Found 11 Documents
Search

Turbin Screw Untuk Pembangkit Listrik Skala Mikrohidro Ramah Lingkungan Saefudin, Encu; Kristyadi, Tarsisius; Rifki, Muhammad; Arifin, Syaiful
Jurnal Rekayasa Hijau Vol 1, No 3 (2017)
Publisher : Lembaga Penelitian dan Pengabdian Masyarakat Institut Teknologi Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1271.924 KB) | DOI: 10.26760/jrh.v1i3.1775

Abstract

ABSTRACTType screw water turbine is a type of water turbine which has the potential for small scale power plants, where water turbine screw type is suitable for rivers in parts of Indonesia because the operation of the turbine require only a low head turbine. With the potential of irrigation water streams at the rate of 0.3302 m3/s in Banjaran village allows the installation of the turbines type screw. In the process of designing a water turbine type screw to be optimized turbine screw to determine the value of the ratio d/D, and then calculating mechanically to determine the dimensions of the turbine blades, the turbine shaft, the transmission system (gears, pulleys and belt) as well as the power that can be produced by the turbines, by using a head of 1.05 meters. The results of this research are the technical specifications of the turbine screw with the design power of 2678.35 Watt. Performance test of the turbine was carried out in Nagrak village of Ciherang irrigation canals on Cangkuang Banjaran sub district. With variable discharge, measuring the speed of rotation of the shaft generator, the voltage and current that is produced as well as the efficiency of the turbine. From the results of testing gained 17.82 % efficiency, power turbine 531.84 Watts at discharge 0,277 m3/s.Keywords: Turbine, Head, Microhydro, OptimazedABSTRAKTurbin air tipe ulir adalah salah satu tipe turbin air yang berpotensi untuk pembangkit listrik skala kecil yang ramah lingkungan, dimana turbin air tipe ulir sangat cocok untuk sungai-sungai di wilayah Indonesia karena pengoperasian turbin ini hanya memerlukan head turbin yang rendah. Melihat potensi air aliran sungai irigasi dengan debit 0,3302 m3/s yang berada di Desa Banjaran memungkinkan pemasangan turbin tipe ulir. Pada proses perancangan turbin air tipe ulir dilakukan optimasi turbin screw dengan menentukan nilai perbandingan d/D, lalu melakukan perhitungan mekanikal untuk menentukan dimensi dari sudu turbin, poros turbin, sistem transmisi (roda gigi, puli dan belt) juga daya yang mampu dihasilkan turbin, dengan head 1,05 meter. Hasil dari penelitian ini berupa spesifikasi teknis turbin ulir dengan daya hasil rancangan sebesar 2678,35 Watt dan gambar 2 dimensi serta 3 dimensi turbin ulir hasil rancangan. Hasil perancangan kemudian direalisasikan. Untuk mengetahui kinerja turbin dilakukan pengujian yang dilaksanakan di saluran Irigasi Ciherang Desa Nagrak Kecamatan Cangkuang Banjaran. Dengan variabel ukur yaitu debit, kecepatan putaran poros generator, voltase dan arus yang dihasilkan serta efisiensi turbin. Dari hasil pengujian didapat efisiensi 17.82 %, Daya turbin 531.84 Watt pada debit 0,277 m3/s.Kata kunci: Turbin, Head, Mikrohidro, Optimasi
Stress Simulation of Chassis Crossover Electric Vehicle Tito Shantika; Tarsisius Kristyadi; Hendra Hendra
JURNAL KAJIAN TEKNIK MESIN Vol 5, No 1 (2020): Jurnal Kajian Teknik Mesin
Publisher : Universitas 17 Agustus 1945 Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (436.268 KB) | DOI: 10.52447/jktm.v5i1.2417

Abstract

The development of an electric vehicle chassis is one step in the design process of a vehicle, especially for crossover vehicles that are being designed. The chassis design of the vehicle must have a chassis that is solid and can sustain all the loads that occur on the chassis, such as passenger loads, electric motors and so on. In the chassis design process, stress analysis is needed to verify the strength of the chassis if the loads that are applied. Stress analysis begins with making an initial model of an existing chassis using CAD then stress analysis using FEA Solidworks software. Stress analysis includes static and crash load. The results of the analysis under static load conditions obtained a maximum stress that occurs at 206 MPa, a factor of safety = 1.69, and a deflection of 0.4 mm where the chassis deflection due to bending is less than 1 mm. Keywords: chassis, EV, strength simulation, FEA.
Optimasi Perencanaan Pembangkit Listrik Tenaga Surya (PLTS) Terpusat Wilayah Pulau Terluar Tarsisius Kristyadi; Teguh Arfianto
Infotekmesin Vol 12 No 2 (2021): Infotekmesin: Juli 2021
Publisher : P3M Politeknik Negeri Cilacap

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35970/infotekmesin.v12i2.672

Abstract

Air Glubi Village which is one of the villages in the Bintan Pesisir sub-district, Bintan Regency, Riau Islands province, is one of the villages that is one of the outer islands of Indonesia which still has no electricity, and is difficult to reach by PLN. In this village, there is no water source available for PLTMH, so the alternative for electricity supply in Air Glubi Village is a centralized PLTS. This paper discusses the planning of centralized PLTS in Air Glubi Village, Bintan Pesisir sub-district, Riau Islands province. Because the availability of land, the economic capacity of the population is limited, optimization is needed. This optimization is used to get the optimum electrical energy output with these various limitations. From primary data, electricity demand in the village is 62492 Wh per day. The optimization resulted in a centralized PLTS design with an off grid type with a capacity of 37 kWp. The main component is a solar module made of monocrystalin with a capacity of 200 Wp each, totaling 186 modules. The battery uses VRLA 200 Ah each, totaling 250 batteries. The change of Dc electricity to AC is carried out by utilizing an inverter with a capacity of 10 kW totaling 4 pieces. To build a centralized PLTS in Air Glubi Village need costs Rp 2,983,902,171.
Turbin Screw Untuk Pembangkit Listrik Skala Mikrohidro Ramah Lingkungan Encu Saefudin; Tarsisius Kristyadi; Muhammad Rifki; Syaiful Arifin
Rekayasa Hijau : Jurnal Teknologi Ramah Lingkungan Vol 1, No 3 (2017)
Publisher : Institut Teknologi Nasional, Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26760/jrh.v1i3.1775

Abstract

ABSTRACTType screw water turbine is a type of water turbine which has the potential for small scale power plants, where water turbine screw type is suitable for rivers in parts of Indonesia because the operation of the turbine require only a low head turbine. With the potential of irrigation water streams at the rate of 0.3302 m3/s in Banjaran village allows the installation of the turbines type screw. In the process of designing a water turbine type screw to be optimized turbine screw to determine the value of the ratio d/D, and then calculating mechanically to determine the dimensions of the turbine blades, the turbine shaft, the transmission system (gears, pulleys and belt) as well as the power that can be produced by the turbines, by using a head of 1.05 meters. The results of this research are the technical specifications of the turbine screw with the design power of 2678.35 Watt. Performance test of the turbine was carried out in Nagrak village of Ciherang irrigation canals on Cangkuang Banjaran sub district. With variable discharge, measuring the speed of rotation of the shaft generator, the voltage and current that is produced as well as the efficiency of the turbine. From the results of testing gained 17.82 % efficiency, power turbine 531.84 Watts at discharge 0,277 m3/s.Keywords: Turbine, Head, Microhydro, OptimazedABSTRAKTurbin air tipe ulir adalah salah satu tipe turbin air yang berpotensi untuk pembangkit listrik skala kecil yang ramah lingkungan, dimana turbin air tipe ulir sangat cocok untuk sungai-sungai di wilayah Indonesia karena pengoperasian turbin ini hanya memerlukan head turbin yang rendah. Melihat potensi air aliran sungai irigasi dengan debit 0,3302 m3/s yang berada di Desa Banjaran memungkinkan pemasangan turbin tipe ulir. Pada proses perancangan turbin air tipe ulir dilakukan optimasi turbin screw dengan menentukan nilai perbandingan d/D, lalu melakukan perhitungan mekanikal untuk menentukan dimensi dari sudu turbin, poros turbin, sistem transmisi (roda gigi, puli dan belt) juga daya yang mampu dihasilkan turbin, dengan head 1,05 meter. Hasil dari penelitian ini berupa spesifikasi teknis turbin ulir dengan daya hasil rancangan sebesar 2678,35 Watt dan gambar 2 dimensi serta 3 dimensi turbin ulir hasil rancangan. Hasil perancangan kemudian direalisasikan. Untuk mengetahui kinerja turbin dilakukan pengujian yang dilaksanakan di saluran Irigasi Ciherang Desa Nagrak Kecamatan Cangkuang Banjaran. Dengan variabel ukur yaitu debit, kecepatan putaran poros generator, voltase dan arus yang dihasilkan serta efisiensi turbin. Dari hasil pengujian didapat efisiensi 17.82 %, Daya turbin 531.84 Watt pada debit 0,277 m3/s.Kata kunci: Turbin, Head, Mikrohidro, Optimasi
Analisa Prestasi Pembangkit Listrik Tenaga Uap (PLTU) Berbahan Bakar BatuBara Hasil Upgrading Cecep Deni Mulyadi; Tarsisius Kristyadi; Alexin Putra; Dani Rusirawan
Infotekmesin Vol 12 No 1 (2021): Infotekmesin: Januari 2021
Publisher : P3M Politeknik Negeri Cilacap

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35970/infotekmesin.v12i1.370

Abstract

Coal is a cheap fuel, so it is widely used by steam power plants (PLTU). With many PLTUs using coal, the demand for coal  increases and the quality of the coal is decreasing and the price continues to rise. With this problem, it is necessary to improve  coal quality, one of which is by upgrading using a gas exhaust boiler. With using rotary dryer, the coal will be upgraded from low calorie to high calorie by reducing the moisture content, which will then be applied to the tempo cycle software 5.1. After application at cycle tempo 5.1, the best efficiency increase for PLTU can be increased efficiency and decrease coal rate, which is best obtained in the third experiment which achieved 37,041% efficiency with a coal rate of 17,567 kg / s.
Perancangan pembuatan dan pengujian pembangkit listrik tenaga motor gas Arif Rachman Saputra; Tarsisius Kristyadi
Jurnal Taman Vokasi Vol 10 No 2 (2022)
Publisher : Universitas Sarjanawiyata Tamansiswa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30738/jtvok.v10i2.13519

Abstract

Pembangkit listrik tenaga motor gas merupakan salah satu pembangkit yang memanfaatkan gas sebagai bahan bakarnya. Pembangkit listrik tenaga motor gas merupakan salah satu pembangkit yang memanfaatkan gas sebagai bahan bakarnya. Pembangit listrik tenaga motor gas memiliki kadar karbon yang rendah sehingga dapat menekan pencemaran udara. Berbagai penelitian dan pengembangan pembangkit listrik dengan menggunakan bahan bakar gas membuahkan hasil yang baik.. Dengan penggunaan bahan bakar gas pembangkitan dapat dilakukan untuk pembangkitan skala kecil yang menggunakan motor bakar torak sebagai penggerak generator listrik. Pada penelitian ini motor bakar torak dirancang dibuatkan komponen pendukung dan di lakukan pengujian untuk mengetahui efisiensi dari bahan bakar tersebut. Untuk pengujian.di gunakan bahan bakar cair yang mudah di dapat untuk perbandingan.  Generator yang di gerakan oleh motor bakar memiliki kapasitas pembangkit 2.2 kw. Selama  60 menit dibutuhkan konsumsi bahan bakar yang berbeda dari setiap jenis bahan bakarnya. Pada pengujian ini di gunakan 3 jenis bahan bakar diantaranya, pertalite, pertamax, dan LPG. Dari hasil pengujian di dapat perbedaan yang sangat signifikan pada konsumsi bahan bakar. Dalam waktu 60 menit bahan bakar yang di butuhkan untuk pertalite 1.20 kg  sedangkan pertamax 1.13 kg , untuk bahan bakar LPG 0.786 kg. dan kadar karbon yang di hasilkan untuk bahan bakar LPG lebih rendah di bandingkan nahan bakar lainnya, sehingga bahan bakar gas dapat di katagorikan bahan bakar yang ramah lingkungan dan sangat efisien dalam penggunaan.
Solar energy utilization in desalination power plan Erdiansyah; Kristyadi Tarsisius; Diki Ismail Permana
JTTM : Jurnal Terapan Teknik Mesin Vol 4 No 1 (2023): JTTM: Jurnal Terapan Teknik Mesin
Publisher : Teknik Mesin - Sekolah Tinggi Teknologi Muhammadiyah Cileungsi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37373/jttm.v4i1.527

Abstract

A steam power plant (PLTU) uses demin water to generate 3x350 MW of electrical energy. Reverse Osmosis Desalination system is used to treat the 190 m3/hour of desalinated water that is produced from seawater. Solar energy will replace the 225.41 kW of electrical energy required for the RO desalination pump in order to lessen pollution and the greenhouse effect caused by PLTU. The PLTU is situated in Pelabuhan Ratu Sukabumi, West Java. This region has a solar radiation potential of 3.189 kWp/day/m2 and a deployment space for PV modules of 6,167 m2, divided into two zones: the ground and the roof. The needs analysis is carried out by utilizing software simulations that estimate the power requirements of desalination pumps and the potential of electrical energy from solar radiation based on land availability. According to the modeling findings, PLTS can produce 1024 MWh/year of electrical energy with 1,458 pieces of 450 Wp PV modules and 5 units of 120 kW inverters.
Studi kelayakan pembangunan sistem pembangkit listrik tenaga hybrid di pulau X Gilang Danu Suciawati Pamungkas; Tarsisius Kristyadi; Sigit Purnomo; Abdullah Syafiq
Jurnal Taman Vokasi Vol 11 No 1 (2023)
Publisher : Universitas Sarjanawiyata Tamansiswa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30738/jtvok.v11i1.13525

Abstract

Indonesia dikenal sebagai negeri seribu pulau salah satunya adalah pulau X. dimana pulau X adalah kepulauan di laut jawa yang memiliki luas daratan ± 1.500 hektar dan perairan ± 110.000 hektar. Pulau X memiliki jumlah penduduk ± 8.733 jiwa di lima pulau yang berpenghuni. Indonesia saat ini bahkan di dunia dikarenakan adanya ketidakseimbangan ketersediaan energi dengan kebutuhan listrik maka salah satu alternatif solusinya yaitu melakukan studi kelayakan pembangunan sistem pembangkit listrik. Pada studi kelayakan pembangunan sistem pembangkit listrik tenaga hybrid dengan menggunakan kombinasi sistem pembangkit PLTS, PLTD, dan PLTB tersebut berencana untuk mensuplai listrik di wilayah pulau X dengan melakukan studi kelayakan pembangunan sistem pembangkit listrik tenaga hybrid menggunakan software HOMER yang bertujuan untuk mendesain, melakukan simulasi sistem pembangkit listrik tenaga hybrid. Pada sistem pembangkit listrik tenaga hybrid untuk melakukan studi kelayakan pembangunan sistem pembangkit listrik tenaga hybrid kebutuhan listrik di pulau X saat ini untuk PLTD mensuplai sebesar 500 kW, sedangkan untuk PLTS mensuplai sebesar 100 kW, dan untuk mensuplai sebesar PLTB sebesar 150 kW dengan menghasilkan total beban listrik sebesar ± 33487,01 kWh/day. Kata kunci : pembangkit listrik tenaga hybrid, PLTS, PLTD, PLTB, Software HOMER. Indonesia is known as the land of a thousand islands, one of which is Island X. Island X is an archipelago in the Java Sea which has a land area of ​​± 1,500 hectares and waters of ± 110,000 hectares. Island X has a population of ± 8,733 people on five inhabited islands. Indonesia is currently even in the world due to an imbalance in energy availability with electricity needs, one alternative solution is to conduct a feasibility study on the construction of a power generation system. In the feasibility study for the construction of a hybrid power generation system using a combination of PLTS, PLTD, and PLTB generation systems, the plan is to supply electricity in the X island region by conducting a feasibility study for the construction of a hybrid power generation system using the HOMER software which aims to design, to simulate a hybrid power generation system. In the hybrid power generation system, to carry out a feasibility study for the construction of a hybrid power generation system, the electricity needs on island X are currently supplies 500 kW for PLTD, while for PLTS it supplies 100 kW, and for PLTB supplies 150 kW by generating a total load electricity of ± 33487.01 kWh/day. Keywords: hybrid power plants, PLTS, PLTD, PLTB, HOMER Software.
PENGEMBANGAN PEMBANGKIT LISTRIK HYBRID UNTUK MEMENUHI KEBUTUHAN LISTRIK DESA CIPEUJEUH, KABUPATEN BANDUNG Tarsisius Kristyadi; Agus Hermanto; Eka Taufiq; Noviyanti Nugraha; Teguh Arfianto; Febrian Hadiatna
Jurnal Abdimas Ilmiah Citra Bakti Vol 4 No 2 (2023)
Publisher : STKIP Citra Bakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.38048/jailcb.v4i2.1606

Abstract

Desa Cipeujeuh merupakan salah satu desa di kecamatan Pacet kabupaten Bandung yang membutuhkan listrik untuk penerangan jalan, pengelolaan kolam, dan pengelolaan air bersih. Ada potensi sumber energi yang dapat dimanfaatkan untuk menghasilkan listrik yaitu aliran air irigasi dan potensi sinar matahari. Tujuan kegiatan ini adalah memberdayakan masyarakat desa Cipeujeuh supaya dapat mengelola sumber energi terbarukan untuk keperluan masyarakat desa tersebut. Mitra kegiatan ini adalah pemerintah desa Cipeujeuh kabupaten Bandung Jawa barat. Pengabdian dilakukan dengan memberikan pendampingan dalam instalasi dan pengelolaan pembangkit listrik hybrid. Pembangkit listrik ini merupakan hasil penelitian dari dosen Itenas yaitu turbin aksial horizontal dengan head yang sangat rendah. Turbin ini dipasang untuk memanfaatkan saluran irigasi buatan yang ada di Desa Cipeujeuh bersama-sama dengan PLTS membentuk pembangkit listrik hybrid. Manfaat kegiatan ini adalah listrik yang dihasilkan dapat digunakan untuk penerangan jalan, aerasi kolam, dan untuk menjalankan sistem air bersih. Kontribusi mitra adalah penyediaan lokasi, peralatan dan sarana untuk pembangkit listrik. Mereka berperan aktif dalam pelaksanaan kegiatan ini yaitu dalam pengoperasian dan perawatan serta proses pembangunan pembangkit listrik. Mitra melaksanakan pemasangan, pengoperasian dan perawatan berdasarkan teknologi yang ditawarkan. Hasil kegiatan pengabdian masyarakat ini adalah perangkat pembangkit listrik hybrid yang dapat dimanfaatkan untuk penerangan, kebutuhan air minum, dan aerasi kolam ikan sehingga masyarakat tidak perlu mengeluarkan biaya listrik untuk keperluan tersebut
Simulasi Perpindahan Panas Pada Pipa Secondary Super Heater (SSH) PLTU 600 MW dengan CFD Gugum Gumilar; Tarsisius Kristyadi
Jurnal Teknik: Media Pengembangan Ilmu dan Aplikasi Teknik Vol 22 No 1 (2023): Jurnal Teknik - Media Pengembangan Ilmu dan Aplikasi Teknik
Publisher : Fakultas Teknik - Universitas Jenderal Achmad Yani

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55893/jt.vol22no1.517

Abstract

The boiler is an important unit in the PLTU in which there is a Superheater to heat the steam so that increase and becomes superheated steam. The problem is secondary superheater pipe bursts due to excessive heat due to the deposit of the oxide layer in it. This study aims to simulate heat transfer in SSH pipes. with Computational Fluid Dynamics, 3 models are made, without a blockage, blockage at the end, and blockage in the middle. The simulation in a steady state, boiler operational data ; pressure, temperature, velocity flow and mass flow rate. The results show different color profiles for temperature, flow velocity and pressure for the steam and for flue gas. Flue gas heat transfer rate is higher around 800,000 kW, and steam is around 80 kW, Steam mass flow rate is 0.046 kg/s while in the flue gas area it is 0.130 kg/s. The average steam flow rate is around 1 m/s, the maximum is 12 m/s in blocked pipe models, Flue gas flow rate is around 9 to 10 m/s. The average steam temperature is 600°C, and 800°C to 900°C. Steam pressure constant in 16,000,000 Pa and flue gas pressure is 100,000 Pa.