Claim Missing Document
Check
Articles

Found 16 Documents
Search

Perbaikan Proses Bisnis Keripik Pisang menggunakan Lean Business Model Canvas di PT. Dwihanz Sinergi Utama Sidoarjo Setyo, Wawan; Handriyanto, Bamban; Arfianto, Teguh; Wahyuningtias, Novi; Hariastuti, Ni Luh Putu; Daryanto, Daryanto
JURMATIS (Jurnal Manajemen Teknologi dan Teknik Industri) Vol. 6 No. 1 (2024): January
Publisher : Universitas Kadiri

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmatis.v6i1.5195

Abstract

Banana chips are one of the popular processed fruit products in foreign markets, such as in Australia, Singapore, and New Zealand. Research to improve optimal business processes. The research procedure reduced data through the analysis of interviews with five informants using BMC and LBMC to find the root of the problem as a guide. On improving business processes with the power of LBMC, the priority here is to find activities that are minimum mandatory to form value for customers. Revenue streams at LBMC include direct sales through its website or physical stores, wholesale partnerships with health food stores, gyms, and gyms, online marketplaces like Amazon or Shopee, as well as collaborations with airlines, hotels, and other hospitality businesses for in-flight snack options. This research contributes to the understanding of business process improvement in the food industry by providing practical insights in identifying customer segments, channels to reach them, cost structures, and revenue streams
Perencanaan Sistem Proteksi Generator dari Putaran Balik di PLTMH Totabuan ARFIANTO, TEGUH; HARIYANTO, NASRUN; SITOHANG, DELFAN TONIUS
ELKOMIKA: Jurnal Teknik Energi Elektrik, Teknik Telekomunikasi, & Teknik Elektronika Vol 6, No 3: Published September 2018
Publisher : Institut Teknologi Nasional, Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26760/elkomika.v6i3.436

Abstract

ABSTRAKPada penelitian ini penulis melakukan perhitungan, simulasi dengan aplikasi ETAP 12.6.0 kemudian membandingkan hasil simulasi dengan standar PLN. Pada setting relay daya balik penulis menerapkan standart IEEE C37.102-2006, daya balik generator dengan kapasitas 2 x 2,5 MW adalah 50000 watt dengan waktu tunda relay 10 detik. Sedangkan daya balik untuk generator kapasitas 4 x 0,7 MW adalah 14000 watt dengan waktu tunda relay 10 detik. Hasil yang didapat dari simulasi saat terjadi kenaikan tegangan 110% adalah 0,57 detik dan saat 130% adalah 0,105 detik. Sedangkan untuk setting relay tegangan saat terjadi turun tegangan 50% adalah 0,125 detik dan saat 80% adalah 1,25 detik. Hasil simulasi dengan standar PLN tidak jauh berbeda, waktu yang diterapkan PLN ketika naik tegangan 110% adalah 2 detik dan saat 130% adalah 0,1 detik kemudian untuk turun tegangan 50% adalah 0,1 detik dan saat 80% adalah 1 detik.Kata Kunci: Generator, Daya Balik, Proteksi, Setting, Relay ABSTRACTIn this study the authors perform calculations, simulations with software ETAP 12.6.0 and then compare the results of simulation with standard PLN. On setting power relay writer applying standart IEEE C37.102-2006, generator reverse power capacity 2 x 2.5 MW is 50000 watt with relay time delay 10 second. While reverse power for generator capacity 4 x 0,7 MW is 14000 watt with a 10 second delay time. The results obtained from simulation when there is a 110% increase voltage 0.57 seconds and when 130% is 0.105 seconds. As for the setting of voltage relay when there voltage drop of 50% is 0.125 seconds and when 80% is 1.25 seconds. The result of simulation with PLN standard is not much different, the time applied by PLN when the voltage rise of 110% adds 2 seconds and when 130% is 0.1 seconds later to drop the 50% voltage 0.1 second and 80% is 1 second.Keywords: Generator, Reverse Power, Proteksi, Setting, Relay
Analysis of the Contact Resistance of the 150 kV Vacuum Circuit Breaker at the Cigereleng Bay Line Lagadar Substation Arfianto, Teguh; Putri, Helmalia; Hariyanto, Nasrun
PROtek : Jurnal Ilmiah Teknik Elektro Vol 12, No 3 (2025): Protek : Jurnal Ilmiah Teknik Elektro
Publisher : Program Studi Teknik Elektro Universitas Khairun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33387/protk.v12i3.10451

Abstract

Power Circuit Breaker (PMT) is an electrical device used to connect or disconnect the flow of electricity at medium to high voltage. The purpose of this research is to evaluate the operational feasibility condition of the PMT Vacuum Circuit Breaker 150 kV installed on the Lagadar bay line. To what extent the device still meets the technical requirements according to the applicable standards, technical testing is conducted to determine the extent to which the PMT Vacuum Circuit Breaker 150 kV still meets the technical requirements according to the applicable standards. The methods used include insulation resistance testing, contact resistance testing, and contact bounce testing. This research was conducted by comparing the test results obtained with the standards. The contact resistance test yielded the following values phase R at 37 μΩ, phase S at 34 μΩ, and phase T at 40 μΩ, all of which are below the maximum threshold of 50 μΩ according to IEC 60694 standards. Meanwhile, in the contact synchronization test, the closing times were: phase R 74.60 ms, phase S 71.15 ms, and phase T 72.05 ms, and the opening times were: phase R 24.65 ms, phase S 30.80 ms, and phase T 24.70 ms. The time differences between phases are still within the acceptable synchronization limits (below 10 ms).
Optimasi Perencanaan Pembangkit Listrik Tenaga Surya (PLTS) Terpusat Wilayah Pulau Terluar Kristyadi, Tarsisius; Arfianto, Teguh
Infotekmesin Vol 12 No 2 (2021): Infotekmesin: Juli 2021
Publisher : P3M Politeknik Negeri Cilacap

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35970/infotekmesin.v12i2.672

Abstract

Air Glubi Village which is one of the villages in the Bintan Pesisir sub-district, Bintan Regency, Riau Islands province, is one of the villages that is one of the outer islands of Indonesia which still has no electricity, and is difficult to reach by PLN. In this village, there is no water source available for PLTMH, so the alternative for electricity supply in Air Glubi Village is a centralized PLTS. This paper discusses the planning of centralized PLTS in Air Glubi Village, Bintan Pesisir sub-district, Riau Islands province. Because the availability of land, the economic capacity of the population is limited, optimization is needed. This optimization is used to get the optimum electrical energy output with these various limitations. From primary data, electricity demand in the village is 62492 Wh per day. The optimization resulted in a centralized PLTS design with an off grid type with a capacity of 37 kWp. The main component is a solar module made of monocrystalin with a capacity of 200 Wp each, totaling 186 modules. The battery uses VRLA 200 Ah each, totaling 250 batteries. The change of Dc electricity to AC is carried out by utilizing an inverter with a capacity of 10 kW totaling 4 pieces. To build a centralized PLTS in Air Glubi Village need costs Rp 2,983,902,171.
Analisis Tahanan Pentanahan Kaki Tower SUTT 70 kV Rute Cigereleng-Majalaya Arfianto, Teguh; Ibnu, Adam
PROtek : Jurnal Ilmiah Teknik Elektro Vol 6, No 1 (2019): Protek : Jurnal Ilmiah Teknik Elektro
Publisher : Program Studi Teknik Elektro Universitas Khairun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33387/protk.v6i1.777

Abstract

Pentanahan merupakan salah satu cara proteksi listrik dari gangguan luar ataupun gangguan dalam. Salah satu gangguan yaitu gangguan petir, besarnya tahanan pentanahan kaki tower dapat mengakibatkan tegangan isolator naik yang dapat merusak peralatan dan lain-lain. Oleh karena itu salah satu usahanya yaitu dengan cara membuat sistem pentanahan di kaki tower transmisi dengan nilai pentanahan sekecil mungkin. Dengan didapatkannya hasil perhitungan sehingga dapat menghitung tahanan pentanahan kaki tower maka dapat menganalisa dengan cara membandingkan nilai pengukuran dengan perhitungan. Kaki tower transmisi Cigereleng-Majalaya memakai 9 rod batang yang ditanamkan dan dihubung secara paralel untuk sistem pentanahan. Dengan begitu diharapkan dapat mereduksi tahanan kaki pentanahan dibawah standar yaitu 5 ohm. Banyaknya elektroda rod berjumlah 9 dan di hubung parallel, dapat dilihat dari hasil perhitungan bahwa dari banyaknya tower transmisi cigereleng-majalaya yaitu berjumlah 48 tower, nilai resistansi total sistem paling besar yaitu 3,05 ohm dan yang paling rendah yaitu 1,61 ohm. Perbedaan nilai pengukuran dan perhitungan tidak berbeda jauh yaitu hanya 1,09 ohm. Hasil ini sangat baik karena di bawah standar maksimal tahanan tanah yaitu 5 ohm.
STUDI KEANDALAN SISTEM JARINGAN DISTRIBUSI 20 KV DARI GANGGUAN FAKTOR ALAM DI PT. PLN (PERSERO) RAYON CIMAHI SELATAN Arfianto, Teguh; Purbandoko, wahyu Agung
PROtek : Jurnal Ilmiah Teknik Elektro Vol 5, No 2 (2018): PRotek : Jurnal Ilmiah Teknik Elektro
Publisher : Program Studi Teknik Elektro Universitas Khairun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33387/protk.v5i2.705

Abstract

  Permintaan kebutuhan energi listrik di wilayah Kota Cimahi khususnya di wilayah Cimahi Selatan semakin bertambah dari waktu ke waktu sejalan dengan meningkatnya pertumbuhan ekonomi. Hingga saat ini, energi listrik merupakan salah satu sumber energi yang utama untuk mendukung aktivitas tersebut. Pemanfaatan energi listrik yang ada harus diimbangi dengan menjaga kualitas energi listrik itu sendiri. Upaya yang diperlukan untuk memenuhi pertumbuhan energi listrik tidak hanya memenuhi permintaan daya yang meningkat setiap tahun tetapi juga memperbaiki mutu keandalan pelayanan. Jaringan distribusi merupakan bagian dari sistem tenaga listrik yang paling dekat dengan pelanggan dan yang paling banyak mengalami gangguan, sehingga salah satu masalah utama dalam operasi sistem distribusi adalah mengatasi gangguan, sebab terjadinya banyak gangguan akan mempengaruhi indeks keandalan. Pada laporan ini, dilakukan perhitungan keandalan jaringan distribusi untuk mencari nilai indeks keandalan pada satu penyulang (feeder)dalam satu rayon yang betempat di PT. PLN (PERSERO) rayon Cimahi Selatan. Perhitungan ini berdasarkan nilai laju kegagalan (λ) dan lama perbaikan (r) dari masing-masing komponen yang digunakan dalam jaringan distribusi radial. Jumlah elemen atau komponen yang digunakan dan panjangnya jaringan akan mempengaruhi hasil nilai indeks keandalan. Penyulang yang dianalisis diambil dari Rayon Cimahi Selatan yaitu penyulang TOKYO. Hasil perhitungan menunjukkan total nilai SAIFI, SAIDI dan ASAI dalam kurun waktu satu tahun (2017) untuk penyulang TOKYO sebesar SAIFI 0,367 kali/tahun, SAIDI 2,62  menit/tahun dan ASAI 0,99%. Sedangkan pada standar yang ditargetkan oleh PT.PLN Rayon tersebut sebesar: SAIFI 0,91 kali/tahun, sedangkan SAIDI sebesar 35,73 menit/tahun. Maka pada penyulang TOKYO masih dikatakan andal untuk mendistribusikan listrik karena nilai perhitungan masih dibawah target yang telah ditetapkan.