ALTERNATIF PERCEPATAN WAKTU DENGAN PENERAPAN METODE TIME COST TRADE OFF PADA PROYEK PEMBANGUNAN JEMBATAN (Studi Kasus: Proyek Pekerjaan Jembatan Rangka Baja Namploh Kec. Samalanga Kab. Bireuen, Aceh) Syarifah Keumala Intan; Abdul Muhyi; Nana Maulana Tengku
Portal: Jurnal Teknik Sipil Vol 10, No 2 (2018)
Publisher : Politeknik Negeri Lhokseumawe

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30811/portal.v10i2.984

Abstract

Pelaksanaan memiliki batas waktu (deadline) yang terikat dalam kontrak, artinya proyek harus diselesaikan sebelum atau tepat pada waktu yang telah ditentukan. Keterlambatan pekerjaan proyek dapat diantisipasi dengan melakukan percepatan dalam pelaksanaannya. Tujuan penelitian ini adalah untuk menganalisis perubahan biaya dan mendapatkan waktu optimal yang dibutuhkan. Metode yang dipakai adalah Time Cost Trade Off (TCTO). Data yang digunakan yaitu data sekunder berupa data RAB dan kurva “S” dari pekerjaan yang ditinjau yaitu “Pembangunan Jembatan Rangka Baja Namploh Kec. Samalanga Kab Bireuen”. Perencanaan waktu pelaksanaan untuk mengetahui waktu total proyek dan mendapatkan lintasan kritis digunakan program Microsoft Project 2016. Dari hasil pembahasan mekanisme pengendalian waktu dengan metode Time Cost Trade Off (TCTO) diperoleh kesimpulan bahwa biaya dan waktu yang optimal yakni sebesar Rp.7.136.781.877,73 dari biaya normal sebesar Rp.6.890.880.412,85 dengan waktu 202 hari dari waktu normal 210 hari kerja. Dengan melakukan penambahan waktu lembur 2 jam. Presentase kenaikan biaya total proyek sebesar 4% dan mempercepat durasi total sebesar 4 %.
APLIKASI SOFTWARE SWMM UNTUK STUDI PERMASALAHAN BANJIR PADA KAWASAN POLITEKNIK NEGERI LHOKSEUMAWE Ibrahim Ibrahim; Abdullah Irwansyah; Syarifah Keumala Intan
Portal: Jurnal Teknik Sipil Vol 10, No 1 (2018)
Publisher : Politeknik Negeri Lhokseumawe

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30811/portal.v10i1.969

Abstract

Drainase berfungsi untuk memutus kelebihan air permukaan sehingga tidak mengganggu aktivitas manusia dan merusak infrastuktur lainnya. Kawasan Kampus Politeknik Negeri Lhokseumawe dan sekitarnya terdapat permasalahan drainase ini terutama banjir. Banjir ini terjadi hampir setiap tahunnya sehingga menggangu aktivitas perkantoran dan menyebabkan kerusakan dan ketidaknyaman. Untuk menjawab permasalahan ini perlu dilakukan analisa untuk mendapatkan sumber permasalahan dan solusi yang dapat dilakukan dalam rangka menyelesaikan permasalahan banjir pada Kawasan Politeknik Negeri Lhokseumawe. Penelitian ini bertujuan untuk meninventarisasi sistem/saluran drainase yang sudah ada/existing; mendapatkan peta topografi kawasan Penelitian; menganalisa kapasitas  saluran dengan menggunakan software SWMM (Storm   Water Management Model); dan merekomendasi sistem dan dimensi saluran. Berdasarkan hasil running model yang telah dilakukan, dihasilkan bahwa pada pias dari j29 (depan Jurusan Teknik Sipil) sampai dengan o5 (saluran di pintu masuk utama) terjadi permasalahan yaitu adalah luapan pada dua lokasi yaitu pada lokasi depan Mesjid dan lokasi depan kantin). Untuk mengatasi masalah ini salah satu cara yang dapat dilakukan adalah dengan memperbesar dimensi saluran pada lokasi tersebut. Berdasarkan hasil model SWMM dimensi yang sesuai untuk lokasi pertama adalah dengan ukuran 50 x 50 cm dan lokasi kedua adalah dengan ukuran 60 x 80 cm.
Kajian Potensi Genangan dan Waktu Tiba Tsunami Di Kota Lhokseumawe Ibrahim; Tursina; Syarifah Keumala Intan; Mirza Fahmi; Zairipan Jaya; Abdullah Irwansyah
Jurnal Serambi Engineering Vol. 9 No. 2 (2024): April 2024
Publisher : Faculty of Engineering, Universitas Serambi Mekkah

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Lhokseumawe was one of the towns affected by the 2004 tsunami. During the last tsunami, tsunami waves arrived last on the coast of Lhokseumawe compared to the western and northern coastal areas of Aceh. Therefore, this tsunami modelling study was conducted to determine the arrival time of tsunami waves onthe coast of Lhokseumawe city and to determine the affected areas from the tsunami inundation map information. The method used is tsunami numerical modelling using the COMCOT (Cornell Multi Grid Coupled Tsunami Model) model. The earthquake source used to generate the tsunami is a 9.15 Mw earthquake of the magnitude of the 2004 earthquake, 8.0 Mw and 8.5 Mw earthquake scenarios. Bathymetric data were used to provide information on sea depth and topographic data to provide information on land elevation in the study area. Observation points were placed on the coast to record when the waves reached the coast. The maximum tsunami height occurred in Blang Mangat subdistrict with a tsunami height of 5 m and inundation distance of 1 km. The arrival time of the tsunami in Lhokseumawe town was 75-80 min after the earthquake. This information on tsunami height and arrival time can be used as preliminary information for tsunami mitigation planning and rapid response in the event of an earthquakewith tsunami potential.
Analisis Risiko Konstruksi Bangunan Gedung Bertingkat Sedang Dengan Metode HIRARC Reisya Nabila Hasibuan; Syarifah Keumala Intan; Herri Mahyar
Jurnal Serambi Engineering Vol. 9 No. 4 (2024): Oktober 2024
Publisher : Faculty of Engineering, Universitas Serambi Mekkah

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Construction projects are inherently dynamic and entail a certain degree of risk, particularly in the context of the construction of an eight-story building. The occurrence of risks within a project can result in financial losses, necessitating the identification and evaluation of potential risks. In this study, a construction risk analysis was conducted on a medium-rise building comprising eight floors, employing the Hazard Identification, Risk Assessment and Risk Control (Hirarc) method. A quantitative descriptive research study was conducted using a purposive sampling method, with a total of 36 respondents. The primary data were collected in the form of questionnaires, while the secondary data were sourced from Job Safety Analysis (JSA), K3 audit reports, and plan drawings. The quantitative descriptive questionnaire instrument was found to be valid and reliable. The results of the hazard identification process, based on data obtained from secondary sources, identified 45 potential risks. These were then subjected to a risk assessment based on probability and severity. The risk assessment results indicate that there is one high-risk activity, namely the modification of the structural design of the columns, beams, and floor plates. Additionally, there are 44 risks classified as moderate-risk. The most effective risk control strategy from an engineering perspective is to implement a flexible material procurement schedule, which facilitates improved communication and coordination. From an administrative standpoint, monitoring and evaluation represent key risk control measures.
Evaluasi Kinerja Saluran Drainase Pada Jalan Nasional Di Kawasan Politeknik Negeri Lhokseumawe Ibrahim, Ibrahim; Tursina, Tusina; Reza, Muhammad; Irwansyah, Abdullah; Ibrahim, Salwa Fitria; Intan, Syarifah Keumala
VOCATECH: Vocational Education and Technology Journal Vol 7, No 2 (2025): December
Publisher : Akademi Komunitas Negeri Aceh Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.38038/vocatech.v7i2.246

Abstract

Abstract Inadequate drainage management compromises community safety and comfort, leading to recurrent flooding in the areas surrounding the Politeknik Negeri Lhokseumawe campus, Cut Mutia General Hospital, and nearby areas. During periods of high rainfall intensity, approximately 100–150 mm/day, flooding commonly occurs in these areas almost every year. Flood depths can reach 50–100 cm, preventing vehicles from passing and resulting in long traffic congestion. This study aims to predict the magnitude of excess runoff discharge in the drainage channels along the studied road section. The Storm Water Management Model (SWMM) was employed to analyse channel capacity using data from existing drainage inventories, topographic maps, rainfall data, and land-use information. The results of the performance analysis and evaluation indicate that the design rainfall for the 2-year and 5-year return periods at the station are 106.01 mm/day and 155.56 mm/day, respectively. The flow pattern in the study area is divided into two outfalls, discharging into the Alue Raya tributary and the Alue Awe channel. The flood discharge in the channel leading to the Alue Awe tributary is 4.05 m³/s for the 2-year return period and 6.15 m³/s for the 5-year return period. Based on the discharge associated with the 2-year return period and the existing channel condition, which is filled with sediment up to a height of 50 cm, the channel is unable to accommodate the flow. As a result, overtopping occurs with a flood volume of 22,083.00 m³. This overflow has the potential to cause inundation around the drainage channel or along the road within the study area.Keywords:Drainage; Flooding; Raifall AbstrakPengelolaan drainase yang kurang baik sering menjadi sumber berbagai permasalahan, terutama ketika rasa aman dan nyaman masyarakat terhadap ancaman banjir dan pencemaran tidak terpenuhi. Permasalahan serupa juga terjadi di kawasan Kampus Politeknik Negeri Lhokseumawe, Rumah Sakit Umum Cut Mutia, serta wilayah sekitarnya, yang kerap mengalami gangguan drainase berupa banjir. Ketika hujan dengan intensitas tinggi, sekitar 100–150 mm/hari, kawasan tersebut sering mengalami banjir terjadi hampir setiap tahun. Ketinggian genangan air dapat mencapai 50–100 cm yang menyebabkan kendaraan tidak dapat melintas dan terjadi antrean panjang. Penelitian ini bertujuan memprediksi besaran debit air yang melimpah pada saluran diruas jalan ini. Metode yang digunakan untuk menganalisa kapasitas saluran dengan menggunakan software SWMM (Storm Water Management Model) dimana data yang digunakan berupa inventarisasi saluran drainase yang sudah ada, peta topografi, curah hujan dan tutupan lahan. Dari hasil analisis dan evaluasi kinerja menunjukkan bahwa curah hujan rencana periode ulang 2 tahun dan 5 tahun stasiun adalah 106.01 mm/hari dan 155.56 mm/hari. Pola aliran pada kawasan studi terbagi kepada dua outfall yaitu ke anak sungai Alue Raya dan Alue Awe. Debit banjir pada saluran yang menuju anak sungai Alur raya adalah 4.05 m3/det untuk periode ulang 2 tahun dan 6.15 m3/det untuk periode ulang 5 tahun. Berdasarkan debit dengan periode ulang 2 tahun dan kondisi saluran existing (dipenuhi dengan sedimen setinggi 50 cm) maka saluran ini tidak dapat menampung debit. Akibatnya terjadi luapan dengan volume air sebesar 22.083,00 m3 yang berpotensi terjadinya genangan disekitar saluran atau pada jalan di sepanjang daerah studi.Kata Kunci:Banjir; Drainase; Hujan