenance, and repair of rings counted monthly with regular maintenance, where P1 (maintenance every 1 month), P3 (maintenance every 3 months), and P6 (Treatment every 6 boasts). To support Commuter Line maintenance activities, the availability of spare parts / components, quantity and quality of human resources, work equipment, inspection equipment, location, conditions and supporting facilities are sufficient to facilitate maintenance. In conducting maintenance, Depok Commuter Line Dipo Monthly Maintenance has problems, including lack of maintenance equipment and maintenance personnel in the dipo are still lacking, both in terms of quality and quantity. To overcome this problem the method used is to identify the needs of the facility based on the MI (Maintenance Instructions) as a guide in carrying out maintenance and calculate the needs of employees both in number and quality or competence that must be owned by maintenance personnel. From the results of the analysis of the existing problems it can be concluded that the completeness of maintenance facilities in the form of work equipment is still damaged such as compressors and battery changers, lifting jacks, hydraulic jacks, and monthly manure Dipo KRL Depok still needs 24 additional maintenance personnel, and there are 19 People who have not yet participated in functional training competencies. Therefore, it is necessary to add work equipment facilities and increase human resources, as well as improve the quality and quantity of human resources to improve the performance of Depok Commuter Line Dipo Monthly Maintenance
Pengoptimalan Perawatan Kereta Untuk Meminimalkan Keterlambatan Perawatan Di Balai Yasa Manggarai Alfaris, Arif; Muhardono, Muhardono; Ryanto, Azhar Hermawan
Jurnal Perkeretaapian Indonesia (Indonesian Railway Journal) Vol 3 No 1 (2019): Jurnal Perkeretaapian Indonesia Volume 3 Nomer 1 Tahun 2019
Publisher : Politeknik Perkeretaapian Indonesia Madiun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37367/jpi.v3i1.74

Abstract

Balai Yasa Manggarai is a place to conduct periodic maintenance of railroad facilities. The train maintenance program at Balai Yasa Manggarai in the first quarter of 2017 every month maintenance occurs late in maintenance. To follow up on this problem, an analysis of maintenance support components is seen in terms of Human Resources, Maintenance Equipment, and Maintenance Facilities. Based on the analysis that has been done, it can be concluded that the needs of employees are in accordance with working hours but the competence of personnel does not meet the qualifications indicated by many who do not yet have a Certificate of Maintenance Expertise, there are many equipment that already have old age and maintenance facilities such as underpasses are not suitable because there are standing water that can interfere with the maintenance of the train. Based on the results of the analysis, it is hoped that train infrastructure operators will immediately implement competency enhancements for maintenance personnel, equipment and maintenance facilities in an effort to optimize train maintenance to minimize maintenance delays at Balai Yasa Manggarai