Claim Missing Document
Check
Articles

Found 11 Documents
Search

PERENCANAAN ULANG TRAFFIC LIGHT PADA SIMPANG PRESIDEN KOTA PADANG Bayu Budi Irawan
Racic : Rab Construction Research Vol. 5 No. 1 (2020): Juni
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (805.548 KB) | DOI: 10.36341/racic.v5i1.1355

Abstract

In 2019 the presidential intersection was renovated by installing traffic lights, increasing the number of lanes, and geometric changes to the Jhoni Anwar road arm. The redesign is done by widening the road on the Jhoni Anwar (T) arm from 6.5 m to 9 m and the application turns left following the Traffic Light (PLT) on the arm of Jhoni Anwar (B). The recalculation results obtained a DS value of 0.83 with a service level "D" that is the current is approaching unstable, the speed is still controlled, Q / C can still be tolerated. The value of the average intersection delay is 37.75 sec / pcu. The queue length of the Khatib Sulaiman (U) 84 m, (S) 95 m, (T) 58 m, and the Jhoni Anwar (B) intersection arm 47 m. Budget Cost needed for Traffic Light planning is Rp. 328,959,800,-.